(11429.27102016.098000117) ARPATEX 4.0 (Q2057322)
Jump to navigation
Jump to search
Project Q2057322 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | (11429.27102016.098000117) ARPATEX 4.0 |
Project Q2057322 in Italy |
Statements
14,081.87 Euro
0 references
29,328.98 Euro
0 references
48.01 percent
0 references
28 December 2016
0 references
4 March 2019
0 references
28 December 2019
0 references
ARPATEX S.R.L.
0 references
Q290969 (Deleted Item)
0 references
IL PROGETTO ?ARPATEX 4.0? MIRA A TRASFORMARE UNA TRADIZIONALE IMPRESA IMPANNATRICE DEL DISTRETTO PRATESE IN UNA AVANZATA INDUSTRIA 4.0. IN SINTESI, IL PROGETTO MIRA A DIGITALIZZARE COMPLETAMENTE I FLUSSI INFORMATIVI PER ELIMINARE QUASI INTERAMENTE IL SUPPORTO CARTACEO DELLE DISPOSIZIONI DI LAVORO. IL CICLO OPERATIVO SAR? MONITORATO E ANALIZZATO ATTRAVERSO STRUMENTI DI BUSINESS INTELLIGENCE. IL FLUSSO LOGISTICO VEDR? L?IMPLEMENTAZIONE DI SISTEMI AVANZATI DI TRACCIABILIT? DEL SEMILAVORATO. LA PRODUZIONE SAR? PROGRAMMATA MEDIANTE APPOSITO APPLICATIVO MPR ?SCHEDULATORE? IN GRADO DI CONTRARRE TEMPI E COSTI DI COMMESSA. SAR? QUINDI OTTIMIZZATA LA LOGISTICA INTERNA E IL CONTROLLO DELLA CATENA DI FORNITURA MEDIANTE APPLICATIVO ERP/SCM. SI TENDER? ALLA VELOCIZZAZIONE DEL CICLO PRODUTTIVO E A CONTRARRE LE SCORTE DI MAGAZZINO SECONDO UNA FILOSOFIA DI JUST IN TIME. NEL DETTAGLIO, IL MERCATO IMPONE ALL'IMPRESA UN CAMBIAMENTO ORGANIZZATIVO PER CONSENTIRLE DI ADATTARSI IN MODO OTTIMALE AI NUOVI TREND (Italian)
0 references
PROJECT ARPATEX 4.0? IT AIMS TO TRANSFORM A TRADITIONAL IMPANNATURE COMPANY FROM THE MEADOW DISTRICT IN AN ADVANCED INDUSTRY 4.0. IN SUMMARY, THE PROJECT AIMS TO FULLY DIGITISE THE INFORMATION FLOWS IN ORDER TO ELIMINATE ALMOST ENTIRELY THE PAPER FORM OF THE WORKING ARRANGEMENTS. SAR OPERATING CYCLE? MONITORED AND ANALYSED THROUGH BUSINESS INTELLIGENCE TOOLS. THE LOGISTICAL FLOW WILL SEE? L? IMPLEMENTATION OF ADVANCED SYSTEMS OF TVABILIT? OF THE SEMI-FINISHED PRODUCT. SAR PRODUCTION? PROGRAMMED THROUGH A SPECIAL APPLICATION MPR? SCHLULATOR? CONTRACTING TIME AND CONTRACT COSTS. SAR? THUS, IMPROVED INTERNAL LOGISTICS AND CONTROL OF THE SUPPLY CHAIN THROUGH ERP/SCM APPLICATION. DOES IT TENDER? ACCELERATE THE PRODUCTION CYCLE AND ENTER STOCK STOCKS ACCORDING TO JUST JUST TIMES. IN DETAIL, THE MARKET PLACES AN ORGANISATIONAL CHANGE IN THE MARKET TO ALLOW IT TO ADAPT OPTIMALLY TO THE NEW TRENDS. (English)
