Installation of a biomass boiler in Pazo A Toxeiriña (Q3236592)
Jump to navigation
Jump to search
Project Q3236592 in Spain
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation of a biomass boiler in Pazo A Toxeiriña |
Project Q3236592 in Spain |
Statements
33,200.0 Euro
0 references
41,500.0 Euro
0 references
80.0 percent
0 references
24 May 2019
0 references
18 November 2019
0 references
ALDEA DE BUSCAROS SL
0 references
36032
0 references
Sustitución de dos calderas de gasóleo por una caldera de biomasa de pellets, de 200 kW de potencia, para dar servicio de calefacción y agua caliente sanitaria. La instalación incorpora un silo de 25 metros cúbicos de capacidad. (Spanish)
0 references
Replacement of two fuel-oil boilers with one biomass boiler with 200 kW of power, for heating and to produce sanitary hot water. The facility has one reservoir with 25 m3 of capacity. (English)
0 references
Remplacement de deux chaudières diesel par une chaudière à biomasse à granulés de 200 kW pour fournir un service de chauffage et de l’eau chaude domestique. L’installation comprend un silo de 25 mètres cubes de capacité. (French)
5 December 2021
0 references
Austausch von zwei Dieselkesseln durch einen Biomasse-Kessel mit 200 kW Pellet für Heizung und Warmwasser. Die Anlage enthält ein Silo von 25 Kubikmeter Kapazität. (German)
10 December 2021
0 references
Vervanging van twee dieselketels door een 200 kW pelletbiomassaketel voor verwarming en warm water voor huishoudelijk gebruik. De installatie bevat een silo van 25 kubieke meter capaciteit. (Dutch)
18 December 2021
0 references
Sostituzione di due caldaie diesel con una caldaia a biomassa a pellet da 200 kW per fornire servizio di riscaldamento e acqua calda sanitaria. L'installazione incorpora un silo di 25 metri cubi di capacità. (Italian)
17 January 2022
0 references
Moraña
0 references
Identifiers
048-2019000291
0 references