ENERGY EFFICIENCY OF VIA LARICI 8 E10 BUILDING IN ROZZANO (Q4200144)

From EU Knowledge Graph
Revision as of 06:24, 1 February 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en, and other parts: Adding English translations)
Jump to navigation Jump to search
Project Q4200144 in Italy
Language Label Description Also known as
English
ENERGY EFFICIENCY OF VIA LARICI 8 E10 BUILDING IN ROZZANO
Project Q4200144 in Italy

    Statements

    0 references
    855,792.58 Euro
    0 references
    1,711,585.17 Euro
    0 references
    50.0 percent
    0 references
    AZIENDA LOMBARDA EDILIZIA RESIDENZIALE MILANO - ALER
    0 references
    0 references
    DAL PUNTO DI VISTA TECNICO L OPERA DA REALIZZARE CONSISTERà IN UN "INTERVENTO DI MANUTENZIONE STRAORDINARIA" AI SENSI DELL ART.3 COMMA “B” DEL D.P.R. 6 GIUGNO 2001, N. 380. AI SENSI DELL ARTICOLO 2, COMMA 1, LETTERA L-VICIES QUATER DEL DECRETO LEGISLATIVO 192/2005 L INTERVENTO PREVISTO SI CONFIGURA COME UNA RISTRUTTURAZIONE IMPORTANTE DI SECONDO LIVELLO ED Ê SOGGETTA ALLE PRESCRIZIONI DEL D.D.U.O. 2456/2017 E DM REQUISITI-MINIMI 26 GIUGNO 2015. SI PREVEDE DI REALIZZARE PER ENTRAMBI GLI EDIFICI: - REALIZZAZIONE DI CAPPOTTO ESTERNO - COIBENTAZIONE SOLAIO PIANO TERRA E ULTIMO SOLAIO - SOSTITUZIONE DEI BALCONI-FRANGISOLE - INSTALLAZIONE IMPIANTO FOTOVOLTAICO - REALIZZAZIONE PARAPETTO IN COPERTURA QUALE DISPOSITIVO DELLA SICUREZZA COLLETTIVO - SOSTITUZIONE ED EFFICIENTAMENTO DEL SISTEMA DI PRODUZIONE DELL ACQUA CALDA SANITARIA - INSTALLAZIONE DI VALVOLE TERMOSTATICHE SUI CORPI SCALDANTI ESISTENTI - INSTALLAZIONE DI IMPIANTI DI VMC PUNTUALI - ACCURATA PULIZIA DELL IMPIANTO TERMICO (Italian)
    0 references
    FROM A TECHNICAL POINT OF VIEW, THE WORK TO BE CARRIED OUT WILL CONSIST OF AN “EXTRAORDINARY MAINTENANCE” PURSUANT TO ART.3 PARAGRAPH B OF PRESIDENTIAL DECREE NO 380 OF 6 JUNE 2001. ACCORDING TO ARTICLE 2, PARAGRAPH 1, LETTER L-VICIES QUATER OF LEGISLATIVE DECREE 192/2005 THE PLANNED INTERVENTION IS A MAJOR RESTRUCTURING OF THE SECOND LEVEL AND IS SUBJECT TO THE REQUIREMENTS OF D.D.U.O. 2456/2017 AND DM REQUIREMENTS-MINIMUM 26 JUNE 2015. IT IS PLANNED TO BUILD FOR BOTH BUILDINGS: — REALISATION OF EXTERNAL COAT — INSULATION ATTIC GROUND FLOOR AND LAST FLOOR FLOOR — REPLACEMENT OF BALCONIES-FRANCHISLES — INSTALLATION OF PHOTOVOLTAIC SYSTEM — REALISATION PARAPET IN ROOF AS A DEVICE OF COLLECTIVE SAFETY — REPLACEMENT AND EFFICIENCY OF THE SYSTEM OF PRODUCTION OF DOMESTIC HOT WATER — INSTALLATION OF THERMOSTATIC VALVES ON THE EXISTING HEATING BODIES — INSTALLATION OF PUNCTUAL VMC SYSTEMS — ACCURATE CLEANING OF THE THERMAL SYSTEM (English)
    1 February 2022
    0 references
    MILANO
    0 references