Installation of RES by UAB “Šilalės Medium” (Q3791713)

From EU Knowledge Graph
Revision as of 14:37, 1 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the infer coords bot - inferring coordinates from location)
Jump to navigation Jump to search
Project Q3791713 in Lithuania
Language Label Description Also known as
English
Installation of RES by UAB “Šilalės Medium”
Project Q3791713 in Lithuania

    Statements

    0 references
    498,000.0 Euro
    0 references
    786,528.0 Euro
    0 references
    63.32 percent
    0 references
    25 May 2018
    0 references
    28 May 2020
    0 references
    UAB "Šilalės mediena"
    0 references
    0 references

    55°27'16.27"N, 22°3'17.86"E
    0 references
    75283
    0 references
    AB "Šilalės mediena" yra viena didžiausių medienos apdirbimo įmonių V.Lietuvoje. Siekdama efektyviai naudoti išteklius bei sumažinti energetinius kaštus gamybinėje savikainoje, įmonė įgyvendina projektą "AEI diegimas UAB "Šilalės mediena", kurio pagrindinis uždavinys - pastatyti 900kW galios saulės jėgainę, generuojančią diferencijuotą el. energijos srautą. Naudojat Jėgainės el. energiją, įmonė pasigamins apie 10-15 proc. metinio el. energijos poreikio, įdiegus abi priemones energetiniai kaštai EUR per metus sumažės apie 9,1 proc., el. energijos dedamoji savikainoje sumažės iki 5 proc., įmonė išplės AEI tiesioginį panaudojimą gamyboje, padidins AEI pajėgumus Lietuvoje, prisidės prie klimato kaitos pasekmių mažinimo ES ir prie LR įsipareigojimų iki 2020 m. pasiekti 23 proc. iš AEI gaminamos el. energijos lyginant su visu el. energijos vartojimu Lietuvos Respublikoje. (Lithuanian)
    0 references
    JSC “Šilalės Medium” is one of the largest wood processing companies in V.Lithuania. In order to use resources efficiently and reduce energy costs in production costs, the company implements the project “AEI Installation UAB Šillalės Medium”, the main task of which is to build a 900 kW solar power plant generating a differentiated flow of e-energy. Using Jėgainė e-energy, the company will produce about 10-15 per cent of the annual e-energy demand. After the introduction of both measures, energy costs EUR will decrease by about 9.1 per cent per year, the e-energy component in the cost will decrease to 5 per cent, the company will expand the direct use of RES in production, increase RES capacity in Lithuania, contribute to the reduction of climate change consequences in the EU and the commitment of the Republic of Lithuania to reach 23 % of the e-energy produced from RES by 2020 compared to the total consumption of e-energy in the Republic of Lithuania. (English)
    1 February 2022
    0 references
    Raganinės 26, Šilalės r.
    0 references

    Identifiers

    04.2.1-LVPA-K-836-02-0009