DESIGN AND EXECUTION OF WORKS RELATING TO MANUFACTURING OF THE MANUFACTURING PROJECT Â OF THE MANUFACTURING SECTOR OF THE SECTOR Â OF THE SECTOR Â B, LOT 1 (Q2177007)
Jump to navigation
Jump to search
Project Q2177007 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | DESIGN AND EXECUTION OF WORKS RELATING TO MANUFACTURING OF THE MANUFACTURING PROJECT Â OF THE MANUFACTURING SECTOR OF THE SECTOR Â OF THE SECTOR Â B, LOT 1 |
Project Q2177007 in Italy |
Statements
1,350,943.0 Euro
0 references
2,701,886.0 Euro
0 references
50.0 percent
0 references
1 October 2009
0 references
31 December 2019
0 references
PROVINCIA AUTONOMA DI TRENTO
0 references
PROGETTAZIONE ESECUTIVA ED ESECUZIONE DEI LAVORI DI REALIZZAZIONE DEL PROGETTO MANIFATTURA ¿ GREEN INNOVATION FACTORY ¿ AMBITO B, LOTTO 1 - MAGGIOR COSTO PER EFFICIENTAMENTO ENERGETICO RISPETTO AI LIVELLI MINIMI PREVISTI DALLA NORMATIVA VIGENTE IN MATERIA (Italian)
0 references
DESIGN AND EXECUTION OF WORKS RELATING TO THE MANUFACTURING OF THE MANUFACTURING PROJECT Â OF THE MANUFACTURING SECTOR OF THE MANUFACTURING SECTOR OF THIS SECTOR AND TO BE CARRIED OUT WITH A HIGHER COST FOR ENERGY EFFICIENCY THAN THE MINIMUM LEVELS PROVIDED FOR BY THE LEGISLATION IN FORCE IN THIS AREA. (English)
0 references
CONCEPTION ET EXÉCUTION DU PROJET DE FABRICATION DE L’USINE D’INNOVATION VERTE B, LOT 1 — COÛT PLUS ÉLEVÉ DE L’EFFICACITÉ ÉNERGÉTIQUE PAR RAPPORT AUX NIVEAUX MINIMAUX REQUIS PAR LA LÉGISLATION EN VIGUEUR (French)
23 December 2021
0 references
UITVOEREND ONTWERP EN UITVOERING VAN HET PRODUCTIEPROJECT Â’GREEN INNOVATION FACTORY Â’SCOPE B, PERCEEL 1 — HOGERE KOSTEN VOOR ENERGIE-EFFICIËNTIE IN VERGELIJKING MET DE MINIMUMNIVEAUS DIE VEREIST ZIJN DOOR DE HUIDIGE WETGEVING (Dutch)
24 December 2021
0 references
EXECUTIVE DESIGN UND AUSFÜHRUNG DES FERTIGUNGSPROJEKTS ¿GREEN INNOVATION FACTORY ¿SCOPE B, LOS 1 – HÖHERE KOSTEN FÜR ENERGIEEFFIZIENZ IM VERGLEICH ZU DEN NACH DEN GELTENDEN RECHTSVORSCHRIFTEN ERFORDERLICHEN MINDESTWERTEN (German)
25 December 2021
0 references
DISEÑO EJECUTIVO Y EJECUCIÓN DEL PROYECTO DE FABRICACIÓN —FÁBRICA DE INNOVACIÓN VERDE-ÁMBITO B, LOTE 1 — MAYOR COSTE PARA LA EFICIENCIA ENERGÉTICA EN COMPARACIÓN CON LOS NIVELES MÍNIMOS EXIGIDOS POR LA LEGISLACIÓN VIGENTE (Spanish)
25 January 2022
0 references
ROVERETO
0 references
Identifiers
D76G11000400005
0 references