Statements
91,112.42 Euro
0 references
182,224.83 Euro
0 references
50.0 percent
0 references
5 June 2015
0 references
1 October 2019
0 references
1 October 2019
0 references
MB ELETTRONICA SRL
0 references
SCY, IN LINEA CON LA ROAD MAP PLURIENNALE HORIZON 2020 (AL2) E IL PARADIGMA EMERGENTE BIM (BUILDING INFORMATION MODELING), PROPONE DI MIGLIORARE IL PROCESSO DI PRODUZIONE DEL CANTIERE EDILE SVILUPPANDO TECNOLOGIE, COMPONENTI, MACCHINARI E METODOLOGIE ATTE A MIGLIORARE SECONDO IL MODELLO DELLA FABBRICA INTELLIGENTE IL PROCESSO PRODUTTIVO DEL CANTIERE EDILE. CON UN VALORE DI ALMENO ? 1,2 TRILIONI/ANNUO, IL SETTORE DELLE COSTRUZIONI EUROPEO, COMPRESA LA SUA CATENA DEL VALORE ESTESA, ? LA PI? GRANDE ATTIVIT? E IL PI? GRANDE SETTORE IN TERMINI DI NUMERO DI ADDETTI (30,7% DEL TOT).CON IL TERMINE CANTIERE SI IDENTIFICA GENERICAMENTE IL LUOGO FISICO IN CUI SI SVOLGE UNA LAVORAZIONE TEMPORANEA, PROVVISORIA. LA DEFINIZIONE NORMATIVA (?CANTIERI TEMPORANEI E MOBILI?) IDENTIFICA PERFETTAMENTE UN?ORGANIZZAZIONE TEMPORANEA PER FUNZIONI E ATTIVIT? E ALTRETTANTO MUTEVOLE NELLA LOCALIZZAZIONE OPERATIVA. GENERALIZZANDO UN CANTIERE ? UN IMPIANTO MANIFATTURIERO TEMPORANEO E CHE SI ESTENDE FREQUENTEMENTE PE (Italian)
0 references
SCY, IN LINE WITH THE ROAD MAP HORIZON 2020 (AL2) AND THE EMERGING BIM (BUILDING INFORMATION) PARADIGM, PROPOSES TO IMPROVE THE CONSTRUCTION PROCESS OF THE CONSTRUCTION SITE BY DEVELOPING TECHNOLOGIES, COMPONENTS, MACHINERY AND METHODOLOGIES THAT IMPROVE THE CONSTRUCTION PROCESS OF THE CONSTRUCTION SITE ACCORDING TO THE CONSTRUCTION WORKS MODEL. WITH A VALUE OF AT LEAST? 1,2 TRILLION/YEAR, EUROPEAN CONSTRUCTION SECTOR, INCLUDING ITS EXTENDED VALUE CHAIN? THE IP? LARGE ACTIVITY? AND THE IP? LARGE SECTOR IN TERMS OF THE NUMBER OF EMPLOYEES (30.7 % OF THE TOTAL). WITH THE CONSTRUCTION SITE, THE PHYSICAL LOCATION OF TEMPORARY, TEMPORARY PROCESSING IS GENERALLY IDENTIFIED. DOES THE REGULATORY DEFINITION (TEMPORARY AND MOBILE SITES?) PERFECTLY IDENTIFY A TEMPORARY AGENCY FOR FUNCTIONS AND ACTIVITIES? AND ALSO CHANGING IN OPERATIONAL LOCATION. CREATING A CONSTRUCTION SITE? A TEMPORARY MANUFACTURING PLANT EXTENDING TO THE EUROPEAN UNION (English)
0 references
