    0 references
    14,437,020 forint
    0 references
    39,921.39 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    71,755.286 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    26,249,127.273 forint
    0 references
    55.0 percent
    0 references
    1 April 2020
    0 references
    31 December 2021
    0 references
    BALMAZ-SÜTŐDE Élelmiszeripari Feldolgozó és Kereskedelmi Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°36'41.87"N, 21°20'37.46"E
    0 references
    A költséges szünetmentes funkció kialakításának indoka, hogy az üzem nagyon modern számítógépes vezérléssel felszerelt gépekkel dolgozik, melyek a rövid áramkimaradásokra is érzékenyek, így ezek a rövid feszültség ingadozások kiküszöbölése az elsődleges célja a szünetmentes funkciónak. A kialakításra kerülő napelemes rendszer a várakozás szerint fedezni fogja a teljes fogyasztás jelentős részét, mintegy 54780 kWh zöld energia megtermelésével, így költséget csökkent, és zöld energia felhasználást biztosítja. Részletes szakmai tartalom: A létesítmény jelenleg meglévő villamos-energia igénye a fogyasztásmérési ponton lehetővé teszi a háztartási méretű kiserőműnél megengedett maximum 50kVA termelői berendezés csatlakozását. A tervezett rendszer AC-oldali teljesítménye: 45 kW A fogyasztásmérőnél elhelyezett főelosztóhoz csatlakozik az inverterek AC kimenetén megjelenő230V hálózati feszültség NYY 4x25mm2 kábellel. A DC kábelek a szendvics panel tető héjazatot az ereszen túl átlépve, a külső falsíkon, fém kábelcsatornába helyezve, függőleges nyomvonalon vezetve, a földszinti belső falfelületen elhelyezett inverterekhez kapcsolódnak. Alkalmazott inverterek: • 4 db Fronius Symo hybrid 5.0 kW • 1 db Fronius Symo 25 kW. Az alkalmazandó inverterek E.ON hálózati területen rendszerengedélyes inverterek. A hybrid inverterek hálózati áramkimaradás esetén szünetmentes áramellátás biztosítására képesek oly módon, hogy 3 db 4,5 kWh teljesítményű Fronius Solar Battery System akkumulátor egység energia menedzsmentjét látják el. A szünetmentes áramellátást a hálózat adott pontjaira kapcsolt termelő berendezések vezérlői, valamint informatikai berendezések kapják abból a célból, hogy a rövid időre bekövetkező áramkimaradások azokat ne károsítsák, illetőleg ne okozzanak újraindítási folyamatokat – következésképpen, gyártás kiesést. A napelemek egyetlen tetősíkon helyezkednek el, szendvicspanel héjazaton, tetősíkkal azonos síkban elhelyezett tartószerkezetre rögzítve. A tartószerkezet szabványos, rozsdamentes kötőelemek és szolár szerelő sínek alkalmazásával rögzíti a napelemeket. Javasolt gyári rendszer: K2 gyártmány. Az inverter DC oldali bemenetére csatlakozik összesen 166 db 300 Wp teljesítményű Canadian Solar HC poly (vágott cellás poli-kristályos) napelem. Ebből 4x20 db napelem a 4 db Fronius Symo 5 kW hybrid inverter, 1x86 db napelem a Fronius Symo 25 kW inverter DC-oldali terhelését biztosítja. A napelemek kapcsolási módját, az egyes stringek bekötését a terv részét képező tervlapok tartalmazzák. A napelemek tetősíkon történő elrendezési rajzát, valamint az inverterek elhelyezését és az AC vezeték főelosztóig vezető nyomvonalát a mellékelt tervlapok tartalmazzák. (Hungarian)
    0 references
    The reason for the costly uninterruptible function is that the plant works with machines equipped with very modern computer controls, which are also sensitive to short power outages, so these short voltage fluctuations are the primary purpose of the uninterrupted function. The solar system to be installed is expected to cover a significant part of the total consumption, producing around 54 780 kWh of green energy, thus reducing costs and ensuring the use of green energy. Detailed professional content: The current electricity demand of the installation at the metering point allows the connection of a maximum of 50kVA production equipment at the household-sized small power plant. AC-side performance of the planned system: 45 kW The main divider at the meter is connected to the AC output of the inverters with a 230V main voltage NYY 4x25 mm² cable. The DC cables are connected to inverters placed on the outer wall plane, placed in a metal duct, along a vertical trail, passing the sandwich panel roof shell beyond the eaves of the wall. Inverters used: • 4 Fronius SYMO hybrid 5.0 kW • 1 Fronius SYMO 25 kW. The inverters to be used in the E.ON network area are system-authorised inverters. Hybrid inverters can provide uninterrupted power in case of power failure by providing energy management of 3 Fronius Solar Battery System battery units with a power output of 4.5 kWh. The uninterrupted power supply is provided to the controllers of the generating equipment connected to the given points of the network, as well as to IT equipment, so that short-term power failures do not damage them or cause restarting processes — consequently, production failures. The solar panels are located on a single roof plane, on a sandwich panel shell, attached to a supporting structure located in the same plane as the roof plane. The support structure fixes the solar panels using standard stainless steel fasteners and solar mounting rails. Recommended factory system: Make K2. The DC side input of the inverter is connected to a total of 166 pcs 300 Wp Canadian Solar HC poly (cut cell poly-crystalline) solar panels. Of these 4x20 solar panels are the 4 Fronius SYMO 5 kW hybrid inverters, 1x86 pcs solar panel provides the DC side load of Fronius SYMO 25 kW inverter. The method of switching solar panels, the connection of the individual strings, is included in the design sheets that form part of the plan. The layout drawings of the solar panels on the roof plane, as well as the positioning of the inverters and the trace of the AC line to the main divider, are set out in the attached design sheets. (English)
    8 February 2022
    0 references
    Balmazújváros, Hajdú-Bihar
    0 references

    Identifiers

    GINOP-4.1.4-19-2019-00022