Protection and sustainable development of the Lido de Sète in Marseillan – Slice 5 (Q146430)

From EU Knowledge Graph
Revision as of 21:52, 12 January 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
Jump to navigation Jump to search
Project Q146430 in France
Language Label Description Also known as
English
Protection and sustainable development of the Lido de Sète in Marseillan – Slice 5
Project Q146430 in France

    Statements

    0 references
    1,081,080.0 Euro
    0 references
    3,861,000.0 Euro
    0 references
    28.0 percent
    0 references
    11 May 2016
    0 references
    30 April 2019
    0 references
    Sète Agglopôle Méditerranée (SAM)
    0 references
    0 references

    43°30'38.77"N, 3°48'21.67"E
    0 references
    34110
    0 references
    Le projet de protection et aménagement durable du Lido de Sète à Marseillan entre dans sa dernière phase opérationnelle, la phase 5, qui consiste à déployer l'atténuateur de houle sur 1400 m supplémentaire pour arriver à terme à un ouvrage immergé sur 2 400 m. (French)
    0 references
    The project for the protection and sustainable development of the Lido de Sète in Marseillan is entering its last operational phase, Phase 5, which consists of deploying the swell attenuator to an additional 1400 m to complete a 2400 m submerged structure. (English)
    12 October 2020
    0 references
    Das Projekt zum Schutz und zur nachhaltigen Entwicklung des Lido de Sète in Marseillan tritt in seine letzte operative Phase ein, die Phase 5, bei der der Wellenabschwächer auf weitere 1 400 m installiert wird, um zu einem unterirdischen Bauwerk auf 2 400 m zu gelangen. (German)
    1 December 2021
    0 references
    Het project van bescherming en duurzame ontwikkeling van het Lido de Sète in Marseillan betreedt zijn laatste operationele fase, fase 5, die bestaat uit het inzetten van de swell attenuator over een extra 1,400 m om een werk ondergedompeld over 2,400 m te voltooien. (Dutch)
    6 December 2021
    0 references
    Il progetto di protezione e sviluppo sostenibile del Lido de Sète di Marseillan entra nella sua ultima fase operativa, la fase 5, che consiste nel dispiegare l'attenuazione di gonfiamento su un ulteriore 1,400 m per completare un'opera immersa oltre 2,400 m. (Italian)
    12 January 2022
    0 references
    The Sète lido in Marseillan, France. (English)
    Creative Commons
    0 references

    Identifiers

    LR0011181
    0 references
    5208
    0 references