CONFORMÉMENT À LA FEUILLE DE ROUTE PLURIANNUELLE HORIZON 2020 (AL2) ET AU NOUVEAU PARADIGME BIM (MODÉLISATION DE L’INFORMATION SUR LE BÂTIMENT), SCY PROPOSE D’AMÉLIORER LE PROCESSUS DE PRODUCTION DES CHANTIERS DE CONSTRUCTION EN DÉVELOPPANT DES TECHNOLOGIES, DES COMPOSANTS, DES MACHINES ET DES MÉTHODOLOGIES POUR AMÉLIORER LE PROCESSUS DE PRODUCTION DES CHANTIERS DE CONSTRUCTION SELON LE MODÈLE D’USINE INTELLIGENT. AVEC UNE VALEUR D’AU MOINS? 1.2 BILLIONS/AN, LE SECTEUR EUROPÉEN DE LA CONSTRUCTION, Y COMPRIS SA CHAÎNE DE VALEUR ÉLARGIE? LE PI? UNE GRANDE ACTIVITÉ? QU’EN EST-IL DU PI? GRAND SECTEUR EN TERMES DE NOMBRE D’EMPLOYÉS (30,7 % DU TOTAL). LE CHANTIER NAVAL DE DURÉE DÉTERMINÉE IDENTIFIE GÉNÉRALEMENT L’ENDROIT OÙ LE TRAITEMENT TEMPORAIRE A LIEU. LA DÉFINITION NORMATIVE (LES CHANTIERS TEMPORAIRES ET MOBILES?) IDENTIFIE PARFAITEMENT UNE ORGANISATION TEMPORAIRE POUR LES FONCTIONS ET LES ACTIVITÉS? ET AUSSI CHANGEANT DANS L’EMPLACEMENT OPÉRATIONNEL. GÉNÉRALISER UN CHANTIER DE CONSTRUCTION? UNE USINE DE FABRICATION TEMPORAIRE QUI PROLONGE FRÉQUEMMENT LE PE (French)
23 December 2021
0 references
IN OVEREENSTEMMING MET DE MEERJARENROUTEKAART VAN HORIZON 2020 (AL2) EN HET OPKOMENDE BIM-PARADIGMA (BOUWINFORMATIEMODELLERING) STELT SCY VOOR OM HET PRODUCTIEPROCES VAN DE BOUWPLAATS TE VERBETEREN DOOR TECHNOLOGIEËN, COMPONENTEN, MACHINES EN METHODOLOGIEËN TE ONTWIKKELEN OM HET PRODUCTIEPROCES VAN DE BOUWPLAATS TE VERBETEREN VOLGENS HET INTELLIGENTE FABRIEKSMODEL. MET EEN WAARDE VAN TENMINSTE? 1,2 BILJOEN PER JAAR, DE EUROPESE BOUWSECTOR, MET INBEGRIP VAN DE UITGEBREIDE WAARDEKETEN? DE PI? GEWELDIGE ACTIVITEIT? HOE ZIT HET MET DE PI? GROTE SECTOR IN TERMEN VAN HET AANTAL WERKNEMERS (30,7 % VAN HET TOTAAL).WITH DE TERM WERF OVER HET ALGEMEEN IDENTIFICEERT DE FYSIEKE PLAATS WAAR TIJDELIJKE, TIJDELIJKE VERWERKING PLAATSVINDT. DE NORMATIEVE DEFINITIE (TIJDELIJKE EN MOBIELE BOUWPLAATSEN?) IDENTIFICEERT PERFECT EEN TIJDELIJKE ORGANISATIE VOOR FUNCTIES EN ACTIVITEITEN? EN OOK VERANDEREN IN OPERATIONELE LOCATIE. EEN BOUWPLAATS GENERALISEREN? EEN TIJDELIJKE PRODUCTIE-INSTALLATIE DIE VAAK PE VERLENGT (Dutch)
24 December 2021
0 references
