Innovative Plans to Combat School Failure (Q2870873)

From EU Knowledge Graph
Revision as of 14:09, 17 January 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
Jump to navigation Jump to search
Project Q2870873 in Portugal
Language Label Description Also known as
English
Innovative Plans to Combat School Failure
Project Q2870873 in Portugal

    Statements

    0 references
    3,756,201.0 Euro
    0 references
    4,419,060.0 Euro
    0 references
    85.0 percent
    0 references
    1 September 2016
    0 references
    31 August 2019
    0 references
    COMUNIDADE INTERMUNICIPAL DO OESTE
    0 references
    0 references
    A presente operação diz respeito a ações integradas no Plano Integrado e Inovador de Combate ao Insucesso Escolar – Aluno ao Centro, com inicio a 01.09.2016 e termo a 31.08.2019 (3 anos letivos). (Portuguese)
    0 references
    The present operation concerns actions integrated into the Integrated and Innovative Plan to Combat School Failure Student to the Center, beginning on 01.09.2016 and ending on 31.08.2019 (3 academic years). (English)
    7 July 2021
    0 references
    Cette opération concerne des actions intégrées dans le Plan intégré et innovant de lutte contre l’échec scolaire étudiant au Centre, commençant le 01.09.2016 et se terminant le 31.8.2019 (3 années académiques). (French)
    4 December 2021
    0 references
    Diese Maßnahme betrifft Maßnahmen, die in den integrierten und innovativen Plan zur Bekämpfung von Schulversagen des Zentrums integriert sind, beginnend am 01.09.2016 und bis zum 31.08.2019 (3 akademische Jahre). (German)
    13 December 2021
    0 references
    Deze operatie heeft betrekking op acties die zijn geïntegreerd in het geïntegreerde en innovatieve plan ter bestrijding van schoolfailurestudenten in het centrum, te beginnen op 1 september 2016 en eindigend op 31.8.2019 (3 academische jaren). (Dutch)
    18 December 2021
    0 references
    L'operazione riguarda azioni integrate nel piano integrato e innovativo per combattere il fallimento scolastico degli studenti del Centro, a partire dal 1º settembre 2016 e fino al 31.08.2019 (3 anni accademici). (Italian)
    17 January 2022
    0 references

    Identifiers

    CENTRO-03-5266-FSE-000020
    0 references