TRINCERONE EST (Q2023321)

From EU Knowledge Graph
Revision as of 00:21, 24 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q2023321 in Italy
Language Label Description Also known as
English
TRINCERONE EST
Project Q2023321 in Italy

    Statements

    0 references
    4,763,864.55 Euro
    0 references
    6,351,819.4 Euro
    0 references
    75.0 percent
    0 references
    4 August 2006
    0 references
    2 November 2018
    0 references
    COMUNE DI SALERNO
    0 references
    0 references
    0 references

    40°40'49.30"N, 14°45'34.02"E
    0 references
    L'INTERVENTO PROGETTUALE IN QUESTIONE SI CONFIGURA COME LOGICA PROSECUZIONE DELLA COPERTURA DELLA TRINCEA FERROVIARIA OGGI ESISTENTE, FINALIZZATO A DOTARE IL CENTRO CITTADINO DI ULTERIORI SPAZI RISERVATI AI PEDONI, RICUCIRE LE MAGLIE DELLA RETE VIARIA OVE INTERROTTE PER LA PRESENZA DELLA TRINCEA FERROVIARIA, E REALIZZARE UN EFFICACE COLLEGAMENTO FRA IL CENTRO CITTADINO E LA VIABILITà DI SCORRIMENTO, CON CONSEGUENTE RIDUZIONE DEI VOLUMI DI TRAFFICO.LA REALIZZAZIONE DI UN'OPERA INFRASTRUTTURALE, COMPLESSA E ARTICOLATA COME QUELLA IN OGGETTO, PRESENTA PROBLEMATICHE CARATTERIZZATE DA ELEVATI E COMPLESSI VALORI FUNZIONALI, SOCIALI ED URBANISTICI (Italian)
    0 references
    THE PROJECT IN QUESTION IS A LOGICAL CONTINUATION OF THE EXISTING RAIL TRENCH COVERAGE WHICH IS NOW IN PLACE, WITH THE AIM OF PROVIDING THE TOWN CENTRE WITH ADDITIONAL AREAS RESERVED FOR PEDESTRIANS, WHICH BREAKS DOWN THE AREAS OF THE ROAD NETWORK, WHERE IT IS STOPPED BECAUSE OF THE RAIL TRENCH, AND TO ESTABLISH AN EFFECTIVE LINK BETWEEN THE CITY CENTRE AND THE VIABILITS OF THE FLOW, WITH A CONSEQUENT REDUCTION IN THE VOLUMES OF TRAFFICO.LA’S CONSTRUCTION OF AN INFRASTRUCTURE, COMPLEX AND COMPLEX, SUCH AS THE ONE IN QUESTION, CHARACTERISED BY HIGH AND COMPLEX FUNCTIONAL, SOCIAL AND URBAN VALUES. (English)
    0 references
    LE PROJET EN QUESTION S’INSCRIT DANS LA CONTINUITÉ LOGIQUE DE LA COUVERTURE DE LA TRANCHÉE FERROVIAIRE EXISTANTE, QUI VISE À DOTER LE CENTRE-VILLE D’ESPACES SUPPLÉMENTAIRES RÉSERVÉS AUX PIÉTONS, À COUDRE LES LIAISONS DU RÉSEAU ROUTIER OÙ ELLE EST INTERROMPUE EN RAISON DE LA PRÉSENCE DE LA TRANCHÉE FERROVIAIRE, ET À CRÉER UNE CONNEXION EFFICACE ENTRE LE CENTRE-VILLE ET LE PASSAGE, CE QUI ENTRAÎNE UNE RÉDUCTION DES VOLUMES DE TRAFFICO.LA CONSTRUCTION D’UNE INFRASTRUCTURE COMPLEXE ET ARTICULÉE COMME CELLE EN QUESTION PRÉSENTE DES PROBLÈMES CARACTÉRISÉS PAR DES VALEURS FONCTIONNELLES, SOCIALES ET URBAINES ÉLEVÉES ET COMPLEXES. (French)
    14 December 2021
    0 references
    HET PROJECT IN KWESTIE IS EEN LOGISCHE VOORTZETTING VAN DE DEKKING VAN DE BESTAANDE GEUL, GERICHT OP HET UITRUSTEN VAN HET STADSCENTRUM MET EXTRA RUIMTES VOOR VOETGANGERS, HET NAAIEN VAN DE VERBINDINGEN VAN HET WEGENNET WAAR HET WORDT ONDERBROKEN DOOR DE AANWEZIGHEID VAN DE SPOORWEGSLEUF, EN HET TOT STAND BRENGEN VAN EEN EFFECTIEVE VERBINDING TUSSEN HET STADSCENTRUM EN DE DOORGANG, WAT RESULTEERT IN EEN VERMINDERING VAN DE VOLUMES VAN TRAFFICO. DE AANLEG VAN EEN INFRASTRUCTUUR, COMPLEX EN GEARTICULEERD ALS HET ONDERHAVIGE, LEVERT PROBLEMEN OP DIE WORDEN GEKENMERKT DOOR HOGE EN COMPLEXE FUNCTIONELE, SOCIALE EN STEDELIJKE WAARDEN. (Dutch)
    23 December 2021
    0 references
    DAS FRAGLICHE PROJEKT IST EINE LOGISCHE FORTSETZUNG DER ABDECKUNG DES BESTEHENDEN EISENBAHNGRABENS, DAS DARAUF ABZIELT, DAS STADTZENTRUM MIT ZUSÄTZLICHEN RÄUMEN FÜR FUSSGÄNGER AUSZUSTATTEN, DIE VERBINDUNGEN DES STRASSENNETZES ZU NÄHEN, WO ER DURCH DAS VORHANDENSEIN DES EISENBAHNGRABENS UNTERBROCHEN WIRD, UND EINE EFFEKTIVE VERBINDUNG ZWISCHEN DEM STADTZENTRUM UND DEM DURCHGANG HERZUSTELLEN, WAS ZU EINER VERRINGERUNG DES VOLUMENS VON TRAFFICO FÜHRT. (German)
    24 December 2021
    0 references

    Identifiers

    I56G08000210006
    0 references