SCY SCHLÄGT IM EINKLANG MIT DEM MEHRJÄHRIGEN FAHRPLAN VON HORIZONT 2020 (AL2) UND DEM SICH ABZEICHNENDEN PARADIGMA BIM (GEBÄUDEINFORMATIONSMODELLIERUNG) VOR, DEN PRODUKTIONSPROZESS DER BAUSTELLE DURCH DIE ENTWICKLUNG VON TECHNOLOGIEN, KOMPONENTEN, MASCHINEN UND METHODEN ZU VERBESSERN, UM DEN PRODUKTIONSPROZESS DER BAUSTELLEN NACH DEM INTELLIGENTEN FABRIKMODELL ZU VERBESSERN. MIT EINEM WERT VON MINDESTENS? 1,2 BILLIONEN/JAHR, DER EUROPÄISCHE BAUSEKTOR, EINSCHLIESSLICH SEINER ERWEITERTEN WERTSCHÖPFUNGSKETTE? DIE PI? GROSSE AKTIVITÄT? WAS IST MIT DER PI? GROSSER SEKTOR IN BEZUG AUF DIE ZAHL DER BESCHÄFTIGTEN (30,7 % DER GESAMTZAHL). DER BEGRIFF WERFT IDENTIFIZIERT IM ALLGEMEINEN DEN PHYSISCHEN ORT, AN DEM VORÜBERGEHENDE, VORÜBERGEHENDE VERARBEITUNG STATTFINDET. DIE NORMATIVE DEFINITION (VORÜBERGEHENDE UND MOBILE BAUSTELLEN?) IDENTIFIZIERT PERFEKT EINE TEMPORÄRE ORGANISATION FÜR FUNKTIONEN UND AKTIVITÄTEN? EBENSO VERÄNDERT SICH DER BETRIEBSSTANDORT. VERALLGEMEINERUNG EINER BAUSTELLE? EINE TEMPORÄRE PRODUKTIONSANLAGE, DIE HÄUFIG PE ERWEITERT (German)
25 December 2021
0 references
SCY, EN CONSONANCIA CON LA HOJA DE RUTA PLURIANUAL HORIZONTE 2020 (AL2) Y EL PARADIGMA EMERGENTE BIM (MODELO DE INFORMACIÓN DE CONSTRUCCIÓN), PROPONE MEJORAR EL PROCESO DE PRODUCCIÓN DE LAS OBRAS MEDIANTE EL DESARROLLO DE TECNOLOGÍAS, COMPONENTES, MAQUINARIA Y METODOLOGÍAS PARA MEJORAR EL PROCESO DE PRODUCCIÓN DE LAS OBRAS DE CONSTRUCCIÓN DE ACUERDO CON EL MODELO DE FÁBRICA INTELIGENTE. ¿CON UN VALOR DE AL MENOS? 1,2 BILLONES AL AÑO, EL SECTOR DE LA CONSTRUCCIÓN EUROPEO, INCLUIDA SU CADENA DE VALOR AMPLIADA? ¿EL PI? ¿UNA GRAN ACTIVIDAD? ¿QUÉ PASA CON EL PI? GRAN SECTOR EN TÉRMINOS DE NÚMERO DE EMPLEADOS (30,7 % DEL TOTAL).CON EL TÉRMINO ASTILLERO GENERALMENTE SE IDENTIFICA EL LUGAR FÍSICO DONDE SE LLEVA A CABO EL PROCESAMIENTO TEMPORAL Y TEMPORAL. LA DEFINICIÓN NORMATIVA (¿LUGARES DE CONSTRUCCIÓN TEMPORALES Y MÓVILES?) IDENTIFICA PERFECTAMENTE A UNA ORGANIZACIÓN TEMPORAL PARA LAS FUNCIONES Y ACTIVIDADES? E IGUAL CAMBIO EN LA UBICACIÓN OPERATIVA. ¿GENERALIZAR UN SITIO DE CONSTRUCCIÓN? UNA PLANTA DE FABRICACIÓN TEMPORAL QUE CON FRECUENCIA EXTIENDE EL PE (Spanish)
25 January 2022
0 references
Identifiers
D52C15001070009
0 references