Reconstruction of the road on a stretch of about 5 km within the national road No. 74 from al. 1 May (bridge on the Łabuńka river) to Szczebrzeska Street (the border of the city of Zamość). (Q85965)
Jump to navigation
Jump to search
Project Q85965 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of the road on a stretch of about 5 km within the national road No. 74 from al. 1 May (bridge on the Łabuńka river) to Szczebrzeska Street (the border of the city of Zamość). |
Project Q85965 in Poland |
Statements
81,867,760.08 zloty
0 references
96,315,011.86 zloty
0 references
85.0 percent
0 references
19 February 2016
0 references
30 November 2022
0 references
MIASTO ZAMOŚĆ
0 references
Przebudowa drogi na odcinku około 5 km w ciągu drogi krajowej nr 74 od al. 1 Maja (most na rzece Łabuńka) do ulicy Szczebrzeskiej (granica miasta Zamość). (Polish)
0 references
Reconstruction of the road on a stretch of about 5 km within the national road No. 74 from al. 1 May (bridge on the Łabuńka river) to Szczebrzeska Street (the border of the city of Zamość). (English)
14 October 2020
0 references
Reconstruction de la route sur un tronçon d’environ 5 km le long de la route nationale no 74 depuis al. 1er mai (pont sur la rivière Łabuńka) jusqu’à la rue Szczebrzeska (la frontière de la ville de Zamość). (French)
30 November 2021
0 references
Umbau der Straße auf einem Abschnitt von ca. 5 km entlang der Nationalstraße Nr. 74 von al. 1. Mai (Brücke über den Fluss Łabuńka) bis Szczebrzeska Straße (Grenze der Stadt Zamość). (German)
7 December 2021
0 references
Reconstructie van de weg op een gedeelte van ongeveer 5 km langs nationale weg nr. 74 van al. 1 mei (brug over de rivier Łabuńka) naar de straat Szczebrzeska (de grens van de stad Zamość). (Dutch)
16 December 2021
0 references
Ricostruzione della strada su un tratto di circa 5 km lungo la strada nazionale n. 74 da al. 1º maggio (ponte sul fiume Łabuńka) fino alla via Szczebrzeska (confine della città Zamość). (Italian)
16 January 2022
0 references
Reconstrucción de la carretera en un tramo de unos 5 km a lo largo de la carretera nacional n.º 74 de al. 1 de mayo (puente sobre el río Łabuńka) hasta la calle Szczebrzeska (la frontera de la ciudad Zamość). (Spanish)
19 January 2022
0 references
Identifiers
POIS.04.02.00-00-0036/16
0 references