    0 references
    17,395,960 forint
    0 references
    48,103.48 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    86,461.894 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    31,629,018.182 forint
    0 references
    55.0 percent
    0 references
    1 August 2020
    0 references
    31 December 2021
    0 references
    Kristóf József Tamás egyéni vállakozó
    0 references
    0 references

    47°38'18.42"N, 17°14'50.96"E
    0 references
    • A projekt keretén belül a cég tulajdonában levő 9300 Csorna, Soproni út 23/a, hrsz: 176/5 szám alatti ingatlanon található 2 db épület energetikai fejlesztése valósulna meg. Mindkét épület energetikai minőség szerinti jelenlegi besorolása JJ és a fejlesztés után BB minősítést érne el az 1-es épület és CC minősítést érne el a 2-es épület o A két épület esetében a fűtött alapterület összesen: 367,19 m2, (64,88 m2 + 302,31 m2) fűtött térfogat összesen: 1572,80 (170,6 m3+1402,2 m3) és CO2 kibocsájtás összesen/év: 75,76 t. o emeletráépítés az 1-es épület esetében nem valósul meg a projekt keretében és ezen tény figyelembevételével készültek az árajánlatok és az energetikai auditok mind az 1-es és mind a 2-es épületre vonatkozóan. o A projekt keretén belül az alábbi tevékenységek valósulnak meg: Komplett Fűtési, hűtési rendszer korszerűsítés, Fűtött és fűtetlen teret elválasztó, nyílászárók cseréje energiamegtakarítást eredményező korszerűsítés érdekében,  ? Az 1-es épületen (porta-iroda épülete) 136 m2 felület hőszigetelése valósul meg 16 cm-es hungarocell felragasztásával, háló beágyazással, kétszeri gletteléssel, alapozással és 1,5 mm-es kapart vakolattal. Fűtés korszerűsítés klímával, illetve a mellékhelyiségekben NOBO fűtő panel. valamint nyílászáró csere melyek összfelülete: 12,24 m2 illetve 3 db 90-es ajtó beszerelése. ? A 2-es épület esetében (műhely-szortírozó üzem) 264 m2 felület hőszigetelése valósul meg 16 cm-es hungarocell felragasztásával, háló beágyazással, kétszeri gletteléssel, alapozással és 1,5 mm-es kapart vakolattal. Nyílászáró csere is megvalósul és a behelyezendő szekciónált kapuk (1 db 3000*3000, 5 db 1500*2124) összfelülete 29,86 m2. Hőszigetelő állmennyezet kiépítése nem valósul meg a projekt keretében o Fűtött és fűtetlen teret elválasztó, nem nyílászáró szerkezetnek minősülő épülethatároló szerkezetek hőszigetelése. Az épület nem közhasznú, közhasználatú, így az akadálymentességet nem kell biztosítani. o 30,78kWp névleges teljesítményű napelemes kiserőmű telepítése a szükséges villamos energia biztosítására. o az eredetileg becsatolt 01_Szakétői nyilatkozatok nem változtak mivel a felmérés során eleve a bővítés-ráépítés nélkül készültek a felmérések és az energetikai auditok is. • A projekt megvalósítása végett rendelkezünk a szükséges tervekkel és árajánlatokkal. A beruházás tekintve, hogy nem tartalmaz emeletráépítést illetve bővítést nem építési engedély köteles. (Hungarian)
    0 references
    • Within the framework of the project, 9300 Csorna, Soproni út 23/a, hrsz: The energy development of 2 buildings located on the property number 176/5 would be realised. The current energy quality rating of both buildings would be JJ and after the development the BB rating would be achieved by building 1 and the CC rating for Building 2 o The total heated floor area for the two buildings is: Total heated volume of 367.19 m² (64.88 m² + 302.31 m²): 1572,80 (170.6 m³+ 1 402.2 m³) and CO2 emissions total/year: 75.76 t. o floor construction of building 1 is not carried out in the framework of the project and the price quotations and energy audits have been carried out in view of this fact for both Buildings 1 and 2. o. The following activities will be carried out within the framework of the project: Complete heating, cooling system upgrade, Heated and unheated space separation, replacement of doors and windows for energy-saving upgrades? On building 1 (porta office building) 136 m² surface is insulated by gluing 16 cm hungarorocell, mesh embedded, double glet filling, foundation and 1.5 mm scrape plaster. Heating upgrade with air conditioning, NOBO heating panel in the toilets and replacement of doors and windows: Installation of 12.24 m² and 3 doors of 90. In the case of building 2 (workshop-sorting plant), a surface of 264 m² is thermally insulated by gluing 16 cm of hungarocell, net embedding, double glet filling, foundation and 1.5 mm scraped plaster. There is also a change of doors and the total surface area of the gates (1 3000*3000, 5 1500*2124) at the section to be inserted is 29.86 m². In the framework of the project the thermal insulation of building envelopes that are not considered as windows are not realised in the framework of the project o Heated and unheated space. The building is not of public use or used in the public domain and therefore accessibility is not required. O Installation of a small solar power plant with a nominal capacity of 30.78kWp to provide the necessary electricity. o the originally attached 01_Stakeholder declarations have not changed since surveys and energy audits were carried out without expansion. • We have the necessary plans and quotations to complete the project. In view of the fact that the investment does not involve building floors or extensions, no building permit is required. (English)