Commissioning of hybrid wind turbines production (Q123381)

From EU Knowledge Graph
Revision as of 13:24, 15 January 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
Jump to navigation Jump to search
Project Q123381 in Poland
Language Label Description Also known as
English
Commissioning of hybrid wind turbines production
Project Q123381 in Poland

    Statements

    0 references
    1,480,275.0 zloty
    0 references
    355,266.0 Euro
    13 January 2020
    0 references
    3,289,500.0 zloty
    0 references
    789,480.0 Euro
    13 January 2020
    0 references
    45.0 percent
    0 references
    1 March 2017
    0 references
    31 March 2019
    0 references
    GATNER DARIUSZ FIRMA HANDLOWO-USŁUGOWA "DAREX"
    0 references
    0 references

    50°13'26.8"N, 18°43'37.6"E
    0 references
    Projekt zakłada wdrożenie do produkcji typoszeregu hybrydowych turbin wiatrowych w układzie szeregowym o osi poziomej (Polish)
    0 references
    The project assumes implementation for the production of hybrid wind turbines in serial system with horizontal axis (English)
    21 October 2020
    0 references
    Le projet implique la mise en œuvre d’une série d’éoliennes hybrides en série avec un axe horizontal (French)
    2 December 2021
    0 references
    Das Projekt beinhaltet die Umsetzung einer Reihe von Hybrid-Windturbinen in Serie mit einer horizontalen Achse (German)
    8 December 2021
    0 references
    Het project omvat de uitvoering van een reeks hybride windturbines in serie met een horizontale as (Dutch)
    17 December 2021
    0 references
    Il progetto prevede la realizzazione di una serie di turbine eoliche ibride in serie con un asse orizzontale (Italian)
    15 January 2022
    0 references

    Identifiers

    RPSL.03.02.00-24-0278/17
    0 references