Installation of solar system at STRAUSS Auto Salon Kft. (Q3935732)

From EU Knowledge Graph
Revision as of 21:56, 8 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Adding English translations)
Jump to navigation Jump to search
Project Q3935732 in Hungary
Language Label Description Also known as
English
Installation of solar system at STRAUSS Auto Salon Kft.
Project Q3935732 in Hungary

    Statements

    0 references
    0 references
    14,334,400 forint
    0 references
    39,637.63 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    71,245.241 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    26,062,545.455 forint
    0 references
    55.0 percent
    0 references
    16 October 2020
    0 references
    30 September 2022
    0 references
    STRAUSS AUTÓSZALON Kereskedelmi Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°13'44.83"N, 16°37'7.54"E
    0 references
    A projekt során az alábbi fejlesztés valósul meg: Napelemes rendszer telepítése. A tetőn elhelyezett összesen 49,6 kWp teljesítményű napelemrendszer beüzemelése valósul meg. A projekt előkészítése során idáig megtörtént a projekt megfelelő előkészítése. Felkértük a Felhívásnak előírásainak mindenben megfelelő a Magyar Mérnöki Kamara névjegyzékében szereplő, cégünktől független SZÉS6 jogosultsággal rendelkező szakértőt, hogy készítse el a pályázat benyújtásához szükséges energetikai számításokat, és nyilatkozatokat. A nyilatkozatokat a pályázat mellékleteként csatoltuk. Felkértük a tervezőt a megfelelő tervek elkészítésére. Elkészült a műszaki leírás, valamint a tervrajzok, amelyeket szintén a pályázat mellékleteként csatoltunk. Utánajártunk annak, hogy az építési beruházás nem engedélyköteles tevékenység, így építési engedély beszerzése nem vált szükségessé. A projekt legfontosabb következő lépései a kivitelezési munkák megrendelése, a műszaki ellenőrrel történő egyeztetés, majd a kivitelezés nyomon követése, dokumentálás és végül az elszámolás. A kivitelezési munkák megfelelő színvonalú elkészítését ME-V jogosultsággal rendelkező műszaki ellenőr fogja felügyelni. A projekt végén az elszámoláshoz szükséges nyilatkozatok, valamint a hálózathasználati szerződés beszerzése történik, ezt követően benyújtásra kerül a záró elszámolás. A megvalósítás során külsős, tapasztalattal rendelkező projkektmenedzser segíti majd a megvalósítást. A projektmenedzser 10 éves pályázati projektmegvalósítási tapasztalattal rendelkezik, több, sikeresen megvalósult épületenergetikai projekt megvalósítását koordinálta már. Jelen projekt keretében csak a napelemes rendszer beruházásának költségeit kívánjuk elszámolni. Megvalósítani kívánt célterületek: A. Megújuló energiafelhasználás növelését célzó tevékenységek III. Napelemes rendszer telepítése hálózati villamosenergia-termelés céljából, kizárólag a fejlesztésben érintett épület és az abban folyó gazdasági-termelési folyamatok villamosenergia-ellátásához Ide terveztünk be a 124 db panelből álló, Luxor Eco Line 400 Wp Monokristályos napelemekből álló, összesen 49,6 kWp teljesítményű napelemrendszer díját. A napelemek a tetőn kerülnek elhelyezésre. A rendszerhez 1 db SolarEdge SE 60 K Inverter kerül beszerzésre. (Hungarian)
    0 references
    The following development will be carried out during the project: Installation of solar system. A solar system with a total capacity of 49.6 kWp installed on the roof is installed. The project has been properly prepared to date during the preparation of the project. We have invited an expert with SZÉS6 privileges from the Hungarian Chamber of Engineers, which is independent of our company, to prepare the energy calculations and declarations necessary for the submission of the application, in accordance with the requirements of the call. The declarations are attached as an annex to the application. We asked the designer to prepare the appropriate plans. The technical specifications as well as the blueprints have been prepared, which are also attached as an annex to the tender. We checked that the works were not subject to authorisation, so it was not necessary to obtain a building permit. The most important next steps of the project are the ordering of construction works, consultation with the technical inspector, followed-up, documentation and accounting. The completion of the construction works will be supervised by a technical inspector with ME-V authorisation. At the end of the project, the declarations required for the settlement and the contract of use of the network will be obtained, after which the final accounts will be submitted. The implementation will be supported by an external and experienced projkekt manager. The project manager has 10 years of project implementation experience and has already coordinated the implementation of several successfully implemented building energy projects. In the framework of this project, we only wish to declare the costs of the investment of the solar system. Target areas to be achieved: A. Activities to increase renewable energy use III. Installation of a solar system for grid electricity generation, exclusively for the electricity supply of the building involved in the development and the economic and production processes in it. This is where we planned the charge of the Luxor Eco Line 400 Wp Monocrystalline solar panel system with a total capacity of 49.6 kWp, consisting of 124 panels. Solar panels are placed on the roof. 1 SolarEdge SE 60 K Inverter is purchased for the system. (English)
    8 February 2022
    0 references
    Szombathely, Vas
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-02911
    0 references