Efficiency of energy consumption in Ploiesti – Public lighting system tram route 102 (Găgeni-North Road-West Road-Free Street (Western Railway Station) (Q2743473)

From EU Knowledge Graph
Revision as of 17:17, 12 January 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
Jump to navigation Jump to search
Project Q2743473 in Romania
Language Label Description Also known as
English
Efficiency of energy consumption in Ploiesti – Public lighting system tram route 102 (Găgeni-North Road-West Road-Free Street (Western Railway Station)
Project Q2743473 in Romania

    Statements

    0 references
    0 references
    14,393,926.77 Romanian Leu
    0 references
    2,878,785.35 Euro
    13 September 2021
    0 references
    16,934,031.49 Romanian Leu
    0 references
    3,386,806.298 Euro
    13 September 2021
    0 references
    85.0 percent
    0 references
    1 February 2018
    0 references
    30 November 2021
    0 references
    MUNICIPIUL PLOIESTI
    0 references
    0 references

    44°55'50.66"N, 26°0'0.72"E
    0 references
    Obiectivul general al proiectului este cresterea eficientei energetice a SIP din Municipiul Ploiești – etapa I: traseul tramvaiului 102. Pentru atingerea acestui obiectiv general, beneficiarul va avea in vedere îndeplinirea a 4 obiective specifice (OS1 - OS4), asa cum sunt prezentate in sectiunea "Obiective specifice ale proiectului", de mai jos. Indeplinirea celor 4 obiective specifice se va realiza prin implementarea urmatorului pachet de masuri: - M1. Modernizarea iluminatului public aferent căilor de circulație ale liniei de tramvai 102 prin înlocuirea corpurilor de iluminat existente cu vapori de sodiu in corpuri de iluminat LED, performante, având integrate capabilități de conectivitate și comunicare. Se va vor avea in vedere si rezolvarea situatiilor de conflict rutier – din punct de vedere luminos (intersecții, treceri de pietoni, sensuri giratorii, etc) astefel incat sa se respecte valorile prevăzute de standardul SREN 13201. Noul sistem de iluminat va respecta prevederile SR EN 13201:2016; - M2. Înlocuirea corpurilor de iluminat în cele 28 stații de așteptare pentru călători prin soluții bazate pe LED; - M3. Implementarea unui sistem de telegestiune a iluminatului bazat pe Open Source Data, cu furnizare de API și facilități de optimizare a consumului energetic, prin care să se monitorizeze și să se controleze individual și pe grupuri funcționarea punctelor luminoase precum și a cutiilor electrice ce deservesc instalația; - M4. Montarea de panouri fotovoltaice ce vor deservi corpurile de iluminat din statiile de asteptare pentru calatori; - M5. Re-întregirea și extinderea sistemului de iluminat cu tehnologie LED și montarea de stâlpi noi, pentru acoperirea zonelor fără iluminat public, în special a căilor de circulație pietonală, conform SR EN 13201:2016. (Romanian)
    0 references
    The general objective of the project is to increase the energy efficiency of the PIS in Ploiesti Municipality – Stage I: tramway 102. In order to achieve this general objective, the beneficiary will consider the achievement of 4 specific objectives (OS1 – OS4), as presented in the section “Specific objectives of the project” below. The achievement of the 4 specific objectives will be achieved by implementing the following package of measures: M1. Modernisation of public lighting related to tram lines 102 by replacing existing luminaires with sodium vapour in high-performance LED luminaires with integrated connectivity and communication capabilities. It will also be considered to solve the situations of road conflict – from a bright point of view (intersections, pedestrian crossings, roundabouts, etc.) so as to comply with the values stipulated by the SREN 13201 standard. The new lighting system will comply with SR EN 13201:2016; M2. Replacement of luminaires in the 28 standby stations for passengers by LED-based