Requalification of the School Park – 2nd Phase (Q2881910)

From EU Knowledge Graph
Revision as of 09:13, 19 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
Jump to navigation Jump to search
Project Q2881910 in Portugal
Language Label Description Also known as
English
Requalification of the School Park – 2nd Phase
Project Q2881910 in Portugal

    Statements

    0 references
    277,315.0 Euro
    0 references
    554,630.0 Euro
    0 references
    50.0 percent
    0 references
    1 June 2017
    0 references
    14 January 2019
    0 references
    MUNICIPIO DE SETUBAL
    0 references
    0 references

    38°31'25.39"N, 8°55'47.71"W
    0 references
    Considerando a realidade do Parque Escolar concelhio torna-se imprescindível a realização de intervenções a nível de reabilitação das infraestruturas, a reparação de infiltrações, fissuras, pinturas de tetos e paredes, a remodelação de cozinhas e refeitórios assim como de instalações sanitárias e a requalificação de espaços exteriores e campos de jogos. (Portuguese)
    0 references
    Considering the reality of the Municipal School Park, it is essential to carry out interventions in the level of infrastructure rehabilitation, the repair of infiltrations, cracks, ceiling and wall paintings, the remodeling of kitchens and cafeterias as well as sanitary facilities and the requalification of outdoor spaces and playing fields. (English)
    7 July 2021
    0 references
    Compte tenu de la réalité du parc scolaire Concelhio, il est essentiel de mener des interventions dans la réhabilitation des infrastructures, la réparation des infiltrations, des fissures, des peintures de plafonds et de murs, la rénovation des cuisines et des cafétérias ainsi que des installations sanitaires et la requalification des espaces extérieurs et des terrains de jeu. (French)
    5 December 2021
    0 references
    Angesichts der Realität des Concelhio Schulparks ist es wichtig, Eingriffe in die Sanierung der Infrastruktur, Reparatur von Infiltrationen, Rissen, Gemälden von Decken und Wänden, Umbau von Küchen und Cafeterien sowie Sanitäranlagen und die Neuqualifizierung von Außenräumen und Spielfeldern durchzuführen. (German)
    13 December 2021
    0 references
    Gezien de realiteit van het Concelhio School Park, is het essentieel om interventies uit te voeren in het herstel van infrastructuur, reparatie van infiltraties, scheuren, schilderijen van plafonds en muren, het verbouwen van keukens en cafetaria’s, evenals sanitaire voorzieningen en de herkwalificatie van buitenruimtes en speelterreinen. (Dutch)
    19 December 2021
    0 references
    Setúbal, União das freguesias de Setúbal (São Julião, Nossa Senhora da Anunciada e Santa Maria da Graça)
    0 references

    Identifiers

    LISBOA-07-5673-FEDER-000037
    0 references