Energy development of Tisza CAD PRODUCT Kft. (Q3934201)

From EU Knowledge Graph
Revision as of 21:45, 8 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Adding English translations)
Jump to navigation Jump to search
Project Q3934201 in Hungary
Language Label Description Also known as
English
Energy development of Tisza CAD PRODUCT Kft.
Project Q3934201 in Hungary

    Statements

    0 references
    7,992,479 forint
    0 references
    22,100.88 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    39,724.446 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    14,531,780.0 forint
    0 references
    54.999994 percent
    0 references
    2 May 2020
    0 references
    31 July 2020
    0 references
    TISZA CAD PRODUCT Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°55'40.91"N, 21°2'48.16"E
    0 references
    Előkészítő tevékenység Előkészítő tevékenységnek megfelelően egyeztettünk az energetikussal, aztán a tanúsítványok és a támogatott költségek tekintetében a kivitelezővel. Ennek megfelelően az energetikai tanúsítványok és költségvetés tervezéshez az árajánlatok rendelkezésre állnak. A beruházás nem engedély köteles, melyet a kivitelező nyilatkozatában tanúsít. A termelést nem fogja befolyásolni a beruházás folyamata, a kettő együtt mehet párhuzamosan, nem szükséges a partnerekkel egyeztetni, munkafolyamatainkat nem befolyásolja. Ismertesse a projekt megvalósításának legfontosabb lépéseit Melegebb hónapokban fogjuk megkezdeni a projekt megvalósítását, terveink szerint amennyiben lehetséges az előkésztő munkálatok után a nyílászárók, árnyékolók eltávolítása, előkészítése, és az újak behelyezése hétvégén fog megtörténni. Ezzel párhuzamosan a szigetelési munkálatokat is megkezdik, majd a nyílászárók behelyezése után megkezdődik a szigetelés is, a legvégén pedig a párkányok felhelyezése, beruházási hely rendezése, nemes vakolat felhelyezése és a terület átadás. Jártassága, tapasztalata Tulajdonos ügyvezetőnek saját tulajdonú házán volt szigetelés, de a műszaki ellenőr rendelkezik a megfelelő ismeretekkel. Tulajdonos a vállalkozás működtetése során több fejlesztést, projektet megvalósított, ami segíti a a műszaki ellenőrrel együtt a fejlesztés megfelelő megvalósítását. Érintett célterületek: Fűtött és fűtetlen teret elválasztó, nem nyílászáró szerkezetnek minősülő épülethatároló szerkezetek hőszigetelése. Fűtött és fűtetlen teret elválasztó, nyílászáró szerkezetnek minősülő épülethatároló szerkezetek cseréje / energia-megtakarítást eredményező korszerűsítése. Az épületek nyári hővédelmének javítása, árnyékoló- vagy árnyékvető szerkezetek beépítése A jelenlegi fa nyílászárók nem megfelelően szigetelnek, ezek hőszigetelő üveggel ellátott műanyag kivitelű nyílászáróra cseréje nagyban fogja befolyásolni a fűtés költségeit, ezáltal a vállalkozásunk rezsiköltségekhez kötődő terhei tovább enyhülnek. De ez a fejlesztés még önmagában nem elegendő, szükséges az épület homlokzatának szigetelése, mely 15 cm-es polisztirol keményhab hőszigetelést fog kapni, mellyel tovább csökken a hőveszteség télen, illetve nyáron az épület túlmelegedésének esélye, és ezáltal ugyancsak a költséghatékonyság eredményesebb lesz. Minden nyílászárón van reluxa, de a nyílászárók cseréjével ezt is cserélni kellene, hogy ne melegedjen fel az épület és kevesebb energia menjen el a hűtésre. A beruházás során új eszköz, gép beszerzése nem történik, nem releváns a projektben. Hőszigetelés: MASTERPLAST Isomaster EPS H-80 Grafitos expandált polisztirol keményhab hőszigetelő lemez, 1000×500×150 mm, Cikkszám: 0541-08015000 (Hungarian)
    0 references
    In accordance with the preparatory activity, we agreed with the energetician and then with the contractor in terms of certifications and subsidised costs. Accordingly, quotes are available for energy certificates and budget planning. The investment is not subject to an authorisation, which the contractor certifies in his declaration. Production will not be influenced by the investment process, the two can go together in parallel, it is not necessary to coordinate with the partners, it does not affect our workflows. Describe the most important steps in the implementation of the project in the warmer months, according to our plans, if possible after the preparatory works, the removal, preparation and installation of new doors and windows will take place on weekends. At the same time, the insulation works are also started, and after the installation of the windows the insulation begins, and at the very end the installation of the sills, the construction of the investment site, the installation of noble plaster and the handover of the area. His skill and experience was insulation in his own house, but the technical inspector has the necessary knowledge. In the course of the operation of the company, the owner has carried out several developments and projects, which, together with the technical inspector, assists the proper implementation of the development. Target areas concerned: Thermal insulation of building envelopes other than doors and windows separating heated and unheated spaces. Replacement/replacement of building envelopes considered as doors and windows separating heated and unheated spaces to achieve energy savings. Improving the heat protection of buildings during the summer, installation of shading or shading structures The current wooden doors and windows are not properly insulated, replacing them with plastic doors and windows with thermal insulation glass will greatly affect the cost of heating, thus reducing the costs of our company’s overhead costs. But this development alone is not enough, it is necessary to insulate the facade of the building, which will receive 15 cm polystyrene hard foam thermal insulation, which will further reduce the risk of heat loss in winter and summer, and thus make the building more cost-effective. All doors and windows have reluxes, but this should be replaced by the replacement of doors and doors so that the building does not warm up and less energy goes to cooling. No new equipment or machinery will be purchased during the investment, not relevant in the project. Thermal insulation: Masterplast Isomaster EPS H-80 graphite expanded polystyrene hard foam thermal insulation plate, 1000×500×150 mm, Item No.: 0541-08015000 (English)
    8 February 2022
    0 references
    Tiszaújváros, Borsod-Abaúj-Zemplén
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-00765
    0 references