solutions; M3. Implementation of an Open Source Data-based lighting telemanagement system with API and power optimisation facilities to monitor and control individually and on groups the operation of light points as well as electric boxes serving the installation; M4. Installation of photovoltaic panels that will serve the lighting fixtures in the waiting stations for travelers; M5. Re-unification and extension of LED technology lighting system and mounting of new poles to cover areas without public lighting, especially pedestrian traffic routes, according to SR EN 13201:2016. (English)
    14 September 2021
    0 references
    Obiectivul general al proiectului este cresterea eficientei energye a SIP din Municipiul Ploiești — etapa I: Traseul tramvaiului 102. Pentru atingerea acestui obiectiv general, beneficiarul va avea in vedere îndeplinirea a 4 obiective specifice (OS1 — OS4), asa cum sunt prezentate in sectiunea «Obiective specifice ale proiectului», de mai jos. Indeplinirea celor 4 obiective specifice se va realiza prin implementationarea urmatorului pachet de masuri: — M1. Modernizarea iluminatului public aferent Căilor de circulație ale liniei de tramvai 102 prin înlocuirea corpurilor de iluminat existente cu vapori de sodiu in corpuri de iluminat LED, performant, având intégrer capabilități de conectivitate și comunicare. Se va vor avea in vedere si rezolvarea situatiilor de conflict rutier — din punct de vedere luminos (intersecții, treceri de pietoni, sensuri giratorii, etc.) astefel Incat sa se respecte valorile prevăzute de standardul SREN 13201. Noul sistem de iluminat va respecta prevederile SR EN 13201:2016; — M2. Înlocuirea corpurilor de iluminat în cele 28 stații de așteptare pentru călători prin soluții bazate pe LED; — M3. Implementarea unui sistem de telegestiune a iluminatului Bazat pe Open Source Data, cu Furnizare de API și Facilități de optimizare a consumului energy, prin care să se monitorizeze și să se controleze individual și pe grupuri funcționarea puncte luminoase precum și a cutiilor electrice ce meritsc instalația; — M4. Montarea de panouri fotovoltaice ce vor deservi corpurile de iluminat din statiile de asteptare pentru calatori; — M5. Re-întregirea și extinderea Sistemului de iluminat cu tehnologie LED și montarea de stâlpi noi, pentru acoperirea zonelor fără iluminat public, în special a Căilor de circulație pietonală, conforme SR EN 13201:2016. (French)
    26 November 2021
    0 references
    Allgemeines Ziel des Projekts ist die Steigerung der Energieeffizienz der GUS in der Gemeinde Ploiesti – Phase I: Straßenbahn 102. Um dieses allgemeine Ziel zu erreichen, wird der Begünstigte die Verwirklichung von vier spezifischen Zielen (OS1 – OS4) in Erwägung ziehen, wie im Abschnitt „Besondere Ziele des Projekts“ dargelegt. Die Verwirklichung der vier spezifischen Ziele wird durch die Umsetzung des folgenden Maßnahmenpakets erreicht: M1. Modernisierung der öffentlichen Beleuchtung für Straßenbahnlinien 102 durch den Austausch bestehender Leuchten durch Natriumdampf in Hochleistungs-LED-Leuchten mit integrierter Konnektivität und Kommunikationsfähigkeit. Es wird auch in Betracht gezogen, die Situationen des Straßenkonflikts zu lösen – aus heller Sicht (Durchschnitte, Fußgängerübergänge, Kreisverkehr usw.), um den in der Norm SREN 13201 festgelegten Werten zu entsprechen. Das neue Beleuchtungssystem wird der SR EN 13201:2016 entsprechen; M2. Austausch von Leuchten in den 28 Standby-Stationen für Fahrgäste durch LED-basierte Lösungen; M3. Implementierung eines quelloffenen, datengestützten Beleuchtungstelemanagement-Systems mit API- und Leistungsoptimierungseinrichtungen zur individuellen Überwachung und Steuerung des Betriebs von Lichtpunkten sowie von elektrischen Boxen, die die Installation bedienen; M4. Installation von Photovoltaik-Panels, die den Beleuchtungseinrichtungen in den Wartestationen für Reisende dienen; M5. Wiedervereinigung und Erweiterung des LED-Technologie-Beleuchtungssystems und Montage neuer Pole auf Bereiche ohne öffentliche Beleuchtung, insbesondere Fußgängerverkehrswege, gemäß SR EN 13201:2016. (German)
