TOWARDS THE UUTRO (Q1870433)

From EU Knowledge Graph
Revision as of 19:33, 23 January 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in es, and other parts: Adding Spanish translations)
Jump to navigation Jump to search
Project Q1870433 in Italy
Language Label Description Also known as
English
TOWARDS THE UUTRO
Project Q1870433 in Italy

    Statements

    0 references
    14,194.0 Euro
    0 references
    14,194.0 Euro
    0 references
    100.0 percent
    0 references
    22 February 2016
    0 references
    29 December 2016
    0 references
    29 December 2016
    0 references
    C.D. "A. MANZONI"
    0 references
    0 references

    41°27'44.42"N, 15°32'35.02"E
    0 references
    IL PROGETTO RIVOLTO A TUTTI GLI ALUNNI DEL IX CIRCOLO MANZONI AGLI INSEGNANTI E AL PERSONALE ATALA SITUAZIONE ATTUALE DELLISTITUZIONE LA SEGUENTE NON ESISTE UN CABLAGGIO STRUTTURATO FILARE AD ECCEZIONE DEGLI UFFICI E DI 2 LABORATORI PER LE LIM E PER LE POSTAZIONI DIDATTICHE SI UTILIZZA UNA RETE WIRELESS RISULTA IMPOSSIBILE STANTE QUESTA SITUAZIONE INFRASTRUTTURALE GESTIRE I VARI ACCESSI CONTEMPORANEAMENTE IL REGISTRO ELETTRONICO E LE ATTIVIT DIDATTICHE PER CUI SI VERIFICANO FREQUENTEMENTE INTERRUZIONI E DIFFICOLT DI COLLEGAMENTO IL PRESENTE PROGETTO VUOLE ASSICURARE AI DOCENTI E AGLI ALUNNI UN ACCESSO PI AFFIDABILE E VELOCE PER FORNIRE A TUTTI LA POSSIBILIT DI SFRUTTARE COSTANTEMENTE LE RISORSE OFFERTE DALLA RETE SENZA INTERRUZIONI O LENTEZZE CHE NE COMPROMETTANO LUTILIZZO DIDATTICO QUOTIDIANO LINTERVENTO GARANTIR LA COPERTURA DEL 100 DELLE AULE E LABORATORI DELLA SCUOLA (Italian)
    0 references
    THE PROJECT AIMED AT ALL PUPILS FROM THE NINTH CLUB MANZONI TO TEACHERS AND ATALA STAFF AS IS THE CURRENT SITUATION OF THE INSTITUTION, THE FOLLOWING ONE DOES NOT EXIST WITH THE EXCEPTION OF THE OFFICES AND 2 LABORATORIES FOR THE LIM STATIONS AND FOR THE EDUCATIONAL STATIONS, A WIRELESS NETWORK IS IMPOSSIBLE IN VIEW OF THIS INFRASTRUCTURE SITUATION IN ORDER TO PROVIDE TEACHERS AND PUPILS WITH FAST, RELIABLE AND DIFFICULT IP ACCESS IN ORDER TO PROVIDE TEACHERS AND PUPILS WITH A RELIABLE AND FAST ACCESS TO THE NETWORK IN ORDER TO PROVIDE ALL THE POSSIBILITY FOR THE CONTINUOUS USE OF THE RESOURCES OFFERED BY THE NETWORK WITHOUT INTERRUPTION OR SLOWNESS THAT WOULD AFFECT THE USE OF THE RESOURCES OFFERED BY THE NETWORK WITHOUT INTERRUPTION OR SLOWNESS THAT WOULD AFFECT THE EDUCATIONAL USE OF THE NETWORK IN THE COURSE OF THE 100 COVERAGE OF THE CLASSROOMS AND LABORATORIES OF THE SCHOOL. (English)
    0 references
    LE PROJET DESTINÉ À TOUS LES ÉLÈVES DU CLUB IX MANZONI AUX ENSEIGNANTS ET AU PERSONNEL D’ATALA SITUATION ACTUELLE DE L’ÉTABLISSEMENT N’EXISTE PAS DE LIGNE DE CÂBLAGE STRUCTURÉE À L’EXCEPTION DES BUREAUX ET DES 2 LABORATOIRES POUR LIM ET POUR LES STATIONS D’ENSEIGNEMENT EST UTILISÉ UN RÉSEAU SANS FIL, IL EST IMPOSSIBLE DE GÉRER LES DIFFÉRENTS ACCÈS EN MÊME TEMPS LE REGISTRE ÉLECTRONIQUE ET LES ACTIVITÉS ÉDUCATIVES POUR LESQUELLES DES INTERRUPTIONS ET DES DIFFICULTÉS DE CONNEXION SE PRODUISENT FRÉQUEMMENT. RESSOURCES OFFERTES PAR LE RÉSEAU SANS INTERRUPTIONS OU LENTEURS QUI COMPROMETTENT L’UTILISATION QUOTIDIENNE DE L’ENSEIGNEMENT DE L’INTERVENTION POUR ASSURER LA COUVERTURE DES 100 SALLES DE CLASSE ET LABORATOIRES DE L’ÉCOLE (French)