0 references
LE PROJET?ARPATEX 4.0? IL VISE À TRANSFORMER UNE ENTREPRISE TRADITIONNELLE IMPANNATRICE DU DISTRICT DE PRATO EN UNE INDUSTRIE AVANCÉE 4.0. EN RÉSUMÉ, LE PROJET VISE À NUMÉRISER PLEINEMENT LES FLUX D’INFORMATION AFIN D’ÉLIMINER PRESQUE ENTIÈREMENT LE SUPPORT PAPIER DES MODALITÉS DE TRAVAIL. LE CYCLE D’OPÉRATION SAR? SUIVI ET ANALYSE À L’AIDE D’OUTILS D’INTELLIGENCE D’AFFAIRES. LE FLUX LOGISTIQUE QUE VOUS VOYEZ? LA MISE EN ŒUVRE DE SYSTÈMES DE SUIVI AVANCÉS? DU PRODUIT SEMI-FINI. PRODUCTION DE SAR? PROGRAMMÉE AU MOYEN D’UNE APPLICATION SPÉCIALE MPR?SCHEDULATOR? EN MESURE DE CONTRACTER LES DÉLAIS ET LES COÛTS CONTRACTUELS. C’EST SAR? PUIS OPTIMISÉ LA LOGISTIQUE INTERNE ET LE CONTRÔLE DE LA CHAÎNE D’APPROVISIONNEMENT GRÂCE À L’APPLICATION ERP/SCM. C’EST UNE OFFRE? À L’ACCÉLÉRATION DU CYCLE DE PRODUCTION ET À CONTRACTER LES STOCKS D’ENTREPÔT SELON UNE PHILOSOPHIE DE JUSTE DANS LE TEMPS. EN DÉTAIL, LE MARCHÉ IMPOSE À L’ENTREPRISE UN CHANGEMENT ORGANISATIONNEL POUR LUI PERMETTRE DE S’ADAPTER DE MANIÈRE OPTIMALE AUX NOUVELLES TENDANCES (French)
16 December 2021
0 references
HET PROJECT?ARPATEX 4.0? HET HEEFT TOT DOEL EEN TRADITIONEEL BEDRIJF IMPANNATRICE VAN HET DISTRICT PRATO OM TE VORMEN TOT EEN GEAVANCEERDE INDUSTRIE 4.0. SAMENGEVAT HEEFT HET PROJECT TOT DOEL DE INFORMATIESTROMEN VOLLEDIG TE DIGITALISEREN OM BIJNA DE PAPIEREN ONDERSTEUNING VAN DE WERKAFSPRAKEN TE ELIMINEREN. DE SAR-BEDRIJFSCYCLUS? GEMONITORD EN GEANALYSEERD MET BEHULP VAN BUSINESS INTELLIGENCE TOOLS. DE LOGISTIEKE STROOM ZIE JE? DE IMPLEMENTATIE VAN GEAVANCEERDE VOLGSYSTEMEN? VAN HET HALFFABRIKAAT. SAR PRODUCTIE? GEPROGRAMMEERD DOOR MIDDEL VAN EEN SPECIALE MPR?SCHEDULATOR APPLICATIE? IN STAAT OM CONTRACTTIJDEN EN -KOSTEN TE CONTRACTEREN. IS HET SAR? VERVOLGENS GEOPTIMALISEERDE INTERNE LOGISTIEK EN SUPPLY CHAIN CONTROL DOOR ERP/SCM APPLICATIE. IS HET EEN TENDER? HET VERSNELLEN VAN DE PRODUCTIECYCLUS EN HET CONTRACTEREN VAN DE VOORRADEN MAGAZIJN VOLGENS EEN FILOSOFIE VAN NET OP TIJD. IN DETAIL LEGT DE MARKT HET BEDRIJF EEN ORGANISATORISCHE VERANDERING OP OM HET IN STAAT TE STELLEN ZICH OPTIMAAL AAN TE PASSEN AAN NIEUWE TRENDS (Dutch)
23 December 2021