    1 December 2021
    0 references
    De algemene doelstelling van het project is het verhogen van de energie-efficiëntie van de DAB in de gemeente Ploiesti — fase I: tram 102. Om deze algemene doelstelling te verwezenlijken, zal de begunstigde de verwezenlijking van vier specifieke doelstellingen (OS1 — OS4) in overweging nemen, zoals hieronder uiteengezet in het deel „Specifieke doelstellingen van het project”. De verwezenlijking van de vier specifieke doelstellingen zal worden bereikt door de uitvoering van het volgende pakket maatregelen: M1. Modernisering van openbare verlichting in verband met tramlijnen 102 door bestaande armaturen te vervangen door natriumdamp in hoogwaardige LED-armaturen met geïntegreerde connectiviteit en communicatiemogelijkheden. Het zal ook worden overwogen om de situaties van verkeerconflicten op te lossen — vanuit een helder standpunt (kruispunten, voetgangersovergangen, rotondes, enz.) om te voldoen aan de waarden die zijn vastgelegd in de SREN 13201-norm. Het nieuwe verlichtingssysteem voldoet aan SR EN 13201:2016; M2. Vervanging van armaturen in de 28 stand-bystations voor passagiers door LED-oplossingen; M3. Invoering van een Open Source Data-based verlichtingstelemanagementsysteem met API- en vermogensoptimalisatiefaciliteiten om de werking van lichtpunten en elektrische boxen die de installatie bedienen, individueel en op groepen te controleren en te controleren; M4. Installatie van fotovoltaïsche panelen die de verlichtingsarmaturen in de wachtstations voor reizigers dienen; M5. Re-ünificatie en uitbreiding van LED-technologie verlichtingssysteem en montage van nieuwe polen voor gebieden zonder openbare verlichting, met name voetgangerswegen, volgens SR EN 13201:2016. (Dutch)
    5 December 2021
    0 references
    L'obiettivo generale del progetto è quello di aumentare l'efficienza energetica del PIS nel Comune di Ploiesti — Fase I: tram 102. Al fine di conseguire questo obiettivo generale, il beneficiario prenderà in considerazione il conseguimento di 4 obiettivi specifici (OS1 — OS4), come illustrato nella sezione "Obiettivi specifici del progetto". Il conseguimento dei 4 obiettivi specifici sarà conseguito attuando il seguente pacchetto di misure: M1. Ammodernamento dell'illuminazione pubblica relativa alle linee di tram 102 sostituendo gli apparecchi di illuminazione esistenti con vapori di sodio in apparecchi a LED ad alte prestazioni con connettività e capacità di comunicazione integrate. Sarà inoltre considerato come risolvere le situazioni di conflitto stradale — da un punto di vista luminoso (intersezioni, attraversamenti pedonali, rotatorie, ecc.) in modo da rispettare i valori stabiliti dalla norma SREN 13201. Il nuovo sistema di illuminazione sarà conforme alla norma SR EN 13201:2016; M2. Sostituzione degli apparecchi di illuminazione nelle 28 stazioni di standby per i passeggeri con soluzioni a LED; M3. Implementazione di un sistema di telegestione di illuminazione Open Source Data-based con API e impianti di ottimizzazione dell'alimentazione per monitorare e controllare individualmente e su gruppi il funzionamento di punti luce e scatole elettriche che servono l'installazione; M4. Installazione di pannelli fotovoltaici che serviranno i dispositivi di illuminazione nelle stazioni di attesa per i viaggiatori; M5. Riunificazione ed estensione del sistema di illuminazione a tecnologia LED e montaggio di nuovi pali per coprire aree senza illuminazione pubblica, in particolare percorsi pedonali, secondo SR EN 13201:2016. (Italian)
    12 January 2022
    0 references
    Municipiul Ploieşti, Romania
    0 references

    Identifiers

    122010
    0 references