SEISMIC ADAPTATION, CURRENT RULES ON SAFETY, FIRE, ARCHITECTURAL BARRIERS — CHILDREN OF VIA PROITI (Q2077639)
Jump to navigation
Jump to search
Project Q2077639 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | SEISMIC ADAPTATION, CURRENT RULES ON SAFETY, FIRE, ARCHITECTURAL BARRIERS — CHILDREN OF VIA PROITI |
Project Q2077639 in Italy |
Statements
232,500.0 Euro
0 references
310,000.0 Euro
0 references
75.0 percent
0 references
2 January 2014
0 references
10 August 2017
0 references
7 June 2018
0 references
COMUNE DI MARATEA
0 references
ESSENDO IL COMUNE DI MARATEA CLASSIFICATO QUALE ZONA SISMICA DI II CATEGORIA , L'NTERVENTO DI CONSOLIDAMENTO ED ADEGUAMENTO SISMICO, DEL COMPLESSO IMMOBILIARE E' FINALIZZATO ALLA REALIZZAZIONE DI UN ORGANISMO STRUTTURALE CAPACE DI ASSORBIRE LE SOLLECITAZIONI SISMICHE DI CALCOLO PREVISTE DALLA NORMATIVA VIGENTE PER LE ZONE SISMICHE DI DETTA CATEGORIA . PER IL PRIMO STRALCIO E' STATA ADEGUATA LA STRUTTURA DI FONDAZIONE, MENTRE PER IL SECONDO STRALCIO GLI INTERVENTI REALIZZATI HANNO NTERESSATO LE STRUTTURE MURARIE ED IL RIFACIMENTO INTEGRALE DELLA COPERTURA . IL PRESENTE PROGETTO 3¿ STRALCIO CONSISTE NELLA REALIZZAZIONE DEI SEGUENTI INTERVENTI :SISTEMA A CAPPOTTO+REALIZZAZIONE DI VESPAIO AREATO+REALIZZAZIONE DI TRAMEZZATURA DI MATTONI POSTI IN FOGLIO+RINZAFFO CON MALTA CEMENTIZIA DEI MURI ESTERNI SULLA FACCIA INTERNA A COPERTURA DELLA RETE ELETTROSALDATA GI¿ POSTA IN OPERA+REALIZZAZIONE DELL'IMPIANTO ELETTRICO E DI MESSA A TERRA DELL'IMMOBILE+REALIZZAZIONE DI UNA NUOVA CENTRALE TERMIC (Italian)
0 references
SINCE THE MUNICIPALITY OF MARATEA IS CLASSIFIED AS THE SEISMIC AREA OF CATEGORY II, THE NTERWIND OF CONSOLIDATION AND SEISMIC UPGRADING OF THE BUILDINGS COMPLEX IS AIMED AT THE ESTABLISHMENT OF A STRUCTURAL BODY CAPABLE OF ABSORBING THE SEISMIC STRESSES IN THE CALCULATION PROVIDED FOR BY THE LEGISLATION IN FORCE FOR EARTHQUAKE ZONES IN THAT CATEGORY. FOR THE FIRST PHASE, THE STRUCTURE OF THE FOUNDATION WAS ADAPTED, WHEREAS, FOR THE SECOND PART, THE WORK CARRIED OUT WAS THE BUILDING STRUCTURES AND THE COMPLETE REFURBISHMENT OF THE COVER. PROJECT 3 III — EXTRACT CONSISTING OF THE IMPLEMENTATION OF THE FOLLOWING OPERATIONS: CAPPING + IMPLEMENTATION OF THE SORPARTATE + REALISATION OF BRICKS CONTAINED IN SHEETS + RENDERINGS OR RENCEMENT OF EXTERNAL WALLS ON THE INNER SIDE ON THE INNER SIDE OF THE WELDED STEEL MESH TO BE CARRIED OUT + THE CONSTRUCTION OF THE ELECTRICAL INSTALLATION AND THE EARTHING OF THE BUILDING + CONSTRUCTION OF A NEW TERMIC POWER PLANT (English)
0 references
LA COMMUNE DE MARATEA ÉTANT CLASSÉE COMME ZONE SISMIQUE DE DEUXIÈME CLASSE, LE BUT DE LA CONSOLIDATION ET DE L’AJUSTEMENT SISMIQUE DU COMPLEXE DE CONSTRUCTION EST DE CRÉER UN CORPS STRUCTUREL CAPABLE D’ABSORBER LES CHARGES SISMIQUES DE CALCUL REQUISES PAR LA LÉGISLATION EN VIGUEUR POUR LES ZONES SISMIQUES DE CETTE CATÉGORIE. POUR LE PREMIER EXTRAIT, LA STRUCTURE DE LA FONDATION A ÉTÉ ADAPTÉE, TANDIS QUE POUR LE SECOND, LES INTERVENTIONS RÉALISÉES ONT COUVERT LES MURS ET LA RECONSTRUCTION INTÉGRALE DU TOIT. LE PRÉSENT PROJET 3ÂSTRALCIO CONSISTE EN LA RÉALISATION DU INTERVENTI:SISTEMA SUIVANT POUR COUCHE+RÉALISATION DE VESPAIO AREATO+RÉALISATION DU CLOISONNEMENT DES BRIQUES PLACÉES DANS LA FEUILLE+RINZAFFO AVEC LA MALTE CIMENTAIRE DES PAROIS EXTÉRIEURES SUR LA FACE INTÉRIEURE POUR RECOUVRIR LE FILET ÉLECTROSOUDÉ GI’POSÉ EN FONCTIONNEMENT+RÉALISATION DU SYSTÈME ÉLECTRIQUE ET MISE À LA TERRE DU BÂTIMENT+RÉALISATION D’UNE NOUVELLE CENTRALE THERMIQUE (French)
16 December 2021
0 references
AANGEZIEN DE GEMEENTE MARATEA WORDT AANGEMERKT ALS EEN TWEEDERANGS SEISMISCHE ZONE, HEEFT DE CONSOLIDATIE EN SEISMISCHE AANPASSING VAN HET GEBOUWENCOMPLEX TOT DOEL EEN STRUCTUREEL LICHAAM TE CREËREN DAT IN STAAT IS DE SEISMISCHE REKENLASTEN TE ABSORBEREN DIE VEREIST ZIJN DOOR DE GELDENDE WETGEVING VOOR DE SEISMISCHE ZONES VAN DIE CATEGORIE. VOOR HET EERSTE FRAGMENT IS DE STRUCTUUR VAN DE STICHTING AANGEPAST, TERWIJL VOOR HET TWEEDE FRAGMENT DE UITGEVOERDE INTERVENTIES DE MUREN EN DE INTEGRALE WEDEROPBOUW VAN HET DAK HEBBEN BEDEKT. HET HUIDIGE 3ÂSTRALCIO PROJECT BESTAAT UIT DE REALISATIE VAN DE VOLGENDE INTERVENTI:SISTEMA OM COAT+REALISATIE VAN VESPAIO AREATO+REALISATIE VAN HET PARTITIONEREN VAN BAKSTENEN GEPLAATST IN SHEET+RINZAFFO MET CEMENTACHTIG MALTA VAN DE BUITENMUREN AAN DE BINNENKANT OM HET ELEKTROGELASTE NET GIÂ’IN BEDRIJF TE DEKKEN+REALISATIE VAN HET ELEKTRISCHE SYSTEEM EN AARDING VAN HET GEBOUW+REALISATIE VAN EEN NIEUWE THERMISCHE CENTRALE (Dutch)
23 December 2021
0 references
Identifiers
I23J13000790008
0 references