Operating aid to overcome the permanent and structural difficulties faced by firms in the region (Q2887702)
Jump to navigation
Jump to search
Project Q2887702 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Operating aid to overcome the permanent and structural difficulties faced by firms in the region |
Project Q2887702 in Portugal |
Statements
17,000.0 Euro
0 references
308,252.0 Euro
0 references
5.51 percent
0 references
1 January 2018
0 references
28 February 2019
0 references
SABOR & COMPANHIA, LDA
0 references
ste projeto apresentar um conjunto de despesas de funcionamento, nomeadamente, CUSTOS SALARIAIS CONTRIBUIÇÕES OBRIGATÓRIAS PARA A SEGURANÇA SOCIAL, RENDAS DAS INSTALAÇÕES, CUSTOS COM O CONSUMO DE ENERGIA ELÉTRICA e ÁGUA, conforme previsto nas subalíneas i), a v), respetivamente, da alínea b) do n.º 1 do artigo 14.º da Portaria n.º 374/2019, de 8 de julho.O projeto permite a manutenção dos 19 p (Portuguese)
0 references
this project presents a set of operating costs, in particular SALARIAL COSTS CONTRIBUTIONS OBRIBUTIONS FOR SOCIAL SECURITY, RENDAS FOR INSTALLATIONS, CUSTS WITH THE CONSUMPTION OF ELETRIC ENERGY and WATER, as provided for in points (i) to (v), respectively, of Article 14(b) of Article 19(1) of Regulation (EC) No. 19 of Article 19 of Regulation (EEC) No. (English)
8 July 2021
0 references
ce projet présente un ensemble de coûts d’exploitation, à savoir les CONTRIBUTIONS OBRIGATIVES SALAIRES DES COSTES POUR LA SÉCURITÉ SOCIALE, les RENDS D’INSTALLATION, les COSTES AVEC LA CONSUMPTION ÉLECTRIQUE ÉNERGIE et L’EAU, conformément à l’article 14, paragraphe 1, points b) i) à v), respectivement, de l’arrêté ministériel d’exécution no 374/2019 du 8 juillet 2019. (French)
5 December 2021
0 references
dieses Projekt enthält eine Reihe von Betriebskosten, nämlich SALARY COSTS OBRIGATIVE CONTRIBUTIONEN FÜR SOZIALSEKURITÄT, INSTALLATION RENDS, KOSTEN MIT ELECTRIC ENERGY CONSUMPTIONS und WATER gemäß Artikel 14 Absatz 1 Buchstabe b Ziffern i bis v des Ministerial-Durchführungsbeschlusses Nr. 374/2019 vom 8. Juli 2019. (German)
13 December 2021
0 references
dit project omvat een reeks exploitatiekosten, namelijk SALARY COSTS OBRIGATIVE CONTRIBUTIONS VOOR SOCIALE SECURITEIT, INSTALLATION RENDS, KOSTEN MET ELECTRIC ENERGIE CONSUMPTIE en WATER, zoals bedoeld in respectievelijk artikel 14, lid 1, onder b), i) tot en met v), van ministerieel uitvoeringsbesluit nr. 374/2019 van 8 juli 2019. (Dutch)
19 December 2021
0 references
il presente progetto presenta una serie di costi operativi, vale a dire CONTRIBUZIONI OBRIGATIVE SALARY COSTS PER SICUREZZA SOCIALE, RENDE DI INSTALLAZIONE, COSTI CON CONSUMO ENERGIA ELETTRICO e ACQUA, come previsto rispettivamente all'articolo 14, paragrafo 1, lettera b), punti da i) a v), del decreto ministeriale di esecuzione n. 374/2019 dell'8 luglio 2019. (Italian)
17 January 2022
0 references
Ponta do Sol, Ponta do Sol
0 references
Identifiers
M1420-11-6076-FEDER-004416
0 references