(14508.17092020.172001011) EFFTECON (Q4078432)
Jump to navigation
Jump to search
Project Q4078432 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | (14508.17092020.172001011) EFFTECON |
Project Q4078432 in Italy |
Statements
17,083.9 Euro
0 references
34,167.8 Euro
0 references
50.0 percent
0 references
TECON S.R.L.
0 references
IL PROGETTO SI COMPONE DI 4 ATTIVIT? COMPLEMENTARI CHE RIGUARDANO SIA LA STRUTTURA GENERALE CHE ALCUNE AREE DI PRODUZIONE BEN DEFINITE.IL REPARTO ?RETTIFICHE? NEL QUALE SI ESEGUONO LE LAVORAZIONI CONCLUSIVE DELLA PRODUZIONE DEGLI UTENSILI PER LA CALZATURA E PELLETTERIA, CORE BUSINESS DELL?AZIENDA, ? DESTINATARIO DI UNA PARTE DEL PROGETTO DI EFFICIENTAMENTO DELLA PRODUZIONE VOLTA SIA A RIDURRE I TEMPI NON A VALORE E QUINDI CON UN MIGLIORAMENTO DELLA PRODUTTIVIT? NONCH? DELLA QUALIT? DEI PRODOTTI.IN PARTICOLARE SI TRATTA DEL RIFACIMENTO DELLE MOTORIZZAZIONI E DEL CONTROLLO ELETTRONICO DELLE MACCHINE ANCHE IN TERMINI DI FABBRICA 4.0 CON CONSEGUENTE ANALISI DEI FERMI MACCHINA, RIDUZIONE DEI FERMI E GUASTI DOVUTI ALL?UTILIZZO DI APPARECCHIATURE ALLO STATO DELL?ARTE. NELLO STESSO SENSO VA L?INSTALLAZIONE DI UNA VASCA DI PRE-FILTRAZIONE E TRANSITO DEGLI SCARTI DI LAVORAZIONE DELLE STESSE RETTIFICHE IN MODO DA RIDURRE IN PESO LA QUANTIT? DI FANGHI DI RETTIFICA DA CONFERIRE ALLO SMALTIMENTO.SEM (Italian)
0 references
DOES THE PROJECT CONSIST OF 4 ACTIVITIES? COMPLEMENTARY THAT CONCERN BOTH THE GENERAL STRUCTURE AND SOME PRODUCTION AREAS WELL DEFINITE.THE DEPARTMENT?RECTIFICATIONS? IN WHICH YOU CARRY OUT THE FINAL MACHINING OF THE PRODUCTION OF TOOLS FOR FOOTWEAR AND LEATHER GOODS, CORE BUSINESS OF THE COMPANY? RECIPIENT OF A PART OF THE PRODUCTION EFFICIENCY PROJECT AIMED BOTH AT REDUCING TIME NOT TO VALUE AND THEREFORE WITH AN IMPROVEMENT IN PRODUCTIVITY? WHAT’S WRONG? OF QUALITY? OF THE PRODUCTS.IN PARTICULAR, IT IS THE REFURBISHMENT OF MOTORISATIONS AND THE ELECTRONIC CONTROL OF THE MACHINES ALSO IN TERMS OF FACTORY 4.0 WITH CONSEQUENT ANALYSIS OF DOWNTIMES, REDUCTION OF STOPS AND FAILURES DUE TO THE USE OF STATE-OF-THE-ART EQUIPMENT. IN THE SAME SENSE IS THE INSTALLATION OF A PRE-FILTRATION AND TRANSIT TANK OF THE PROCESSING WASTE OF THE SAME GRINDING SO AS TO REDUCE THE QUANTITY IN WEIGHT? OF GRINDING SLUDGE TO BE GIVEN TO SMALTIMENTO.SEM (English)
27 January 2022
0 references
LE PROJET SE COMPOSE-T-IL DE 4 ACTIVITÉS? COMPLÉMENTAIRES QUI CONCERNENT À LA FOIS LA STRUCTURE GÉNÉRALE ET CERTAINES ZONES DE PRODUCTION BIEN DEFINITE. DANS LEQUEL VOUS EFFECTUEZ L’USINAGE FINAL DE LA PRODUCTION D’OUTILS POUR LA CHAUSSURE ET LA MAROQUINERIE, CŒUR DE MÉTIER DE L’ENTREPRISE? BÉNÉFICIAIRE D’UNE PARTIE DU PROJET D’EFFICACITÉ DE LA PRODUCTION VISANT À LA FOIS À RÉDUIRE LE TEMPS DE NON-VALEUR ET DONC À AMÉLIORER LA PRODUCTIVITÉ? QU’EST-CE QUI NE VA PAS? DE QUALITÉ? DES PRODUCTS.IN EN PARTICULIER, IL S’AGIT DE LA REMISE À NEUF DES MOTORISATIONS ET DE LA COMMANDE ÉLECTRONIQUE DES MACHINES ÉGALEMENT EN TERMES D’USINE 4.0 AVEC UNE ANALYSE CONSÉQUENTE DES TEMPS D’ARRÊT, DE LA RÉDUCTION DES ARRÊTS ET DES DÉFAILLANCES DUES À L’UTILISATION D’ÉQUIPEMENTS DE POINTE. DANS LE MÊME SENS, EST-CE QUE L’INSTALLATION D’UN RÉSERVOIR DE PRÉFILTRATION ET DE TRANSIT DES DÉCHETS DE TRAITEMENT DU MÊME BROYAGE PERMET DE RÉDUIRE LA QUANTITÉ EN POIDS? DE BOUES DE BROYAGE À DONNER À SMALTIMENTO.SEM (French)
28 January 2022
0 references
COLLE DI VAL D'ELSA
0 references