545,571.95 Euro
0 references
1,566,291.0 Euro
0 references
34.83 percent
0 references
1 February 2016
0 references
1 February 2019
0 references
Akcinė bendrovė "Fasa"
0 references
68108
0 references
Nenumaldomai augant pasaulinėms žaliavų kainoms, jaučiant didėjantį konkurentų kainodaros spaudimą, norint išlaikyti įmonės konkurencingumą, yra jaučiamas didelis poreikis modernizuoti jau gerokai senėjantį gamybos cechą (staklių parką bei patalpas). Šiuo metu gamykloje yra 4 modernūs metalo apdirbimo centrai su CNC (angl. computer numerical control) valdymu, tačiau likusios staklės yra stipriai susidėvėjusios, mažo našumo. Gamybiniai pajėgumai nevisuomet patenkina esamus gamybinius poreikius bei kokybinius reikalavimus. Taip pat, gamyklos patalpos yra nerenovuotos nuo pat įsikurimo 1959 metais, todėl patiriami bereikalingai dideli šildymo kaštai. Įgyvendinant projektą siekiama atnaujinti gamybinį staklių parką, įsigijant naujų modernių koordinatinių matavimo mašinų bei eilę tekinimo, frezavimo, krumplių pjovimo, vandens pjovimo, erozinių, ir lazerinių staklių su moderniomis CNC valdymo sistemomis, o taip pat renovuoti gamybines patalpas, didinant jų energetinį našumą. (Lithuanian)
0 references
In an inexorable increase in global raw material prices, a growing price pressure from competitors, and in order to maintain the company’s competitiveness, there is a strong need to modernise the already ageing production facility (machine park and premises). Currently, the factory has 4 modern metal processing centers with CNC (computer numerical control) control, but the remaining machines are heavily worn, low performance. Production capacity does not always meet existing production needs and qualitative requirements. In addition, the premises of the plant have not been renovated since it was established in 1959, resulting in unnecessarily high heating costs. The aim of the project is to renew the production machine fleet by acquiring new modern coordinate measuring machines and a series of turning, milling, gear cutting, water cutting, erosive, and laser machines with modern CNC control systems, as well as to renovate production facilities by increasing their energy efficiency. (English)
1 February 2022
0 references
En raison d’une augmentation inexorable des prix mondiaux des matières premières, d’une pression croissante sur les prix de la part des concurrents, et afin de maintenir la compétitivité de l’entreprise, il est nécessaire de moderniser les installations de production déjà vieillissantes (parc de machines et locaux). Actuellement, l’usine dispose de 4 centres modernes de traitement des métaux avec commande numérique CNC (commande numérique par ordinateur), mais les machines restantes sont lourdement usées et peu performantes. La capacité de production ne répond pas toujours aux besoins de production existants et aux exigences qualitatives. En outre, les locaux de l’usine n’ont pas été rénovés depuis sa création en 1959, ce qui entraîne des coûts de chauffage inutilement élevés. L’objectif de ce projet est de renouveler la flotte de machines de production en acquérant de nouvelles machines de mesure coordonnées modernes et une série de machines de tournage, de fraisage, de découpage de l’eau, d’érosion et de laser avec des systèmes de commande CNC modernes, ainsi que de rénover les installations de production en augmentant leur efficacité énergétique. (French)
1 February 2022
0 references
Stoties 10, Marijampolė