Implementation of innovative sheet bending technologies in the production plant STAKOM Sp. z o.o. with its registered office in Tuchomi Street. Lipowa 9 to the production process of sports fields Implementation will result in : — limiting the material and energy intensity of the process of folding of sheets, – shortening the duration of the operation of bending of sheets, – limiting (Q120870)

From EU Knowledge Graph
Revision as of 12:13, 17 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
Jump to navigation Jump to search
Project Q120870 in Poland
Language Label Description Also known as
English
Implementation of innovative sheet bending technologies in the production plant STAKOM Sp. z o.o. with its registered office in Tuchomi Street. Lipowa 9 to the production process of sports fields Implementation will result in : — limiting the material and energy intensity of the process of folding of sheets, – shortening the duration of the operation of bending of sheets, – limiting
Project Q120870 in Poland

    Statements

    0 references
    860,000.0 zloty
    0 references
    206,400.0 Euro
    13 January 2020
    0 references
    2,000,000.0 zloty
    0 references
    480,000.0 Euro
    13 January 2020
    0 references
    43.0 percent
    0 references
    16 March 2017
    0 references
    30 September 2019
    0 references
    STAKOM SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references
    Projekt obejmuje zakup 1 środka trwałego: Prasy krawędziowej CNC pracującej na dwóch jednostkach gnących w tandemie - 1 szt. Projekt zostanie zrealizowany w ramach jednego zadania. Wdrożenie innowacyjnych technologii zaginania blach w zakładzie produkcyjnym STAKOM Sp. z o.o. z siedzibą w Tuchomiu przy ul. Lipowej 9 do procesu produkcji boisk sportowych Wdrożenie będzie skutkować: - ograniczeniem materiało i energochłonności procesu zabinania blach, - skróceniem czasu realizowanych operacji zaginania blach, - ograniczeniem operacji emitujących zanieczyszczenie do środowiska. (Polish)
    0 references
    The project involves the purchase of 1 fixed assets: CNC press brake working on two bending units in tandem – 1 pcs. The project will be carried out as part of a single task. Implementation of innovative sheet bending technologies in the production plant STAKOM Sp. z o.o. with its registered office in Tuchomi Street. Lipowa 9 to the production process of sports fields Implementation will result in: — limiting the material and energy intensity of the process of fixing of sheets, – shortening the duration of the operation of bending of sheets, – limiting operations emitting pollution to the environment. (English)
    21 October 2020
    0 references
    Le projet implique l’achat d’une immobilisation: Frein de presse CNC travaillant sur deux unités de flexion en tandem — 1 pcs. Le projet sera réalisé dans le cadre d’une seule tâche. Mise en œuvre de technologies innovantes pour le pliage de tôle dans l’usine de production stakom Sp. z o.o. ayant son siège social à Tuchomi, ul. Leipzig 9 au processus de production des terrains de sport La mise en œuvre aboutira à: — réduction de l’intensité des matériaux et de l’énergie du processus de naufrage des tôles, — réduction du temps des opérations de flexion des tôles, — réduction des opérations émettant de la pollution pour l’environnement. (French)
    2 December 2021
    0 references
    Bei dem Projekt handelt es sich um den Erwerb von 1 Anlagegut: CNC-Pressebremse arbeitet an zwei Biegeeinheiten in Tandem – 1 Stück. Das Projekt wird im Rahmen einer einzigen Aufgabe durchgeführt. Einführung innovativer Technologien für die Blechfaltung in der Produktionsanlage stakom Sp. z o.o. mit Sitz in Tuchomi, ul. Leipzig 9 zum Produktionsprozess von Sportplätzen Die Umsetzung führt zu folgenden Ergebnissen: —Verringerung der Material- und Energieintensität des Blechversenkprozesses, – Verkürzung der Zeit der Blechbiegungen, – Verringerung von Vorgängen, die Umweltverschmutzung ausstoßen. (German)
    8 December 2021
    0 references
    Het project omvat de aankoop van 1 vaste activa: CNC drukrem werkend op twee buigende eenheden in tandem — 1 PCs. Het project zal worden uitgevoerd in het kader van één taak. Implementatie van innovatieve technologieën voor het vouwen van plaatwerk in de fabriek stakom Sp. z o.o. met maatschappelijke zetel te Tuchomi, ul. Leipzig 9 naar het productieproces van sportvelden De implementatie zal resulteren in: — het verminderen van het materiaal en de energie-intensiteit van het plaatwerk zinken proces, — het verminderen van de tijd van plaatmetaal buigen operaties, — het verminderen van operaties die vervuiling uitstoten naar het milieu. (Dutch)
    17 December 2021
    0 references

    Identifiers

    RPPM.02.02.01-22-0089/17
    0 references