SMART GRID PRIMARY CAB PROJECT - Q2017760 (Q2017760)

From EU Knowledge Graph
Revision as of 20:58, 22 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
Jump to navigation Jump to search
Project Q2017760 in Italy
Language Label Description Also known as
English
SMART GRID PRIMARY CAB PROJECT - Q2017760
Project Q2017760 in Italy

    Statements

    0 references
    2,131,396.01 Euro
    0 references
    2,885,101.28 Euro
    0 references
    73.88 percent
    0 references
    26 March 2018
    0 references
    31 December 2020
    0 references
    E-DISTRIBUZIONE SPA
    0 references

    37°16'20.32"N, 15°7'34.75"E
    0 references
    IL PROGETTO COMPRENDE INTERVENTI SIA DI STRUTTURA CHE DI IMPLEMENTAZIONE DELLE FUNZIONALITà SMART GRID. GLI INTERVENTI STRUTTURALI MIRANO A MODIFICARE LA CONFIGURAZIONE DELL'IMPIANTO AL FINE DI MIGLIORARNE LE CONDIZIONI DI ESERCIZIO E LE PRESTAZIONI.IL PROGETTO PREVEDE L'UTILIZZO DI DISPOSITIVI DI ULTIMA GENERAZIONE CHE PERMETTANO LA COMPLETA SMARTIZZAZIONE DELLA CABINA PRIMARIA E DELLE CABINE SECONDARIE SOTTESE. INOLTRE VERRANNO SOSTITUITE LE LINEE MT TRAMITE NUOVI CAVI IN ALLUMINIO E IN ALLUMINIO ELICORD.IL PROGETTO SI QUALIFICA COME SMART GRID IN QUANTO PREVEDE L'INSTALLAZIONE DI DISPOSITIVI TECNOLOGICI E DI APPARECCHIATURE INTELLIGENTI FINALIZZATE AD UNA GESTIONE EVOLUTA DELLA RETE ELETTRICA, CON L'OBIETTIVO DI AGEVOLARE L'INCREMENTO DELLA QUOTA DI FABBISOGNO ENERGETICO COPERTO DA GENERAZIONE DISTRIBUITA DA FONTI RINNOVABILI. IN TAL SENSO SI IMPLEMENTANO LE SEGUENTI FUNZIONALITà SMART:-SELETTIVITà LOGICA DEL TRONCO GUASTO-OSSERVABILITà DELLA RETE MT-CONTROLLO EVOLUTO DI TENSION (Italian)
    0 references
    THE PROJECT COMPRISES BOTH STRUCTURAL AND OPERATIONAL MEASURES FOR SMART GRIDS. THE PURPOSE OF THE STRUCTURAL MEASURES IS TO CHANGE THE DESIGN OF THE PLANT IN ORDER TO IMPROVE THE CONDITIONS FOR OPERATION AND TO IMPROVE THE DESIGN OF THE INSTALLATION. THE DESIGN OF THE INSTALLATION SHALL CONSIST OF THE USE OF STATE-OF-THE-ART DEVICES ENABLING THE COMPLETE SMARTISATION OF THE PRIMARY CABIN AND THE UNDERLYING CABS. IN ADDITION, THE MT LINES WILL BE REPLACED BY NEW ALUMINIUM AND ALUMINIUM WIRE CABLES. THIS PROJECT QUALIFIES AS SMART GRIDS FOR THE INSTALLATION OF SMART TECHNOLOGY DEVICES AND APPLIANCES FOR THE IMPROVED MANAGEMENT OF THE ELECTRICITY GRID, WITH THE AIM OF FACILITATING THE INCREASE IN THE SHARE OF ENERGY DEMAND COVERED BY GENERATION FROM RENEWABLE SOURCES. IN THIS RESPECT, THE FOLLOWING FEATURES ARE USED AS A TOOL FOR SMART: — ATTRIBUTE TO THE UASTO-ROBSERVABILITY TRUNK OF THE MT-SURVEILLANCE NETWORK OF TENSION (English)
