Reconstruction of the rockfall S4 of the Siede in Siedenburg. (Q3309271)
Jump to navigation
Jump to search
Project Q3309271 in Germany
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of the rockfall S4 of the Siede in Siedenburg. |
Project Q3309271 in Germany |
Statements
64,597.5 Euro
0 references
129,195.01 Euro
0 references
50.0 percent
0 references
1 July 2018
0 references
31 December 2019
0 references
ULV Große Aue
0 references
Zur Herstellung der faunistischen Durchgängigkeit in der Siede soll der Sohlabsturz S4 zu einem Raugerinne mit Beckenstruktur umgebaut werden. (German)
0 references
In order to produce the faunistic continuity in the boiling point, the S4 rockfall is to be converted into a roughing gutter with a pelvic structure. (English)
24 October 2021
0 references
Pour réaliser la continuité fauniste dans l’ébullition, le crash de la semelle S4 doit être transformé en une gouttière à structure pelvienne. (French)
6 December 2021
0 references
Om de faunistische continuïteit in het kookpunt te produceren, moet de S4 rotsval worden omgezet in een voorbeengoot met een bekkenstructuur. (Dutch)
19 December 2021
0 references
Al fine di produrre la continuità faunistica nel punto di ebollizione, la cascata S4 deve essere convertita in una grondaia sgrossata con una struttura pelvica. (Italian)
18 January 2022
0 references
Diepholz
0 references
Identifiers
DE_TEMPORARY_12056
0 references