English | HOTEL TRICKS... A FAMILY! |
Project Q2183143 in Italy |
Statements
71,547.45 Euro
0 references
143,094.9 Euro
0 references
50.0 percent
0 references
26 October 2017
0 references
31 January 2019
0 references
30 July 2019
0 references
PAOLA S.N.C. DI MARAFON MICHELANGELO E C.
0 references
IL PROGETTO PREVEDE IN SINTESI UN AUMENTO VOLUMETRICO DI 15.86 MQ. DELLA SALA RISTORANTE, CHE SI PROTRARRA' VERSO VIA LUIGI DAL MORO IN ALLINEAMENTO AI CORPI DI FABBRICA LIMITROFI, IL COMPLETAMENTO DELL' INGRESSO ALL'HOTEL AL PIANO TERRA SU VIA LUIGI DAL MORO E LA REALIZZAZIONE DEL VANO ASCENSORE, MODIFICHE INTERNE ALLO SCHEMA DISTRIBUTIVO, IL RIFACIMENTO DEL TETTO SUL CORPO RIVOLTO A SUD E, PER LA SOLA PARTE DI FABBRICATO A NORD, SI REALIZZERA' IN SOPRAELEVAZIONE UN NUOVO VOLUME CON INCREMENTO DELLA S.U. DI MQ. 74.76 IN COERENZA CON QUANTO GIA' PREVISTO DAL PROGETTO ORIGINARIO PER UN TOTALE DI AUMENTO DELLA S.U COMPLESSIVA DI PROGETTO PARI A MQ. 95.45 OVVERO INFERIORE DI 65.18 MQ RISPETTO AI 160.63 MQ. DI AMPLIAMENTO. (Italian)
0 references
THE PROJECT WILL SUMMARISE A VOLUMETRIC INCREASE OF 15.86 SQM. THE RESTAURANT IN THE RESTAURANT, WHICH WILL EXTEND TO LUIGI FROM MORO IN ALIGNMENT WITH NEIGHBOURING FACTORY BODIES, THE COMPLETION OF THE ENTRANCE TO THE HOTEL ON THE GROUND ON VIA LUIGI FROM MORO AND THE CONSTRUCTION OF THE LIFT, INTERNAL CHANGES TO THE DISTRIBUTION SCHEME, THE LIFTING OF THE CEILING ON THE BODY FACING SOUTH AND, ONLY FOR THE PART OF THE BUILDING IN THE NORTH, A NEW VOLUME IS CARRIED OUT WITH AN INCREASE OF S.U. OF SQM. 74.76 IN LINE WITH WHAT IS ALREADY FORESEEN IN THE ORIGINAL DRAFT FOR A TOTAL INCREASE OF THE OVERALL PROJECT UNIT OF M² PER SQUARE METRE. 95.45 M OR LESS THAN 65.18 M², DOWN FROM 160.63 M². EXTENSION. (English)
0 references
LE PROJET PRÉVOIT UNE AUGMENTATION VOLUMÉTRIQUE DE 15,86 MÈTRES CARRÉS. DE LA SALLE DE RESTAURANT, QUI CONTINUERA VERS VIA LUIGI DAL MORO EN ALIGNEMENT AVEC LES BÂTIMENTS ADJACENTS, L’ACHÈVEMENT DE L’ENTRÉE DE L’HÔTEL AU REZ-DE-CHAUSSÉE SUR VIA LUIGI DAL MORO ET LA RÉALISATION DU COMPARTIMENT ASCENSEUR, DES MODIFICATIONS INTERNES AU SCHÉMA DE DISTRIBUTION, LA RÉNOVATION DU TOIT SUR LE CORPS ORIENTÉ SUD ET, POUR LA SEULE PARTIE DU BÂTIMENT AU NORD, UN NOUVEAU VOLUME AVEC UNE AUGMENTATION AUX ÉTATS-UNIS DE MÈTRES CARRÉS. 74,76 CONFORMÉMENT À CE QUI ÉTAIT DÉJÀ PRÉVU DANS LE PROJET INITIAL POUR UNE AUGMENTATION TOTALE DU PROJET AMÉRICAIN TOTAL DE M². 95.45 OU MOINS DE 65,18 MÈTRES CARRÉS PAR RAPPORT À 160,63 MÈTRES CARRÉS. EXTENSION. (French)
23 December 2021
0 references
HET PROJECT VOORZIET IN EEN VOLUMETRISCHE TOENAME VAN 15,86 VIERKANTE METER. VAN DE RESTAURANTRUIMTE, DIE VIA LUIGI DAL MORO IN LIJN ZAL BLIJVEN MET DE AANGRENZENDE GEBOUWEN, DE VOLTOOIING VAN DE INGANG VAN HET HOTEL OP DE BEGANE GROND VIA LUIGI DAL MORO EN DE REALISATIE VAN HET LIFTCOMPARTIMENT, INTERNE AANPASSINGEN AAN DE DISTRIBUTIEREGELING, DE RENOVATIE VAN HET DAK OP HET LICHAAM OP HET ZUIDEN EN, VOOR HET ENIGE DEEL VAN HET GEBOUW NAAR HET NOORDEN, EEN NIEUW VOLUME MET EEN TOENAME IN DE VS VAN VIERKANTE METER ZAL WORDEN GEREALISEERD. 74,76 IN LIJN MET WAT REEDS WAS VOORZIEN IN HET OORSPRONKELIJKE PROJECT VOOR EEN TOTALE STIJGING VAN HET TOTALE AMERIKAANSE PROJECT VAN M². 95,45 OF MINDER VAN 65,18 VIERKANTE METER IN VERGELIJKING MET 160,63 VIERKANTE METER. VERLENGING. (Dutch)