Sports Pavilion EB School 2 3 in Alcanede (Q2862783)
Jump to navigation
Jump to search
Project Q2862783 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Sports Pavilion EB School 2 3 in Alcanede |
Project Q2862783 in Portugal |
Statements
970,302.0 Euro
0 references
1,141,532.0 Euro
0 references
85.0 percent
0 references
1 July 2019
0 references
29 October 2021
0 references
MUNICÍPIO DE SANTARÉM
0 references
O projeto consiste na construção de um pavilhão desportivo para a escola EB 2 3 de Alcanede, substituindo as soluções precárias atualmente utilizadas por 275 alunos na prática de desporto escolar, concluindo um esforço para dotar a rede escolar concelhia de condições suficientes para a referida prática. (Portuguese)
0 references
The project consists of the construction of a sports pavilion for the school EB 2 3 in Alcanede, replacing the precarious solutions currently used by 275 students in the practice of school sport, concluding an effort to provide the school network with sufficient conditions for this practice. (English)
6 July 2021
0 references
Le projet consiste en la construction d’un pavillon sportif pour l’école EB 2 3 à Alcanede, en remplacement des solutions précaires actuellement utilisées par 275 élèves dans la pratique du sport scolaire, concluant un effort pour doter le réseau scolaire de conditions suffisantes pour cette pratique. (French)
4 December 2021
0 references
Das Projekt besteht aus dem Bau eines Sportpavillons für die EB 2 3 Schule in Alcanede, die die prekären Lösungen ersetzt, die derzeit von 275 Schülern in der Praxis des Schulsports verwendet werden, und Abschluss eines Bemühens, das Schulnetz mit ausreichenden Bedingungen für diese Praxis zu versorgen. (German)
13 December 2021
0 references
Het project bestaat uit de bouw van een sportpaviljoen voor de EB 2 3-school in Alcanede, ter vervanging van de precaire oplossingen die momenteel door 275 studenten worden gebruikt in de uitoefening van schoolsport, en sluit een inspanning af om het schoolnetwerk voldoende voorwaarden voor deze praktijk te bieden. (Dutch)
18 December 2021
0 references
Il progetto consiste nella costruzione di un padiglione sportivo per la scuola EB 2 3 di Alcanede, sostituendo le soluzioni precarie attualmente utilizzate da 275 studenti nella pratica dello sport scolastico, concludendo uno sforzo per fornire alla rete scolastica condizioni sufficienti per questa pratica. (Italian)
17 January 2022
0 references
El proyecto consiste en la construcción de un pabellón deportivo para la escuela EB 2 3 de Alcanede, sustituyendo las precarias soluciones utilizadas actualmente por 275 estudiantes en la práctica del deporte escolar, concluyendo un esfuerzo para dotar a la red escolar de condiciones suficientes para esta práctica. (Spanish)
20 January 2022
0 references
Santarém, Alcanede
0 references
Identifiers
ALT20-02-5673-FEDER-000082
0 references