(A19_075_2015_0750008_1010) CREOMALOMBARDI 100 KWH (Q2065880)

From EU Knowledge Graph
Revision as of 07:38, 25 January 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in es, and other parts: Adding Spanish translations)
Jump to navigation Jump to search
Project Q2065880 in Italy
Language Label Description Also known as
English
(A19_075_2015_0750008_1010) CREOMALOMBARDI 100 KWH
Project Q2065880 in Italy

    Statements

    0 references
    29,198.0 Euro
    0 references
    58,396.0 Euro
    0 references
    50.0 percent
    0 references
    25 February 2015
    0 references
    18 October 2017
    0 references
    25 February 2017
    0 references
    CREMA LOMBARDI SNC DI FRANCESCO E LORENZO LOMBARDI
    0 references
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    INSTALLAZIONE IMPIANTO FOTOVOLTAICO DI POTENZA 100 KWP SULLE COPERTURE DI FABBRICATI AD USO PROMISCUO POSTI IN VECCHIANO VIA DEL BECCACCINO 4. (Italian)
    0 references
    INSTALLATION OF 100 KWP PHOTOVOLTAIC POWER PLANT ON MIXED-USE BUILDINGS INSTALLED IN VECCIANO VIA COMMON VACCINE 4. (English)
    0 references
    INSTALLATION D’UN SYSTÈME PHOTOVOLTAÏQUE DE 100 KWP SUR LES TOITS DE BÂTIMENTS À USAGE PROMIS, PLACÉS À VECCHIANO VIA DEL PECCACCINO 4. (French)
    16 December 2021
    0 references
    INSTALLATIE VAN 100 KWP VERMOGEN FOTOVOLTAÏSCHE SYSTEEM OP DE DAKEN VAN GEBOUWEN VOOR PROMISCUUS GEBRUIK GEPLAATST IN VECCHIANO VIA DEL PECCACCINO 4. (Dutch)
    23 December 2021
    0 references
    INSTALLATION VON 100 KWP PHOTOVOLTAIKANLAGE AUF DEN DÄCHERN VON GEBÄUDEN FÜR DEN PROMISCUOUS EINSATZ IN VECCHIANO VIA DEL PECCACCINO 4. (German)
    24 December 2021
    0 references
    INSTALACIÓN DE UN SISTEMA FOTOVOLTAICO DE POTENCIA DE 100 KWP EN LOS TECHOS DE EDIFICIOS PARA USO PROMISCUO COLOCADOS EN VECCHIANO VÍA DEL PECCACCINO 4. (Spanish)
    25 January 2022
    0 references

    Identifiers