METRE CAGLIARI — DOUBLING OF CARACALLA — L. GENNARI + COMPLETION AND UPGRADING OF STOPS, STATIONS, TRACK-SIDE SIGNALLING NETWORK OF ALL EXISTING LINES AND CRMS (Q2052465)

From EU Knowledge Graph
Revision as of 17:16, 23 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
Jump to navigation Jump to search
Project Q2052465 in Italy
Language Label Description Also known as
English
METRE CAGLIARI — DOUBLING OF CARACALLA — L. GENNARI + COMPLETION AND UPGRADING OF STOPS, STATIONS, TRACK-SIDE SIGNALLING NETWORK OF ALL EXISTING LINES AND CRMS
Project Q2052465 in Italy

    Statements

    0 references
    4,250,000.0 Euro
    0 references
    8,500,000.0 Euro
    0 references
    50.0 percent
    0 references
    1 November 2000
    0 references
    20 November 2021
    0 references
    ARST S.P.A.
    0 references
    0 references
    0 references

    39°13'1.02"N, 9°6'46.26"E
    0 references
    IL PROGETTO CONSISTE NEL RADDOPPIO DEL BINARIO NELLA TRATTA REPUBBLICA - CARACALLA DELLA METROPOLITANA DI CAGLIARI E NELL'ADEGUAMENTO DELLE FERMATE (BANCHINE) E DEL DEPOSITO (CRM) DI MONSERRATO, IN PREVISIONE DELL'UTILIZZO DI VEICOLI TRANVIARI CON MAGGIORE CAPACITà DI TRASPORTO E MAGGIORE LUNGHEZZA. IL PROGETTO INCLUDE ALTRESì L'ESTENSIONE E LA RIQUALIFICAZIONE DEGLI AMBITI ATTIGUI ALLE FERMATE, IN PARTICOLARE DI QUELLE SOTTOSTANTI IL VIADOTTO SAN GOTTARDO-POLICLINICO. (Italian)
    0 references
    THE PROJECT CONSISTS OF DOUBLING THE TRACK IN THE REPUBLIC OF CAGLIARI — CARACALLA OF THE CAGLIARI METRO AND IN THE ADAPTATION OF STOPS (DOCKS) AND OF THE STORAGE (CRM) WAREHOUSE IN MONADE IN VIEW OF THE USE OF TRAM VEHICLES WITH GREATER TRANSPORT CAPACITY AND GREATER LENGTH. THE PROJECT WILL INCLUDE THE EXTENSION AND UPGRADING OF THE AREAS ADJACENT TO THE STOPS, IN PARTICULAR THOSE UNDERLYING THE VIADUCT SAN GOTTARDO-POLINICO. (English)
    0 references
    LE PROJET CONSISTE EN LE DOUBLEMENT DE LA VOIE DANS LE TRONÇON REPUBBLICA — CARACALLA DU MÉTRO DE CAGLIARI ET DANS L’ADAPTATION DES ARRÊTS (BANQUES) ET DE L’ENTREPÔT (CRM) DE MONSERRATO, EN PRÉVISION DE L’UTILISATION DE VÉHICULES DE TRAMWAY À PLUS GRANDE CAPACITÉ DE TRANSPORT ET PLUS LONGUE DURÉE. LE PROJET COMPREND ÉGALEMENT L’EXTENSION ET LE RÉAMÉNAGEMENT DES ZONES ADJACENTES AUX ARRÊTS, EN PARTICULIER CELLES SITUÉES EN DESSOUS DU VIADUC DE SAN GOTTARDO-POLICLINICO. (French)
    16 December 2021
    0 references
    HET PROJECT BESTAAT UIT DE VERDUBBELING VAN HET SPOOR IN HET TRAJECT REPUBBLICA — CARACALLA VAN DE METRO VAN CAGLIARI EN IN DE AANPASSING VAN DE HALTES (BANKEN) EN HET MAGAZIJN (CRM) VAN MONSERRATO, IN AFWACHTING VAN HET GEBRUIK VAN TRAMVOERTUIGEN MET EEN GROTERE TRANSPORTCAPACITEIT EN EEN LANGERE LENGTE. HET PROJECT OMVAT OOK DE UITBREIDING EN HERONTWIKKELING VAN DE AAN DE HALTES GRENZENDE GEBIEDEN, MET NAME DIE ONDER HET VIADUCT SAN GOTTARDO-POLICLINICO. (Dutch)
    23 December 2021
    0 references

    Identifiers