Infrastructural development of the learning spaces of the Pál Németh College (Q3903394)

From EU Knowledge Graph
Revision as of 13:48, 8 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Adding English translations)
Jump to navigation Jump to search
Project Q3903394 in Hungary
Language Label Description Also known as
English
Infrastructural development of the learning spaces of the Pál Németh College
Project Q3903394 in Hungary

    Statements

    0 references
    0 references
    128,802,940 forint
    0 references
    356,167.18 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    414,234.134 Euro
    0.0027336256 Euro
    14 December 2021
    0 references
    151,532,870.588 forint
    0 references
    84.999998 percent
    0 references
    1 September 2017
    0 references
    1 December 2018
    0 references
    Szombathelyi Tankerületi Központ
    0 references
    0 references

    47°13'44.83"N, 16°37'7.54"E
    0 references
    A kollégium épületét 1975-ben adták át, a legrégebbi épület a szombathelyi kollégiumi negyedben. Felújítási munkálatokat eddig nem végeztek rajta. A 4 emeletes épületben a szintek száma 6. Az építéskor a lakószobák mellett tanulószobák, vezetői irodák, klubhelyiség, karbantartáshoz, takarításhoz kapcsolódó műhelyek, főzőkonyha került kialakításra. Közösségi helyiségeket, a szervezett szabadidős tevékenység tartására alkalmas helyiségeket nem terveztek. Tanári szobát, éjszakai ügyeleti szobát, a koedukált kollégiumban egy helyiségben terveztek. A felsőbb lakószinteken tanári szobát alakítottak ki. 1992 után a kollégium könyvtárral, számítástechnika teremmel, szakköri helyiségekkel, konditeremmel bővült úgy, hogy a korábbi teremhasználati funkciók megváltoztatásra kerültek. Az I. emeleten számítástechnika terem került kialakítására. Az építéskor gazdasági irodákat sem terveztek. A kollégium kihasználtsága a folyamatosan romló infrastruktúra ellenére kiemelkedő. A lányok teszik ki tanulólétszámunk 65%-át. A kollégium kiemelkedő szakmai munkát folytat, az elmúlt években több tehetséggondozó programja is példaértékűvé vált. Az épület leromlott állapota miatt felújításra is szorul. Ennek során új funkciókat is nyer az épület, amely a diákok tehetséggondozását szolgálja és komfortérzetét javítja. A pályázati fejlesztésből bútorzatbeszerzésre kerül sor, a kilyukadt padlózati pvc borítások cseréjére, nyílászáró cserékre, vizesblokkok felújítására, sportszoba és aulafelújításra, fejlesztőszoba és tanulószobák kialakítása valósul meg, megújul az orvosi és betegszoba, közösségi tér rekonstrukciójára kerül sor és informatikai fejlesztés is létrejön. Ezek a tanulók lakhatási feltételeinek javítását, a foglalkozási lehetőség és tehetséggondozó programok spektrumának szélesedését, körülményeinek javítását eredményezik. (Hungarian)
    0 references
    The dorm building was opened in 1975, the oldest building in the Szombathely dormitory district. No refurbishment work has been carried out on it so far. The number of floors in the 4-storey building is 6. In addition to the living rooms, study rooms, executive offices, clubrooms, workshops related to maintenance, cleaning, and cooking kitchens were installed at the time of construction. No public premises, rooms suitable for organised leisure activities are planned. Teacher’s room, night on-call room, co-educated dorm room in the same room. On the higher residential floors, a teaching room was built. After 1992, the college was expanded with a library, computer science room, specialised rooms and gym, so that the former room usage functions were changed. On the 1st floor, a computer room has been set up. No business offices were planned at the time of construction. Despite the constantly deteriorating infrastructure, the use of the college is outstanding. Girls make up 65 % of our student numbers. In recent years, several talent-professional programmes have become exemplary. Due to the deteriorating condition of the building, it also needs renovation. In doing so, the building will also gain new features that serve to nurture students’ talents and improve their comfort. From the tender development we will purchase furniture, replacement of leaked floor pvc coverings, replacement of doors and windows, renovation of sanitary blocks, sports room and aula refurbishment, development room and study rooms, refurbishment of the medical and infirmary, community space reconstruction and IT development. They lead to an improvement in the housing conditions of pupils, a broadening of the spectrum of occupational opportunities and talent-providing programmes, and an improvement in conditions. (English)
    8 February 2022
    0 references
    Szombathely, Vas
    0 references

    Identifiers

    EFOP-4.1.3-17-2017-00418
    0 references