Structuring of the Urban Corridor Av. of the Entrepreneur – Business Location Area, for public transport and bicycles (Q2878152)

From EU Knowledge Graph
Revision as of 22:31, 18 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
Jump to navigation Jump to search
Project Q2878152 in Portugal
Language Label Description Also known as
English
Structuring of the Urban Corridor Av. of the Entrepreneur – Business Location Area, for public transport and bicycles
Project Q2878152 in Portugal

    Statements

    0 references
    747,000.0 Euro
    0 references
    878,824.0 Euro
    0 references
    85.0 percent
    0 references
    10 February 2017
    0 references
    31 October 2019
    0 references
    MUNICIPIO DE CASTELO BRANCO
    0 references

    39°49'35.87"N, 7°29'30.95"W
    0 references
    Com a presente operação pretende-se proceder à construção do corredor urbano de elevada procura, entre a Av. do Empresário e a Rua A da Área de Localização Empresarial, de modo a criar condições para a redução da emissão de gases com efeitos de estufa, devido à redução das distâncias e dos tempos de percurso, contribuindo para a melhoria da rede de interface articulando rodovias e ciclovias. (Portuguese)
    0 references
    With this operation it is intended to proceed to the construction of the urban corridor of high demand, between Av. do Empresário and Rua A of the Area of Business Location, in order to create conditions for reducing the emission of greenhouse gases, due to the reduction of distances and journey times, contributing to the improvement of the interface network linking motorways and bike paths. (English)
    7 July 2021
    0 references
    Cette opération vise à construire le corridor urbain à forte demande, entre Av. do Entrepreneur et Rua A de la zone d’activité, afin de créer des conditions pour la réduction des émissions de gaz à effet de serre, en raison de la réduction des distances et des temps de trajet, contribuant à l’amélioration du réseau d’interface articulant les routes et les pistes cyclables. (French)
    4 December 2021
    0 references
    Diese Operation zielt darauf ab, den städtischen Korridor der hohen Nachfrage zwischen Av. do Entrepreneur und Rua A des Business Location Area zu bauen, um die Bedingungen für die Verringerung der Treibhausgasemissionen zu schaffen, da die Entfernungen und Fahrtzeiten reduziert werden, und trägt zur Verbesserung des Schnittstellennetzes bei, das Straßen und Radwege artikuliert. (German)
    13 December 2021
    0 references
    Deze operatie is gericht op de aanleg van de stedelijke corridor van grote vraag, tussen Av. do Entrepreneur en Rua A van de Business Location Area, om voorwaarden te scheppen voor de vermindering van de uitstoot van broeikasgassen, als gevolg van de vermindering van afstanden en reistijden, bij te dragen aan de verbetering van het interfacenetwerk dat wegen en fietspaden belicht. (Dutch)
    18 December 2021
    0 references
    Castelo Branco, Castelo Branco
    0 references

    Identifiers

    CENTRO-09-1406-FEDER-000025
    0 references