0 references
DAS PROJEKT?ARPATEX 4.0? ES ZIELT DARAUF AB, EIN TRADITIONELLES UNTERNEHMEN IMPANNATRICE DES BEZIRKS PRATO IN EINE FORTSCHRITTLICHE INDUSTRIE 4.0 ZU VERWANDELN. INSGESAMT ZIELT DAS PROJEKT DARAUF AB, DEN INFORMATIONSFLUSS VOLLSTÄNDIG ZU DIGITALISIEREN, UM DIE UNTERSTÜTZUNG DER ARBEITSREGELUNGEN IN PAPIERFORM NAHEZU VOLLSTÄNDIG ZU BESEITIGEN. DER SAR-BETRIEBSZYKLUS? ÜBERWACHT UND ANALYSIERT DURCH BUSINESS INTELLIGENCE TOOLS. DER LOGISTIKFLUSS, DEN SIE SEHEN? DIE IMPLEMENTIERUNG VON FORTSCHRITTLICHEN TRACKING-SYSTEMEN? DES HALBFERTIGERZEUGNISSES. SAR-PRODUKTION? PROGRAMMIERT DURCH EINE SPEZIELLE MPR?SCHEDULATOR ANWENDUNG? IN DER LAGE, VERTRAGSZEITEN UND KOSTEN ZU VEREINBAREN. IST ES SAR? ANSCHLIESSEND OPTIMIERTE INTERNE LOGISTIK UND SUPPLY CHAIN CONTROL DURCH ERP/SCM-ANWENDUNG. IST ES EIN ZÄRTCHEN? ZUR BESCHLEUNIGUNG DES PRODUKTIVEN ZYKLUS UND DIE LAGERBESTÄNDE NACH EINER PHILOSOPHIE VON GERADE RECHTZEITIG ZU KONTRAHIEREN. IM DETAIL FORDERT DER MARKT DEM UNTERNEHMEN EINEN ORGANISATORISCHEN WANDEL AUF, DAMIT ES SICH OPTIMAL AN NEUE TRENDS ANPASSEN KANN. (German)
24 December 2021
0 references
¿EL PROYECTO?ARPATEX 4.0? SU OBJETIVO ES TRANSFORMAR UNA EMPRESA TRADICIONAL IMPANNATRICE DEL DISTRITO DE PRATO EN UNA INDUSTRIA AVANZADA 4.0. EN RESUMEN, EL PROYECTO TIENE POR OBJETO DIGITALIZAR PLENAMENTE LOS FLUJOS DE INFORMACIÓN CON EL FIN DE ELIMINAR CASI POR COMPLETO EL APOYO EN PAPEL DE LOS ACUERDOS DE TRABAJO. ¿EL CICLO DE OPERACIÓN SAR? MONITOREADO Y ANALIZADO A TRAVÉS DE HERRAMIENTAS DE INTELIGENCIA EMPRESARIAL. ¿EL FLUJO LOGÍSTICO QUE VES? ¿LA IMPLEMENTACIÓN DE SISTEMAS AVANZADOS DE SEGUIMIENTO? DEL PRODUCTO SEMIELABORADO. ¿PRODUCCIÓN DE SAR? PROGRAMADO POR MEDIO DE UNA APLICACIÓN ESPECIAL MPR?SCHEDULATOR? CAPACIDAD PARA CONTRATAR LOS PLAZOS Y COSTES DEL CONTRATO. ¿ES SAR? A CONTINUACIÓN, OPTIMIZA LA LOGÍSTICA INTERNA Y EL CONTROL DE LA CADENA DE SUMINISTRO A TRAVÉS DE LA APLICACIÓN ERP/SCM. ¿ES TIERNO? A LA ACELERACIÓN DEL CICLO PRODUCTIVO Y A CONTRATAR LAS EXISTENCIAS DE ALMACÉN SEGÚN UNA FILOSOFÍA DE JUSTO A TIEMPO. EN DETALLE, EL MERCADO IMPONE A LA EMPRESA UN CAMBIO ORGANIZATIVO PARA PERMITIRLE ADAPTARSE ÓPTIMAMENTE A LAS NUEVAS TENDENCIAS (Spanish)
25 January 2022
0 references
PRATO
0 references
Identifiers
D58I17000780009
0 references