Purchase of new machines, structural adaptation of the production hall (Q3060321)
Jump to navigation
Jump to search
Project Q3060321 in Austria
Language | Label | Description | Also known as |
---|---|---|---|
English | Purchase of new machines, structural adaptation of the production hall |
Project Q3060321 in Austria |
Statements
422,059.36 Euro
0 references
16 March 2016
0 references
30 May 2019
0 references
Hiltmann Beschriftung GmbH
0 references
31723
0 references
In order to increase capacity and to ensure the expansion of the product range, a production hall is rented, which is aligned for operational activities and adapted to construction. At the same time, new machines are being purchased. (English)
20 July 2021
0 references
Afin d’augmenter la capacité et d’assurer l’extension de la gamme de produits, un hall de production est loué, destiné à l’activité de l’entreprise et adapté sur le plan de la construction. Dans le même temps, de nouvelles machines sont achetées. (French)
27 November 2021
0 references
Om de capaciteit te vergroten en de uitbreiding van het productassortiment te waarborgen, wordt een productiehal gehuurd, die is ontworpen voor de operationele activiteiten en aangepast is aan de bouw. Tegelijkertijd worden nieuwe machines gekocht. (Dutch)
29 November 2021
0 references
Zur Kapazitätssteigerung sowie um die Erweiterung der Produktpalette zu gewährleisten, wird eine Produktionshalle angemietet, die für die betriebliche Tätigkeit ausgerichtet und baulich adaptiert wird. Gleichzeitig werden neue Maschinen angekauft. (German)
0 references
Al fine di aumentare la capacità e garantire l'ampliamento della gamma di prodotti, viene affittata una sala di produzione, progettata per le attività operative e adattata alla costruzione. Allo stesso tempo, vengono acquistate nuove macchine. (Italian)
11 January 2022
0 references
Vösendorf
0 references
Identifiers
AUST-37
0 references