Closure of Wastewater Sanitation Systems Connection to the Pedrogão Grande Wastewater Treatment Plant (Q2982800)

From EU Knowledge Graph
Revision as of 11:42, 22 January 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in es, and other parts: Adding Spanish translations)
Jump to navigation Jump to search
Project Q2982800 in Portugal
Language Label Description Also known as
English
Closure of Wastewater Sanitation Systems Connection to the Pedrogão Grande Wastewater Treatment Plant
Project Q2982800 in Portugal

    Statements

    0 references
    933,124.0 Euro
    0 references
    1,097,793.0 Euro
    0 references
    85.0 percent
    0 references
    6 January 2020
    0 references
    30 December 2022
    0 references
    APIN - EMPRESA INTERMUNICIPAL DE AMBIENTE DO PINHAL INTERIOR, E.I.M., S.A.
    0 references
    Q3054883 (Deleted Item)
    0 references
    0 references

    39°55'1.06"N, 8°8'44.02"W
    0 references
    A operação consiste na execução de 13242,50 ml de coletores gravíticos, 3 Estações Elevatórias, 1214,98 ml de condutas elevatórias e 163 ramais de ligação, com ligação ao Subsistema de Saneamento de Pedrogão Grande e tratamento final na ETAR de Pedrogão Grande, com descarga do efluente na linha de água localizada nas imediações da referida ETAR. (Portuguese)
    0 references
    The operation consists of the execution of 13242.50 ml of gravitic collectors, 3 Elevatory Stations, 1214.98 ml of lifting ducts and 163 connecting branches, with connection to the Pedrogão Grande Sanitation Subsystem and final treatment in the treatment plant of Pedrogão Grande, with discharge of the effluent into the water line located in the vicinity of the said treatment plant. (English)
    9 July 2021
    0 references
    L’opération consiste en l’exécution de 13 242,50 ml de collecteurs gravitiques, 3 stations de levage, 1 214,98 ml de tuyaux de levage et 163 branches de raccordement, avec raccordement au sous-système d’assainissement Pedrogão Grande et traitement final à la station d’épuration Pedrogão Grande, avec rejet de l’effluent dans la conduite d’eau située à proximité de ladite station d’épuration des eaux usées. (French)
    7 December 2021
    0 references
    Der Betrieb besteht in der Ausführung von 13 242,50 ml Gravitationskollektoren, 3 Liftstationen, 1 214,98 ml Hubrohren und 163 Anschlusszweigen, mit Anschluss an das Subsystem Pedrogão Grande Sanitation und Endbehandlung am Pedrogão Grande WWTP mit Ableitung des Abflusses in die Wasserleitung in der Nähe der genannten Kläranlage. (German)
    16 December 2021
    0 references
    De operatie bestaat uit de uitvoering van 13 242,50 ml gravitische verzamelaars, 3 liftstations, 1 214,98 ml hijspijpen en 163 verbindingstakken, met aansluiting op het subsysteem Pedrogão Grande Sanitation en eindbehandeling in de Pedrogão Grande WWTP, met lozing van het effluent in de waterleiding in de nabijheid van de genoemde rioolwaterzuiveringsinstallatie. (Dutch)
    20 December 2021
    0 references
    L'operazione consiste nell'esecuzione di 13 242,50 ml di collettori gravitici, 3 stazioni di elevazione, 1 214,98 ml di tubi di sollevamento e 163 rami di connessione, con connessione al sottosistema Pedrogão Grande Sanitation e trattamento finale presso il Pedrogão Grande WWTP, con scarico degli effluenti nella linea idrica situata nelle vicinanze di detto impianto di depurazione. (Italian)
    18 January 2022
    0 references
    La operación consiste en la ejecución de 13 242,50 ml de colectores graviticos, 3 Estaciones elevadoras, 1 214,98 ml de tuberías elevadoras y 163 ramas de conexión, con conexión al subsistema de saneamiento Pedrogão Grande y tratamiento final en la EDAR de Pedrogão Grande, con descarga del efluente en la línea de agua situada en las inmediaciones de dicha planta de tratamiento de aguas residuales. (Spanish)
    22 January 2022
    0 references
    Pedrógão Grande, Pedrógão Grande
    0 references

    Identifiers

    POSEUR-03-2012-FC-001220