    0 references
    LE PROJET COMPREND À LA FOIS LA STRUCTURE ET LA MISE EN ŒUVRE DE FONCTIONNALITÉS DE RÉSEAU INTELLIGENT. LES INTERVENTIONS STRUCTURELLES VISENT À MODIFIER LA CONFIGURATION DU SYSTÈME AFIN D’AMÉLIORER LES CONDITIONS DE FONCTIONNEMENT ET LES PRESTATIONS.LE PROJET PRÉVOIT L’UTILISATION D’APPAREILS DE DERNIÈRE GÉNÉRATION QUI PERMETTENT L’INTELLIGENCE COMPLÈTE DE LA CABINE PRIMAIRE ET DES CABINES SECONDAIRES CI-DESSOUS. EN OUTRE, LES LIGNES MT SERONT REMPLACÉES PAR DE NOUVELLES LIGNES ELICORD ALUMINIUM ET ALUMINIUM CABLES.LE PROJET EST QUALIFIÉ DE RÉSEAU INTELLIGENT CAR IL PRÉVOIT L’INSTALLATION D’APPAREILS TECHNOLOGIQUES ET D’ÉQUIPEMENTS INTELLIGENTS DESTINÉS À UNE GESTION AVANCÉE DU RÉSEAU ÉLECTRIQUE, DANS LE BUT DE FACILITER L’AUGMENTATION DE LA PART DES BESOINS ÉNERGÉTIQUES COUVERTS PAR LA PRODUCTION DISTRIBUÉE À PARTIR DE SOURCES RENOUVELABLES. EN CE SENS, LES FONCTIONS INTELLIGENTES SUIVANTES SONT MISES EN ŒUVRE:-SELETTIVITY LOGIQUE DE L’OBSERVABILITÉ DU TRONC DÉFECTUEUX DU RÉSEAU DE TENSION MT-CONTROL AVANCÉ (French)
    14 December 2021
    0 references
    HET PROJECT OMVAT ZOWEL DE STRUCTUUR ALS DE IMPLEMENTATIE VAN SLIMME NETWERKFUNCTIES. DE STRUCTURELE INTERVENTIES ZIJN BEDOELD OM DE CONFIGURATIE VAN HET SYSTEEM TE WIJZIGEN OM DE BEDRIJFSOMSTANDIGHEDEN TE VERBETEREN EN HET PROJECT PRESTATIONS.THE VOORZIET IN HET GEBRUIK VAN DE NIEUWSTE GENERATIE APPARATEN DIE DE VOLLEDIGE SLIMMER MAKEN VAN DE PRIMAIRE CABINE EN DE SECUNDAIRE CABINES HIERONDER. BOVENDIEN ZULLEN DE MT-LIJNEN WORDEN VERVANGEN DOOR NIEUW ELICORD-ALUMINIUM EN ALUMINIUM CABLES.THE-PROJECT KWALIFICEERT ALS SLIM NET OMDAT HET VOORZIET IN DE INSTALLATIE VAN TECHNOLOGISCHE APPARATUUR EN INTELLIGENTE APPARATUUR VOOR EEN GEAVANCEERD BEHEER VAN HET ELEKTRICITEITSNET, MET ALS DOEL DE TOENAME VAN HET AANDEEL VAN ENERGIEBEHOEFTEN DIE WORDEN GEDEKT DOOR OPWEKKING UIT HERNIEUWBARE BRONNEN TE VERGEMAKKELIJKEN. IN DEZE ZIN WORDEN DE VOLGENDE SLIMME FUNCTIES GEÏMPLEMENTEERD:-SELETTIVITY LOGICA VAN DE DEFECTE ROMP-WAARNEMING VAN HET GEAVANCEERDE MT-CONTROL NETWERK VAN SPANNING (Dutch)
    22 December 2021
    0 references

    Identifiers

    F71F18000000006
    0 references