ID SAID_010 “ENERGY EFFICIENCY AND DISTRICT WATER NETWORKS 6.1” (Q2052472)

From EU Knowledge Graph
Revision as of 06:41, 25 January 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in es, and other parts: Adding Spanish translations)
Jump to navigation Jump to search
Project Q2052472 in Italy
Language Label Description Also known as
English
ID SAID_010 “ENERGY EFFICIENCY AND DISTRICT WATER NETWORKS 6.1”
Project Q2052472 in Italy

    Statements

    0 references
    1,694,355.0 Euro
    0 references
    3,388,710.0 Euro
    0 references
    50.0 percent
    0 references
    1 March 2014
    0 references
    17 November 2020
    0 references
    ENTE DI GOVERNO DELL'AMBITO DELLA SARDEGNA
    0 references
    0 references
    0 references

    40°43'23.74"N, 8°33'39.64"E
    0 references
    ESECUZIONE DI TUTTI I LAVORI E FORNITURE NECESSARIE PER L¿INTERVENTO DI "PROGRAMMAZIONE DELIBERA CIPE N° 27/2015 - EFFICIENTAMENTO DELLE RETI DI DISTRIBUZIONE IDRICA E RIFACIMENTO ALLACCI NELLA ZONA OPERATIVA 6.1 - COMUNE DI SASSARI". LE OPERE SOMMARIAMENTE POSSONO RIASSUMERSI IN: - ESECUZIONE DELLO SCAVO, POSA IN OPERA DI TUBAZIONE IN G.S. DIAMETRO 300 MM. PER ML. 1.562,51 CON COLLEGAMENTO ALLE CONDOTTE ESISTENTI CON FORNITURA E POSA IN OPERA DI APPARECCHIATURE IDRAULICHE; O REALIZZAZIONE DEL RISANAMENTO DELLA CONDOTTA IN ACCIAIO ALL¿INTERNO DELL¿ATTRAVERSAMENTO FERROVIARIO DI VIA VITTORIO BELLINI CON METODO NON DISTRUTTIVO C.I.P.P. O ESECUZIONE DI ALLACCI ALLE UTENZE IN N° 309; O ESECUZIONE DI DEMOLIZIONE E RIPRISTINO DI PAVIMENTAZIONI STRADALI; O REALIZZAZIONE DELLA GEOREFERENZIAZIONE DELLE OPERE; O LA FORMA E LE DIMENSIONI DELLE OPERE RISULTANO DAL SUCCITATO PROGETTO APPROVATO (Italian)
    0 references
    COMPLETION OF ALL THE WORKS AND SUPPLIES NEEDED FOR THE “PROGRAMMING OF CIPE DECISION NO 27/2015 — THE EFFICIENCY OF THE WATER DISTRIBUTION NETWORKS AND THE RENOVATION OF THE SHOPS IN THE 6.1 OPERATIONAL ZONE — MUNICIPALITY OF SASSARI”. THE FOLLOWING CAN BE SUMMARISED AS FOLLOWS: — EXECUTION OF THE EXCAVATION, PLACING OF PIPES IN G.S. DIAMETER 300 MM. PER ML. 1.562,51 LINKING THE EXISTING PIPELINES TO SUPPLY AND INSTALLATION OF HYDRAULIC EQUIPMENT; OR UNDERTAKING THE REORGANISATION OF THE STEEL LINE DIVISION OF THE PASSAGEWAY BETWEEN VITTORIO BELLINI WITH THE NON-DESTRUCTIVE METHOD OR THE EXECUTION OF ENCLOSURES TO USERS IN N° 309; OR CARRYING OUT DEMOLITION AND REHABILITATION OF ROAD PAVEMENTS; OR THE LOCATION OF GEOREFERENCING THE WORKS; OR THE SHAPE AND SIZE OF THE WORKS RESULT FROM THE APPROVED DESIGN REFERRED TO ABOVE. (English)
    0 references
    EXÉCUTION DE TOUS LES TRAVAUX ET FOURNITURES NÉCESSAIRES À L’INTERVENTION DE «CIPE RÉSOLUTION PLANNING NO 27/2015 — EFFICACITÉ DES RÉSEAUX DE DISTRIBUTION D’EAU ET DE RACCORDEMENT DANS LA ZONE D’EXPLOITATION 6.1 — MUNICIPALITÉ DE SASSARI». LES TRAVAUX PEUVENT ÊTRE RÉSUMÉS DANS: — EXÉCUTION DE L’EXCAVATION, INSTALLATION DE TUYAUX EN DIAMÈTRE G.S. 300 MM. PAR ML. 1.562.51 AVEC RACCORDEMENT AUX CANALISATIONS EXISTANTES AVEC FOURNITURE ET INSTALLATION D’ÉQUIPEMENTS HYDRAULIQUES; O LA RÉALISATION DE LA RÉNOVATION DU TUYAU D’ACIER À L’INTÉRIEUR DU PASSAGE À NIVEAU DE LA VIA VITTORIO BELLINI AVEC UNE MÉTHODE NON DESTRUCTIVE C.I.P.P. OU D’ÉTABLIR DES CONNEXIONS AVEC LES UTILISATEURS DANS LE NO 309; OU LA DÉMOLITION ET LA REMISE EN ÉTAT DES CHAUSSÉES; O LA RÉALISATION DU GÉORÉFÉRENCEMENT DES TRAVAUX; O LA FORME ET LA TAILLE DES TRAVAUX RÉSULTENT DU PROJET APPROUVÉ CI-DESSUS; (French)
