Requalification of Largos December 1, Santa Cameroon, Combatants and Liaison Route – Rua Viscount de Ovar (Q2878320)
Jump to navigation
Jump to search
Project Q2878320 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Requalification of Largos December 1, Santa Cameroon, Combatants and Liaison Route – Rua Viscount de Ovar |
Project Q2878320 in Portugal |
Statements
1,181,973.0 Euro
0 references
1,390,556.0 Euro
0 references
85.0 percent
0 references
1 April 2020
0 references
30 August 2021
0 references
MUNICÍPIO DE OVAR
0 references
Q2990942 (Deleted Item)
0 references
Requalificação dos Largos 1.º de Dezembro, Santa Camarão, Combatentes e Percurso de Ligação - Rua Visconde de Ovar, numa extensão total de aproximadamente 1,7 quilómetros, numa área de cerca de 3 hectares (30.000,00 m2). (Portuguese)
0 references
Requalification of Largos 1 December, Santa Cameroon, Combatentes and Liaison Route – Rua Viscount de Ovar, for a total length of approximately 1.7 kilometers, in an area of about 3 hectares (30000.00 m²). (English)
7 July 2021
0 references
Requalification de Largos le 1er décembre, Santa Camarão, Combatentes and Link Route — Visconde de Ovar Street, pour une longueur totale d’environ 1,7 km, sur une superficie d’environ 3 hectares (30 000,00 m²). (French)
5 December 2021
0 references
Requalifizierung Largos 1. Dezember, Santa Camarão, Combatentes und Link Route – Visconde de Ovar Street, für eine Gesamtlänge von ca. 1,7 km, auf einer Fläche von etwa 3 Hektar (30 000,00 m²). (German)
13 December 2021
0 references
Herkwalificatie van Largos 1 december, Santa Camarão, Combatentes en Link Route — Visconde de Ovar Street, voor een totale lengte van ongeveer 1,7 kilometer, over een oppervlakte van ongeveer 3 hectare (30 000,00 m²). (Dutch)
18 December 2021
0 references
Riqualificazione di Largos 1º dicembre, Santa Camarão, Combatentes e Link Route — Visconde de Ovar Street, per una lunghezza totale di circa 1,7 chilometri, su una superficie di circa 3 ettari (30 000,00 m²). (Italian)
17 January 2022
0 references
Recalificación de Largos el 1 de diciembre, Santa Camarão, Combatentes y Ruta de Enlace — Calle Visconde de Ovar, por una longitud total de aproximadamente 1,7 kilómetros, sobre una superficie de aproximadamente 3 hectáreas (30 000,00 m²). (Spanish)
20 January 2022
0 references
Ovar, União das freguesias de Ovar, São João, Arada e São Vicente de Pereira Jusã
0 references
Identifiers
CENTRO-09-2316-FEDER-000161
0 references