CONSTANT DEVELOPMENT AND GROWTH POSTIR — NEW PAINTING PLANT (Q4051646)

From EU Knowledge Graph
Revision as of 16:32, 28 January 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q4051646 in Italy
Language Label Description Also known as
English
CONSTANT DEVELOPMENT AND GROWTH POSTIR — NEW PAINTING PLANT
Project Q4051646 in Italy

    Statements

    0 references
    24,387.59 Euro
    0 references
    48,775.18 Euro
    0 references
    50.0 percent
    0 references
    POSTIR SRL
    0 references
    0 references
    NELL¿ULTIMO BIENNIO POSTIR SRL HA INCREMENTATO I RICAVI DA PRODUZIONE DEL 20% E QUESTO HA PORTATO ALLA DECISIONE DI ACQUISTARE NEL 2017 BEN DUE IMMOBILI ADIACENTI A QUELLO ESISTENTE IN VIA 2 GIUGNO, DECIDENDO TRA L¿ALTRO DI SPOSTARE L¿ATTUALE FASE DI VERNICIATURA CHE OGGI SI TROVA IN VIA PEDRET. TALE OPERAZIONE PORTERà A UN NOTEVOLE RISPARMIO DI COSTI E TEMPO DOVUTI ALLO SPOSTAMENTO DI PARTI PRODOTTE DA VERNICIARE. INOLTRE TRA I TRE CAPANNONI ADIACENTI SITI IN VIA 2 GIUGNO 13 / 12 E 8 PE (Italian)
    0 references
    IN THE LAST TWO YEARS POSTIR SRL HAS INCREASED PRODUCTION REVENUES BY 20 % AND THIS LED TO THE DECISION TO BUY IN 2017 TWO BUILDINGS ADJACENT TO THE ONE EXISTING ON 2 JUNE, DECIDING AMONG OTHER THINGS TO MOVE THE CURRENT PAINTING PHASE THAT IS NOW LOCATED IN VIA PEDRET. THIS OPERATION WILL LEAD TO CONSIDERABLE COST AND TIME SAVINGS DUE TO THE MOVEMENT OF PARTS PRODUCED TO BE PAINTED. IN ADDITION, BETWEEN THE THREE ADJACENT SHEDS LOCATED IN VIA 2 JUNE 13/12 AND 8 EP (English)
    27 January 2022
    0 references
    AU COURS DES DEUX DERNIÈRES ANNÉES, POSTIR SRL A AUGMENTÉ SES REVENUS DE PRODUCTION DE 20 %, CE QUI A CONDUIT À LA DÉCISION D’ACHETER EN 2017 DEUX BÂTIMENTS ADJACENTS À CELUI EXISTANT LE 2 JUIN, EN DÉCIDANT ENTRE AUTRES DE DÉPLACER LA PHASE DE PEINTURE ACTUELLE QUI EST MAINTENANT SITUÉE DANS VIA PEDRET. CETTE OPÉRATION ENTRAÎNERA DES ÉCONOMIES DE TEMPS ET DE COÛTS CONSIDÉRABLES EN RAISON DU MOUVEMENT DES PIÈCES PRODUITES À PEINDRE. EN OUTRE, ENTRE LES TROIS HANGARS ADJACENTS SITUÉS LE 2 JUIN 13/12 ET LE 8 PE (French)
    28 January 2022
    0 references
    IN DEN LETZTEN ZWEI JAHREN HAT POSTIR SRL DEN PRODUKTIONSUMSATZ UM 20 % GESTEIGERT, WAS DAZU GEFÜHRT HAT, 2017 ZWEI GEBÄUDE NEBEN DEM AM 2. JUNI BESTEHENDEN GEBÄUDE ZU KAUFEN UND UNTER ANDEREM DIE AKTUELLE LACKIERUNGSPHASE ZU VERSCHIEBEN, DIE SICH NUN ÜBER PEDRET BEFINDET. DIESE OPERATION FÜHRT ZU ERHEBLICHEN KOSTEN- UND ZEITEINSPARUNGEN DURCH DIE BEWEGUNG DER ZU LACKIERENDEN TEILE. DARÜBER HINAUS ZWISCHEN DEN DREI ANGRENZENDEN SCHUPPEN, DIE SICH ÜBER DEN 2. JUNI 13/12 UND 8 EP BEFINDEN (German)
    28 January 2022
    0 references
    ROMANS D'ISONZO
    0 references