Rehabilitation of the Corunheiro Bridge with creation of pedestrian access (Q2863244)

From EU Knowledge Graph
Revision as of 18:06, 18 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
Jump to navigation Jump to search
Project Q2863244 in Portugal
Language Label Description Also known as
English
Rehabilitation of the Corunheiro Bridge with creation of pedestrian access
Project Q2863244 in Portugal

    Statements

    0 references
    170,000.0 Euro
    0 references
    200,000.0 Euro
    0 references
    85.0 percent
    0 references
    3 November 2015
    0 references
    31 December 2017
    0 references
    MUNICIPIO DE MOURA
    0 references
    0 references

    38°9'32.11"N, 7°26'44.95"W
    0 references
    A intervenção proposta, localizada aproximadamente ao km 098+790 da Estrada Nacional 255, pretende realizar a reabilitação da Ponte do Corunheiro com substituição do tabuleiro e alargamento para introdução de zona de circulação pedonal. (Portuguese)
    0 references
    The proposed intervention, located approximately km 098+ 790 of the National Road 255, intends to carry out the rehabilitation of the Corunheiro Bridge with replacement of the board and enlargement for the introduction of pedestrian circulation zone. (English)
    6 July 2021
    0 references
    L’intervention proposée, située à environ 098+ 790 de la route nationale 255, vise à réhabiliter le pont de Corunheiro avec le remplacement de la planche et l’agrandissement pour introduire une zone de circulation piétonne. (French)
    4 December 2021
    0 references
    Mit der vorgeschlagenen Maßnahme, die etwa Kilometer 098+ 790 der Nationalstraße 255 beträgt, soll die Corunheiro-Brücke durch Ersatz des Boards und der Erweiterung zur Einführung einer Fußgängerzone rehabilitiert werden. (German)
    13 December 2021
    0 references
    De voorgestelde interventie, die ongeveer km 098+ 790 van de nationale weg 255 ligt, is bedoeld om de Corunheirobrug te rehabiliteren met vervanging van het bestuur en uitbreiding tot de invoering van een voetgangersgebied. (Dutch)
    18 December 2021
    0 references
    Moura, União das freguesias de Moura (Santo Agostinho e São João Baptista) e Santo Amador
    0 references

    Identifiers

    ALT20-04-1406-FEDER-000013
    0 references