    16 December 2021
    0 references
    UITVOERING VAN ALLE WERKZAAMHEDEN EN BENODIGDHEDEN DIE NODIG ZIJN VOOR DE INTERVENTIE VAN „CIPE-RESOLUTIEPLANNING NR. 27/2015 — EFFICIËNTIE VAN WATERDISTRIBUTIE- EN AANSLUITNETTEN IN DE EXPLOITATIEZONE 6.1 — GEMEENTE SASSARI”. DE WERKEN KUNNEN WORDEN SAMENGEVAT IN: UITVOERING VAN DE OPGRAVING, INSTALLATIE VAN PIJP IN G.S. DIAMETER 300 MM. PER ML. 1.562.51 MET AANSLUITING OP BESTAANDE PIJPLEIDINGEN MET LEVERING EN INSTALLATIE VAN HYDRAULISCHE APPARATUUR; O REALISATIE VAN DE RENOVATIE VAN DE STALEN PIJP BINNEN DE SPOORWEGOVERGANG VAN VIA VITTORIO BELLINI MET EEN NIET-DESTRUCTIEVE METHODE C.I.P.P. OF HET MAKEN VAN VERBINDINGEN MET GEBRUIKERS IN NR. 309; OF SLOOP EN HERSTEL VAN WEGPADEN; O REALISATIE VAN DE GEOREFERENCING VAN DE WERKEN; O DE VORM EN OMVANG VAN DE WERKEN ZIJN HET RESULTAAT VAN HET BOVENGENOEMDE GOEDGEKEURDE PROJECT (Dutch)
    23 December 2021
    0 references
    AUSFÜHRUNG ALLER ARBEITEN UND LIEFERUNGEN, DIE FÜR DIE INTERVENTION DER „CIPE-AUFLÖSUNGSPLANUNG Nr. 27/2015 – EFFIZIENZ DER WASSERVERTEILUNGS- UND ANSCHLUSSNETZE IN DER BETRIEBSZONE 6.1 – GEMEINDE SASSARI“ ERFORDERLICH SIND. DIE ARBEITEN LASSEN SICH ZUSAMMENFASSEN IN: — AUSFÜHRUNG DER AUSGRABUNG, INSTALLATION VON ROHREN IN G.S. DURCHMESSER 300 MM. PRO ML. 1.562.51 MIT ANSCHLUSS AN BESTEHENDE ROHRLEITUNGEN MIT LIEFERUNG UND INSTALLATION VON HYDRAULIKANLAGEN; O REALISIERUNG DER RENOVIERUNG DES STAHLROHRS INNERHALB DER BAHNÜBERGANG ÜBER VITTORIO BELLINI MIT EINER ZERSTÖRUNGSFREIEN METHODE C.I.P.P. ODER ANSCHLÜSSE AN BENUTZER IN Nr. 309; ABRISS UND WIEDERHERSTELLUNG VON STRASSENBELÄGEN; O REALISIERUNG DER GEOREFERENZIERUNG DER WERKE; O DIE FORM UND DIE GRÖSSE DER ARBEITEN ERGEBEN SICH AUS DEM OBEN GENANNTEN GENEHMIGTEN PROJEKT (German)
    24 December 2021
    0 references
    EJECUCIÓN DE TODAS LAS OBRAS Y SUMINISTROS NECESARIOS PARA LA INTERVENCIÓN DE «LA PLANIFICACIÓN DE RESOLUCIÓN CIPE N.º 27/2015 — EFICIENCIA DE LAS REDES DE DISTRIBUCIÓN Y CONEXIÓN DE AGUA EN LA ZONA OPERATIVA 6.1 — MUNICIPIO DE SASSARI». LAS OBRAS PUEDEN RESUMIRSE EN: — EJECUCIÓN DE LA EXCAVACIÓN, INSTALACIÓN DE TUBERÍA EN DIÁMETRO G.S. 300 MM. POR ML. 1.562.51 CON CONEXIÓN A TUBERÍAS EXISTENTES CON SUMINISTRO E INSTALACIÓN DE EQUIPOS HIDRÁULICOS; O REALIZACIÓN DE LA RENOVACIÓN DE LA TUBERÍA DE ACERO DENTRO DEL CRUCE FERROVIARIO DE VÍA VITTORIO BELLINI CON UN MÉTODO NO DESTRUCTIVO C.I.P.P. O HACIENDO CONEXIONES CON LOS USUARIOS EN N.º 309; O DEMOLICIÓN Y RESTAURACIÓN DE PAVIMENTOS DE CARRETERAS; O REALIZACIÓN DE LA GEOREFERENCIACIÓN DE LAS OBRAS; O LA FORMA Y EL TAMAÑO DE LAS OBRAS RESULTAN DEL PROYECTO APROBADO ANTERIORMENTE (Spanish)
    25 January 2022
    0 references

    Identifiers