Construction of the S7 expressway. Kraków w. Igołomska – w. Christo Botewa (Q85829)

From EU Knowledge Graph
Revision as of 23:32, 15 January 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
Jump to navigation Jump to search
Project Q85829 in Poland
Language Label Description Also known as
English
Construction of the S7 expressway. Kraków w. Igołomska – w. Christo Botewa
Project Q85829 in Poland

    Statements

    0 references
    0 references
    318,439,702.07 zloty
    0 references
    76,425,528.50 Euro
    13 January 2020
    0 references
    374,634,943.62 zloty
    0 references
    89,912,386.47 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2017
    0 references
    GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
    0 references
    0 references

    50°2'48.8"N, 19°59'49.9"E
    0 references
    Budowa drogi ekspresowej S7, odc. Kraków w. Igołomska – w. Christo Botewa o długości 4,47 (Polish)
    0 references
    Construction of the S7 expressway. Kraków w. Igołomska – V. Christo Botev with a length of 4.47 (English)
    14 October 2020
    0 references
    Construction de l’autoroute S7, p. Kraków c. Igołomska — c. Christo Boteva d’une longueur de 4,47 (French)
    30 November 2021
    0 references
    Bau der Schnellstraße S7, S. Kraków c. Igołomska – c. Christo Boteva mit einer Länge von 4.47 (German)
    7 December 2021
    0 references
    Bouw van de S7 snelweg, blz. Kraków c. Igołomska — c. Christo Boteva met een lengte van 4,47 (Dutch)
    16 December 2021
    0 references
    Costruzione della superstrada S7, p. Cracovia c. Igołomska — c. Christo Boteva con una lunghezza di 4.47 (Italian)
    16 January 2022
    0 references

    Identifiers

    POIS.03.01.00-00-0008/15
    0 references