    10 December 2021
    0 references
    HET PROJECT GERICHT OP ALLE LEERLINGEN IN DE IX MANZONI CLUB VOOR LEERKRACHTEN EN ATALA PERSONEEL HUIDIGE SITUATIE VAN DE INSTELLING BESTAAT NIET EEN GESTRUCTUREERDE BEDRADING RIJ MET UITZONDERING VAN DE KANTOREN EN 2 LABORATORIA VOOR LIM EN VOOR ONDERWIJSSTATIONS WORDT GEBRUIK GEMAAKT VAN EEN DRAADLOOS NETWERK IS HET GEZIEN DEZE INFRASTRUCTUURSITUATIE ONMOGELIJK OM DE VERSCHILLENDE TOEGANGEN TE BEHEREN TEGELIJKERTIJD HET ELEKTRONISCHE REGISTER EN DE EDUCATIEVE ACTIVITEITEN WAARVOOR VAAK ONDERBREKINGEN EN MOEILIJKHEDEN VAN DE VERBINDING OPTREDEN HET DOEL VAN DIT PROJECT IS ERVOOR TE ZORGEN DAT LEERKRACHTEN EN LEERLINGEN BETROUWBARE EN SNELLE PI TOEGANG HEBBEN OM IEDEREEN DE MOGELIJKHEID TE BIEDEN OM VOORTDUREND GEBRUIK TE MAKEN VAN DE MIDDELEN AANGEBODEN DOOR HET NETWERK ZONDER ONDERBREKINGEN OF TRAAGHEID DIE HET DAGELIJKSE ONDERWIJSGEBRUIK VAN DE INTERVENTIE IN GEVAAR BRENGEN OM DE DEKKING VAN DE 100 KLASLOKALEN EN LABORATORIA VAN DE SCHOOL TE WAARBORGEN (Dutch)
    22 December 2021
    0 references
    DAS PROJEKT RICHTET SICH AN ALLE SCHÜLER DES IX MANZONI CLUBS AN LEHRER UND ATALA-MITARBEITER AKTUELLE SITUATION DER INSTITUTION: ES GIBT KEINE STRUKTURIERTE VERDRAHTUNGSZEILE MIT AUSNAHME DER BÜROS UND 2 LABORS FÜR LIM UND FÜR LEHRSTELLEN WIRD EIN DRAHTLOSES NETZWERK GENUTZT, DA DIESE INFRASTRUKTURSITUATION ZUR GLEICHEN ZEIT DAS ELEKTRONISCHE REGISTER UND DIE BILDUNGSAKTIVITÄTEN VERWALTEN KANN, FÜR DIE HÄUFIG UNTERBRECHUNGEN UND VERBINDUNGSSCHWIERIGKEITEN AUFTRETEN, DAS ZIEL DIESES PROJEKTS IST ES SICHERZUSTELLEN, DASS LEHRER UND SCHÜLER EINEN ZUVERLÄSSIGEN UND SCHNELLEN ZUGANG ZUM PI HABEN, UM ALLEN DIE MÖGLICHKEIT ZU BIETEN, DIE RESSOURCEN STÄNDIG ZU NUTZEN. ANGEBOTEN VOM NETZWERK OHNE UNTERBRECHUNGEN ODER LANGSAMKEITEN, DIE DIE TÄGLICHE UNTERRICHTSNUTZUNG DER INTERVENTION BEEINTRÄCHTIGEN, UM DIE ABDECKUNG DER 100 KLASSEN UND LABORS DER SCHULE ZU GEWÄHRLEISTEN (German)
    23 December 2021
    0 references
    EL PROYECTO DIRIGIDO A TODOS LOS ALUMNOS DEL IX CLUB MANZONI A LOS PROFESORES Y AL PERSONAL DE ATALA SITUACIÓN ACTUAL DE LA INSTITUCIÓN NO EXISTE UNA LÍNEA DE CABLEADO ESTRUCTURADO CON LA EXCEPCIÓN DE LAS OFICINAS Y 2 LABORATORIOS PARA LIM Y PARA LAS ESTACIONES DE ENSEÑANZA SE UTILIZA UNA RED INALÁMBRICA, ES IMPOSIBLE, DADA ESTA SITUACIÓN DE INFRAESTRUCTURA PARA GESTIONAR LOS DIVERSOS ACCESOS AL MISMO TIEMPO EL REGISTRO ELECTRÓNICO Y LAS ACTIVIDADES EDUCATIVAS PARA LAS QUE SE PRODUCEN INTERRUPCIONES Y DIFICULTADES DE CONEXIÓN CON FRECUENCIA EL OBJETIVO DE ESTE PROYECTO ES GARANTIZAR QUE LOS PROFESORES Y ALUMNOS TENGAN UN ACCESO FIABLE Y RÁPIDO PI CON EL FIN DE OFRECER A TODOS LA POSIBILIDAD DE HACER UN USO CONSTANTE DE LA RECURSOS OFRECIDOS POR LA RED SIN INTERRUPCIONES NI LENTITUD QUE COMPROMETEN EL USO DIARIO DE LA ENSEÑANZA DE LA INTERVENCIÓN PARA ASEGURAR LA COBERTURA DE LAS 100 AULAS Y LABORATORIOS DE LA ESCUELA (Spanish)
    23 January 2022
    0 references

    Identifiers