Design and reconstruction works of heat supply networks Kurtuvėnai g. — Kelmes g. — Industrial str. — Liejyklos str. in Siauliai (Q3791384)

From EU Knowledge Graph
Revision as of 15:32, 1 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Adding English translations)
Jump to navigation Jump to search
Project Q3791384 in Lithuania
Language Label Description Also known as
English
Design and reconstruction works of heat supply networks Kurtuvėnai g. — Kelmes g. — Industrial str. — Liejyklos str. in Siauliai
Project Q3791384 in Lithuania

    Statements

    0 references
    1,905,033.18 Euro
    0 references
    3,810,066.36 Euro
    0 references
    50.0 percent
    0 references
    17 November 2017
    0 references
    10 January 2020
    0 references
    Akcinė bendrovė "Šiaulių energija"
    0 references
    0 references

    55°54'38.30"N, 23°18'47.23"E
    0 references
    78502
    0 references
    AB „Šiaulių energija”, atsižvelgdama į aukštas kuro ir kitų resursų, naudojamų šilumos energijos gamybai, kainas, didelius šilumos perdavimo nuostolius AB „Šiaulių energija” valdomuose centralizuoto šilumos tiekimo tinkluose ir nepakankamą energijos perdavimo ir paskirstymo efektyvumą, nusprendė inicijuoti AB „Šiaulių energija“ valdomo Šiaulių miesto Pietinės katilinės šilumos tiekimo tinklo rekonstrukcijos projektą. 2017–2020 m., numatoma vietoje 4 182,25 m DN25–500 mm skersmens senų, požeminiuose, nepraeinamuose kanaluose ir bekanaliu būdu paklotų šilumos tiekimo tinklų sumontuoti naujus iš viso 3 764,24 m ilgio DN25–500 mm skersmens bekanalius optimizuoto diametro ir klojimo trajektorijos, pramoniniu būdu izoliuotus šilumos tiekimo tinklus su gedimų monitoringo sistema. Modernizuojamose trasose šilumos perdavimo nuostoliai sumažės 1 891,92 MWh: nuo 3 595,48 MWh iki 1 703,56 MWh per metus, t. y. 52,62 proc. Dėl mažesnio kuro suvartojimo sumažės išmetamas šiltnamio efektą sukeliančių dujų kiekis (planuojamas metinis išmetamų šiltnamio efektą sukeliančių dujų kiekio sumažėjimas 72,56 tCO2ek). Rekonstruotomis trasomis šiluma bus tiekiama patikimiau ir šilumos tiekimo kokybė pagerės 585 prijungtiems vartotojams. (Lithuanian)
    0 references
    Taking into account the high prices of fuel and other resources used for the production of thermal energy, significant heat transfer losses in district heating networks operated by AB Å iauliø energija and the lack of energy transmission and distribution efficiency, AB Å iauliø Energija decided to initiate a project for the reconstruction of the heating supply network of the Southern boiler house operated by Siauliai Energija. In 2017-2020, it is planned to replace 4 182.25 m DN25-500 mm diameter of old, underground, impassable ducts and unchannelly lined heating networks with a total of 3 764.24 m long DN25-500 mm diameterless trajectory of optimised diameter and laying, industrially insulated heat supply networks with fault monitoring system. On the modernised tracks, heat transfer losses will be reduced by 1 891.92 MWh: from 3 595.48 MWh to 1 703.56 MWh/year, i.e. 52.62 %. Reduced fuel consumption will lead to a reduction in greenhouse gas emissions (an estimated annual reduction in greenhouse gas emissions of 72.56 tCO2ek). The reconstructed tracks will provide more reliable heat supply and improve the quality of heat supply for 585 connected customers. (English)
    1 February 2022
    0 references
    Pramonės g. 10, Šiauliai
    0 references

    Identifiers

    04.3.2-LVPA-K-102-02-0005