Maintenance of the Dunar Ecosystem of Mira Beach (Q2981463)

From EU Knowledge Graph
Revision as of 11:23, 22 January 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in es, and other parts: Adding Spanish translations)
Jump to navigation Jump to search
Project Q2981463 in Portugal
Language Label Description Also known as
English
Maintenance of the Dunar Ecosystem of Mira Beach
Project Q2981463 in Portugal

    Statements

    0 references
    124,345.0 Euro
    0 references
    149,834.0 Euro
    0 references
    82.99 percent
    0 references
    9 October 2019
    0 references
    9 October 2020
    0 references
    MUNICÍPIO DE MIRA
    0 references
    Q2990371 (Deleted Item)
    0 references
    0 references

    40°27'8.86"N, 8°47'58.81"W
    0 references
    O projeto objetiva-se na recuperação do sistema dunar entre a duna a sul da marginal e o último apoio da praia (com uma extensão de 680 metros), com soluções de estabilização e proteção do cordão dunar, através do recurso à implementação de passadiços. (Portuguese)
    0 references
    The project aims to recover the dune system between the dune to the south of the marginal and the last support of the beach (with an extension of 680 meters), with solutions for stabilisation and protection of the dune cord, through the use of the implementation of walkways. (English)
    9 July 2021
    0 references
    Le projet vise la récupération du système des dunes entre la dune au sud du marginal et le dernier support de la plage (d’une longueur de 680 mètres), avec des solutions pour la stabilisation et la protection du cordon des dunes, grâce à l’utilisation de passerelles. (French)
    7 December 2021
    0 references
    Das Projekt zielt auf die Wiederherstellung des Dünensystems zwischen der Düne südlich des Randes und der letzten Unterstützung des Strandes (mit einer Länge von 680 Metern), mit Lösungen für die Stabilisierung und den Schutz der Dünenschnur, durch den Einsatz von Gehwegen. (German)
    15 December 2021
    0 references
    Het project is gericht op het herstel van het duinsysteem tussen de duin ten zuiden van de rand en de laatste ondersteuning van het strand (met een lengte van 680 meter), met oplossingen voor stabilisatie en bescherming van het duinsnoer, door het gebruik van loopbruggen. (Dutch)
    20 December 2021
    0 references
    Il progetto mira al recupero del sistema di dune tra la duna a sud del marginale e l'ultimo supporto della spiaggia (con una lunghezza di 680 metri), con soluzioni per la stabilizzazione e la protezione del cordone delle dune, attraverso l'uso di passerelle. (Italian)
    18 January 2022
    0 references
    El proyecto tiene como objetivo la recuperación del sistema de dunas entre la duna sur de la marginal y el último soporte de la playa (con una longitud de 680 metros), con soluciones para la estabilización y protección de la cuerda duna, a través del uso de pasarelas. (Spanish)
    22 January 2022
    0 references
    Mira, Praia de Mira
    0 references

    Identifiers

    POSEUR-02-1809-FC-000069
    0 references