¿REALISATION OF THE COLLECTION CENTRE BETWEEN THE HAMLETS OF SAN GIOVANNI AND COMPARNI ¿SP78¿ (Q4105690)

From EU Knowledge Graph
Revision as of 21:21, 29 January 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in es, and other parts: Adding Spanish translations)
Jump to navigation Jump to search
Project Q4105690 in Italy
Language Label Description Also known as
English
¿REALISATION OF THE COLLECTION CENTRE BETWEEN THE HAMLETS OF SAN GIOVANNI AND COMPARNI ¿SP78¿
Project Q4105690 in Italy

    Statements

    0 references
    74,166.75 Euro
    0 references
    111,111.0 Euro
    0 references
    66.75 percent
    0 references
    COMUNE DI MILETO
    0 references
    0 references
    ¿REALIZZAZIONE CENTRO DI RACCOLTA TRA LE FRAZIONI SAN GIOVANNI E COMPARNI ¿ SP78¿ ¿ COMUNE DI MILETO ¿ (VV). PROGRAMMA OPERATIVO FESR/FSE - CALABRIA 2014/2020 - ASSE 6 - AZIONE 6.1.2. ¿ PDA 1001411 ¿ PROGETTI I FASE ¿ ISOLE ECOLOGICHE (Italian)
    0 references
    ¿REALISATION OF THE COLLECTION CENTRE BETWEEN THE HAMLETS OF SAN GIOVANNI AND COMPARNI ¿SP78¿MUNICIPALITY OF MILETO ¿(VV). OPERATIONAL PROGRAMME ERDF/ESF — CALABRIA 2014/2020 — AXIS 6 — ACTION 6.1.2. ¿PDA 1001411 ¿PROJECTS PHASE ¿ECOLOGICAL ISLANDS (English)
    27 January 2022
    0 references
    RÉALISATION DU CENTRE DE COLLECTE ENTRE LES HAMEAUX DE SAN GIOVANNI ET COMPARNI SP78 DE MILETO (VV). PROGRAMME OPÉRATIONNEL FEDER/FSE — CALABRE 2014/2020 — AXE 6 — ACTION 6.1.2. ¿PDA 1001411Â PHASE DES PROJETS Â’ÎLES ÉCOLOGIQUES (French)
    28 January 2022
    0 references
    REALISIERUNG DES SAMMELZENTRUMS ZWISCHEN DEN WEILERN SAN GIOVANNI UND COMPARNI ¿SP78¿MUNICIPALITY OF MILETO ¿(VV). OPERATIONELLES PROGRAMM EFRE/ESF – KALABRIEN 2014/2020 – ACHSE 6 – MASSNAHME 6.1.2. ¿PDA 1001411 ¿PROJEKTE PHASE ¿ÖKOLOGISCHE INSELN (German)
    28 January 2022
    0 references
    REALISATIE VAN HET VERZAMELCENTRUM TUSSEN DE GEHUCHTEN VAN SAN GIOVANNI EN COMPARNI Â’SP78Â’GEMEENTE MILETO Â"(VV). OPERATIONEEL PROGRAMMA EFRO/ESF — CALABRIË 2014/2020 — AS 6 — ACTIE 6.1.2. Â’PDA 1001411 Â’PROJECTEN FASE Â’ECOLOGISCHE EILANDEN (Dutch)
    29 January 2022
    0 references
    REALIZACIÓN DEL CENTRO DE RECOGIDA ENTRE LAS ALDEAS DE SAN GIOVANNI Y COMPARNI [SP78]MUNICIPIO DE MILETO (VV). PROGRAMA OPERATIVO FEDER/FSE — CALABRIA 2014/2020 — EJE 6 — ACCIÓN 6.1.2. ¿PDA 1001411 ¿PROYECTOS FASE ¿ISLAS ECOLÓGICAS (Spanish)
    29 January 2022
    0 references
    MILETO
    0 references

    Identifiers