(A19_075_2015_0750058_1063) ITALCOGE (Q2065921)

From EU Knowledge Graph
Revision as of 13:41, 16 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2065921 in Italy
Language Label Description Also known as
English
(A19_075_2015_0750058_1063) ITALCOGE
Project Q2065921 in Italy

    Statements

    0 references
    23,539.0 Euro
    0 references
    47,078.0 Euro
    0 references
    50.0 percent
    0 references
    14 March 2015
    0 references
    10 December 2018
    0 references
    14 March 2017
    0 references
    ITALFINISH S.R.L.
    0 references
    Q293071 (Deleted Item)
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    ITALCOGE ? UN PROGETTO DI EFFICIENTAMENTO ENERGETICO ATTRAVERSO L?INSTALLAZIONE DI UN COGENERATORE AD ALTO RENDIMENTO PRESSO LA ITALFINISH SRL, AZIENDA CHE SI OCCUPA DI TRATTAMENTI GALVANICI SU OGGETTI METALLICI. QUESTO TIPO DI ATTIVIT? ? FORTEMENTE ENERGIVORO SIA DAL PUNTO DI VISTA TERMICO CHE ELETTRICO. ATTUALMENTE L?AZIENDA SI APPROVVIGIONA ESCLUSIVAMENTE CON ENERGIA ELETTRICA, OLTRE ALLA PARTE DI ALIMENTAZIONE DI POMPE, VENTILATORI, ILLUMINAZIONE E CLIMATIZZAZIONE DEI LOCALI, ANCHE PER IL RISCALDAMENTO DELLE VASCHE DI PROCESSO. QUEST?ULTIMO FATTORE INCIDE PESANTEMENTE SUL BILANCIO ENERGETICO AZIENDALE, SOPRATTUTTO PER L?ALTO ?COSTO ENERGETICO? DATO DALLA CONVERSIONE DELL?ENERGIA ELETTRICA IN TERMICA ATTRAVERSO L?USO DI RESISTENZE ELETTRICHE. L?INTENTO DEL PROGETTO ? L?ABBATTIMENTO DEI CONSUMI ENERGETICI AZIENDALI VOLTO AD UN RISPARMIO IN TERMINI DI ENERGIA PRIMARIA, IN TERMINI ECONOMICI E SOPRATTUTTO IN TERMINI DI IMPATTO AMBIENTALE E DI SICUREZZA. ? PREVISTA L?INSTALLAZIONE DI UN (Italian)
    0 references
    ITALCOGE? AN ENERGY EFFICIENCY PROJECT THROUGH THE INSTALLATION OF A HIGH-PERFORMING COGENERATOR IN ITALFINISH SRL, AN ENERGY EFFICIENCY PROJECT ON METAL OBJECTS. DO YOU WORK THIS TYPE OF ACTIVITY? ? EITHER THERMALLY OR ELECTRICALLY. CURRENTLY, THE COMPANY IS SUPPLIED EXCLUSIVELY WITH ELECTRICITY, IN ADDITION TO THE SUPPLY OF PUMPS, FANS, LIGHTING AND AIR-CONDITIONING OF THE PREMISES, INCLUDING FOR THE HEATING OF THE PROCESS TANKS. DOES IT WEIGH HEAVILY ON THE COMPANY’S ENERGY BALANCE, IN PARTICULAR FOR L? WHAT IS THE HIGH ENERGY COST? THE CONVERSION OF ELECTRICITY INTO THERMAL ENERGY VIA THE USE OF ELECTRICAL RESISTORS. WHAT IS THE INTENTION OF THE PROJECT? THE REDUCTION OF FARM ENERGY CONSUMPTION, WHICH AIMS TO SAVE PRIMARY ENERGY, IN ECONOMIC TERMS AND IN PARTICULAR IN TERMS OF ENVIRONMENTAL AND SAFETY IMPACTS. ? INTENDED FOR THE INSTALLATION OF A (English)
    0 references
    ITALCOGE? UN PROJET D’EFFICACITÉ ÉNERGÉTIQUE GRÂCE À L’INSTALLATION D’UN COGÉNÉRATEUR HAUTE PERFORMANCE CHEZ ITALFINISH SRL, UNE SOCIÉTÉ QUI S’OCCUPE DES TRAITEMENTS GALVANIQUES SUR DES OBJETS MÉTALLIQUES. CE GENRE D’ACTIVITÉ? FORTEMENT ÉNERGÉTIQUE DU POINT DE VUE THERMIQUE ET ÉLECTRIQUE. ACTUELLEMENT, L’ENTREPRISE FOURNIT EXCLUSIVEMENT DE L’ÉLECTRICITÉ, EN PLUS DE LA FOURNITURE DE POMPES, VENTILATEURS, ÉCLAIRAGE ET CLIMATISATION DES PIÈCES, MÊME POUR LE CHAUFFAGE DES RÉSERVOIRS DE PROCÉDÉ. CE DERNIER FACTEUR A UN IMPACT IMPORTANT SUR LE BILAN ÉNERGÉTIQUE DE L’ENTREPRISE, NOTAMMENT EN RAISON DU COÛT ÉLEVÉ DE L’ÉNERGIE? DONNÉE PAR LA CONVERSION DE L’ÉNERGIE ÉLECTRIQUE EN ÉNERGIE THERMIQUE PAR L’UTILISATION DE RÉSISTANCES ÉLECTRIQUES. L’INTENTION DU PROJET? LA RÉDUCTION DE LA CONSOMMATION D’ÉNERGIE DES ENTREPRISES EN VUE D’ÉCONOMISER EN TERMES D’ÉNERGIE PRIMAIRE, EN TERMES ÉCONOMIQUES ET SURTOUT EN TERMES D’IMPACT ENVIRONNEMENTAL ET DE SÉCURITÉ. PROJETÉ L’INSTALLATION D’UN (French)
    16 December 2021
    0 references

    Identifiers