Construction of a solar system at the headquarters of Avermann-Horváth Kft. (Q3935352)

From EU Knowledge Graph
Revision as of 21:54, 8 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Adding English translations)
Jump to navigation Jump to search
Project Q3935352 in Hungary
Language Label Description Also known as
English
Construction of a solar system at the headquarters of Avermann-Horváth Kft.
Project Q3935352 in Hungary

    Statements

    0 references
    0 references
    56,239,800 forint
    0 references
    155,514.86 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    279,524.649 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    102,254,181.818 forint
    0 references
    55.0 percent
    0 references
    1 October 2020
    0 references
    30 September 2022
    0 references
    Avermann-Horváth Gépgyártó Kereskedelmi és Szolgáltató Korlátolt Felelősségü Társaság
    0 references
    0 references

    45°57'37.94"N, 17°27'48.35"E
    0 references
    A fejlesztés során az Avermann-Horváth Kft. Barcs, Drávapart 2. hrsz 511/4 székhelyén található épületre napelemes rendszer kerül kiépítésre. A napelemes rendszer telepítésének célja, hogy a felhasználó a villamos-energia fogyasztását részben megújuló energiahordozóval váltsa ki. A monokristály technológiás napelem táblák egységes egyenáramú része az épület lapos és ferde tetejére, kerülnek telepítésre. A projekt keretében 201 kWp néveleges napelemes teljesítményű rendszer telepítése történik meg, a megvalósítás tervezett időszaka 2020.10.01-2022.09.30. A kivitelezési munkálatok során 600 db 335 Wp névleges teljesítményű napelem kerül felszerelésre, lemeztetőre. A napelemek 2 db Huawei SUN2000-50KTL 50kW-os és 2 db Huawei SUN2000-36KTL 36kW-os inverteren keresztül csatlakoznak a kialakítandó AC elosztó-csatlakozó szekrényhez és a meglévő elektromos hálózathoz. A váltakozó áramú csatlakozás az épület főelosztójában kerül kialakításra. A projekt megvalósításának tervezett fizikai befejezése 2022.09.30. Az épület villamosenergia ellátása az E.ON Dél-dunántúli Áramhálózati Zrt. 0,4 kV-os közcélú hálózatáról biztosított. A napelemes rendszer a telephely elektromos hálózatán keresztül az E.ON tulajdonában lévő közcélú hálózatra fog csatlakozni. Az előkészítési terv / építési engedélyezési dokumentáció, műszaki leírás, elrendezési tervek elkészültek, a pályázati anyaghoz csatolásra kerültek. Szintén csatoltuk a tervezett rendszer fő elemeire - napelem, inverter, tartószerkezet - vonatkozó adatlapokat, mely alapján a tervezett eszközök minden tekintetben megfelelnek a hatályos jogszabályoknak. A kivitelezés során a napelemek a tetőszerkezetre kerülnek rögzítésre. Háromfázisú csatlakozás váltóirányítón (inverteren) keresztül történik. A DC kábelek a napelemektől az inverterekig a tetőn napelemek alatt - hogy kevésbé legyenek kitéve az időjárási viszonyoknak, falon kábelcsatornában kerülnek elhelyezésre. Az inverterek az épület főelosztó közelében, az épületen kívül a falon lesznek elhelyezve. Inverterenként 1 db DC leválasztó szekrény tartozik a rendszerhez, mindegyikbe munkapontonként kerül egy kapcsoló és egy túlfeszültség levezető. Az inverterek elmenő AC kábelei épületrészenként egy AC kapcsoló szekrénybe csatlakoznak. A projekt megvalósítására vonatkozóan Pályázó megfelelő tapasztalattal rendelkezik, hiszen a vállalkozás szakemberei korábbi pályázatok megvalósításában is részt vettek. A kiépített rendszer működtetésével kapcsolatban Kivitelező cég feladata lesz vállalkozás delegált tagjai számára a rendszer működésének bemutatása, oktatása. Kivitelező cég kapcsán elvárás a legalább 60 hónapos garanciális időszak. A napelemes rendszer telepítésének egyik feltétele, hogy mind a DC oldalon, mind az AC oldalon túlfeszültség védelemmel legyen ellátva a rendszer. A tervezett inverterek az áramszolgáltató által támasztott minden követelménynek megfelelnek és magyar nyelvű minősítéssel rendelkeznek. A napelemes rendszer automatikus működésű, külső beavatkozást nem igényel. Üzemideje erős fény, ill. a napsütéssel esik egybe, ami átlagosan napi 6-12 óra üzemidőt jelent. (Hungarian)
    0 references
    During the development of Avermann-Horváth Kft. A solar system will be installed on the building located at the headquarters of the 2nd district of Drávapart, Drávapart 2, 511/4. The purpose of the installation of the solar system is to partly replace the consumption of electricity by a renewable energy carrier. The uniform DC part of the solar panels with monocrystalt technology are installed on the flat and inclined top of the building. As part of the project, 201 kWp nominal solar power system will be installed. The planned implementation period is 01.10.2020-2022.09.30. During the construction works, 600 solar panels with a rated power of 335 Wp are installed on a plate roof. Solar panels connect via 2 Huawei SUN2000-50KTL 50 kW and 2 Huawei SUN2000-36KTL 36 kW inverters to the AC distribution cabinet and the existing power grid. The AC connection is set up in the main distributor of the building. The planned physical completion of the project is 30 September 2022. The electricity supply of the building is carried out by E.ON South Transdanubia Power Network Zrt. It is secured from a public service network of 0.4 kV. The solar system will be connected to the public network owned by E.ON through the electrical network of the site. The preparation plan/construction permit documentation, technical description, layout plans were completed and attached to the application file. Data sheets for the main elements of the planned system — solar panel, inverter, support structure — are also attached, according to which the planned devices comply in all respects with the legislation in force. During the construction, the solar panels are attached to the roof structure. Three-phase connection is done through an inverter (inverter). DC cables from solar panels to inverters on the roof under solar panels — to be less exposed to weather conditions, are placed on the wall in a cable duct. The inverters will be located near the main distributor of the building, on the wall outside the building. There is 1 DC isolation cabinet per inverter, each with a switch and a surge arrester per operating point. The inverters’ outgoing AC cables are connected to one AC switch cabinet per part of the building. The Applicant has relevant experience in the implementation of the project, as the experts of the company also participated in the implementation of previous applications. In connection with the operation of the built-in system, it will be the task of the implementing company to present and educate the operation of the system for the delegated members of the enterprise. A guarantee period of at least 60 months is expected for the construction company. One of the conditions for installing a solar panel system is that the system is equipped with overvoltage protection both on the DC side and on the AC side. The planned inverters meet all the requirements of the electricity supplier and are certified in Hungarian. The solar panel system is automatic and does not require external intervention. Its working time coincides with bright light and sunshine, which means on average 6-12 hours per day. (English)
    8 February 2022
    0 references
    Barcs, Somogy
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-02421
    0 references