WIFI NETWORK AND MANAGEMENT OF LETTIONI (Q2418108)

From EU Knowledge Graph
Revision as of 21:31, 24 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2418108 in Italy
Language Label Description Also known as
English
WIFI NETWORK AND MANAGEMENT OF LETTIONI
Project Q2418108 in Italy

    Statements

    0 references
    18,495.45 Euro
    0 references
    18,495.45 Euro
    0 references
    100.0 percent
    0 references
    15 February 2016
    0 references
    13 December 2016
    0 references
    13 December 2016
    0 references
    LICEO SCIENTIFICO "G. MARINELLI" UDINE
    0 references

    46°3'21.56"N, 13°14'30.98"E
    0 references
    REALIZZAZIONE DELLINFRASTRUTTURA RETE WIFI CON COPERTURA AL 100 DEGLI AMBIENTI DELLISTITUTO SCOLASTICO COMPOSTO DA 2 PLESSI PER RENDERE MAGGIORMENTE FRUIBII IN MANIERA COLLABORATIVA STRUMENTI DIDATTICI TECNOLOGICI E SERVIZI DAGLIDALLE STUDENTI DAIDALLE DOCENTI DALLE FAMIGLIE DAL PERSONALE ATA LA SOLUZIONE PREVEDE CABLAGGIO DEDICATO INSTALLAZIONE E GESTIONE ATTRAVERSO MANAGER SWITCH INSTALLAZIONE E CONFIGURAZIONE DEGLI ACCESS POINT POE (Italian)
    0 references
    CONSTRUCTION OF THE WIFI NETWORK INFRASTRUCTURE COVERING 100 OF THE BUILDINGS OF THE SCHOOL ELLISTITUTO ENVIRONMENTS, MADE UP OF 2 UNITS TO MAKE TECHNOLOGICAL TEACHING TOOLS AND SERVICES MORE WIDELY WITH DAIDALLE STUDENTS DAIDALLE TEACHING STAFF FROM THE FAMILIES FROM THE ATA EMPLOYEES, THE SOLUTION INCLUDES DEDICATED INSTALLATION AND MANAGEMENT THROUGH MANAGEMENT OF SWITCHES AND CONFIGURATION OF THE ACCESS POINT POE. (English)
    0 references
    MISE EN ŒUVRE DE L’INFRASTRUCTURE RÉSEAU WIFI AVEC UNE COUVERTURE À 100 DES ENVIRONNEMENTS DE L’ÉCOLE COMPOSÉE DE 2 PLEX POUR RENDRE FRUIBII PLUS COLLABORATIF D’ENSEIGNEMENT DES OUTILS TECHNOLOGIQUES ET DES SERVICES DAGLIDALLE ÉTUDIANTS DAIDALLE ENSEIGNANTS DE FAMILLES DU PERSONNEL ATA LA SOLUTION FOURNIT L’INSTALLATION ET LA GESTION DE CÂBLAGE DÉDIÉ PAR L’INSTALLATION DE COMMUTATEURS DE GESTIONNAIRE ET LA CONFIGURATION DU POINT D’ACCÈS POE (French)
    24 December 2021
    0 references

    Identifiers