Requalification of Largos December 1, Santa Cameroon, Combatants and Liaison Route – Rua Viscount de Ovar (Q2878320)

From EU Knowledge Graph
Revision as of 13:13, 20 January 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in es, and other parts: Adding Spanish translations)
Jump to navigation Jump to search
Project Q2878320 in Portugal
Language Label Description Also known as
English
Requalification of Largos December 1, Santa Cameroon, Combatants and Liaison Route – Rua Viscount de Ovar
Project Q2878320 in Portugal

    Statements

    0 references
    1,181,973.0 Euro
    0 references
    1,390,556.0 Euro
    0 references
    85.0 percent
    0 references
    1 April 2020
    0 references
    30 August 2021
    0 references
    MUNICÍPIO DE OVAR
    0 references
    Q2990942 (Deleted Item)
    0 references

    40°51'34.13"N, 8°37'30.79"W
    0 references
    Requalificação dos Largos 1.º de Dezembro, Santa Camarão, Combatentes e Percurso de Ligação - Rua Visconde de Ovar, numa extensão total de aproximadamente 1,7 quilómetros, numa área de cerca de 3 hectares (30.000,00 m2). (Portuguese)
    0 references
    Requalification of Largos 1 December, Santa Cameroon, Combatentes and Liaison Route – Rua Viscount de Ovar, for a total length of approximately 1.7 kilometers, in an area of about 3 hectares (30000.00 m²). (English)
    7 July 2021
    0 references
    Requalification de Largos le 1er décembre, Santa Camarão, Combatentes and Link Route — Visconde de Ovar Street, pour une longueur totale d’environ 1,7 km, sur une superficie d’environ 3 hectares (30 000,00 m²). (French)
    5 December 2021
    0 references
    Requalifizierung Largos 1. Dezember, Santa Camarão, Combatentes und Link Route – Visconde de Ovar Street, für eine Gesamtlänge von ca. 1,7 km, auf einer Fläche von etwa 3 Hektar (30 000,00 m²). (German)
    13 December 2021
    0 references
    Herkwalificatie van Largos 1 december, Santa Camarão, Combatentes en Link Route — Visconde de Ovar Street, voor een totale lengte van ongeveer 1,7 kilometer, over een oppervlakte van ongeveer 3 hectare (30 000,00 m²). (Dutch)
    18 December 2021
    0 references
    Riqualificazione di Largos 1º dicembre, Santa Camarão, Combatentes e Link Route — Visconde de Ovar Street, per una lunghezza totale di circa 1,7 chilometri, su una superficie di circa 3 ettari (30 000,00 m²). (Italian)
    17 January 2022
    0 references
    Recalificación de Largos el 1 de diciembre, Santa Camarão, Combatentes y Ruta de Enlace — Calle Visconde de Ovar, por una longitud total de aproximadamente 1,7 kilómetros, sobre una superficie de aproximadamente 3 hectáreas (30 000,00 m²). (Spanish)
    20 January 2022
    0 references
    Ovar, União das freguesias de Ovar, São João, Arada e São Vicente de Pereira Jusã
    0 references

    Identifiers

    CENTRO-09-2316-FEDER-000161
    0 references