(A19_074_2015_0740020_1025) EEAMP; (Q2065816)

From EU Knowledge Graph
Revision as of 13:40, 16 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2065816 in Italy
Language Label Description Also known as
English
(A19_074_2015_0740020_1025) EEAMP;
Project Q2065816 in Italy

    Statements

    0 references
    50,505.15 Euro
    0 references
    101,010.29 Euro
    0 references
    50.0 percent
    0 references
    3 March 2015
    0 references
    31 July 2017
    0 references
    3 March 2017
    0 references
    ALBERGO ERCOLINI & SAVI SAS DI ARMENTO LUCIA & C
    0 references
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    L?INTERVENTO ANALIZZATO NELLA DIAGNOSI ENERGETICA ? UN INTERVENTO COMBINATO DI EFFICIENZA ENERGETICA E DI UTILIZZO DI ENERGIA RINNOVABILESI ? DECISO DI SOSTITUIRE L?IMPIANTO DI CLIMATIZZAZIONE ESISTENTE, AI PIANI PRIMO, SECONDO TERZO E QUARTO SAR? SOSTITUITO L?ATTUALE SISTEMA VRF CON UNO NUOVO AD ALTA EFFICIENZA E CON GAS FRIGORIGENO ECOLOGICO, AL PIANO TERRENO SARANNO SOSTITUITI DUE ASSORBITORI A GAS METANO PER LA CLIMATIZZAZIONE ESTIVA, MOLTO ENERGIVORI, CON UNA MACCHINA ELETTRICA ARIA/ACQUA AD ALTA EFFICIENZA.L?EDIFICIO IN OGGETTO ? DESTINATO AD ATTIVIT? DI TIPO RICETTIVO, ED ? IN PREVISIONE IL COMPLETO RIFACIMENTO DELL?IMPIANTO DI CLIMATIZZAZIONE ESTIVA ED INVERNALE.GLI IMPIANTI SARANNO INSERITI IN UN CONTESTO EDILIZIO ESISTENTE. IN TALE CONTESTO EDILIZIO SARANNO INSERITI I NUOVI IMPIANTI DI CUI AL PRESENTE PROGETTO, E PRECISAMENTE: A) IMPIANTO DI RISCALDAMENTO E RAFFRESCAMENTO AD ESPANSIONE DIRETTA E FLUSSO DI REFRIGERANTE VARIABILE, CON UNIT? INTERNE PREVALENTEMENTE A PARERE, A S (Italian)
    0 references
    L? INTERVENTION ANALYSED IN ENERGY DIAGNOSIS? A COMBINED ENERGY EFFICIENCY AND ENERGY USE EFFICIENCY IN THE RINNOVABESI? HAVE YOU DECIDED TO REPLACE THE EXISTING AIR-CONDITIONING SYSTEM, THE FIRST, SECOND AND FOURTH SAR PLANS? REPLACED L? THE CURRENT VRF SYSTEM WITH A NEW HIGH EFFICIENCY, AND WITH CLEAN REFRIGERANT GAS, THE LAND FLOOR WILL BE REPLACED BY TWO GAS SUPPLIERS FOR SUMMER COOLING, HIGHLY ENERGY-INTENSIVE, WITH AN ELECTRICITY-INTENSIVE AIR/WATER MACHINE (EFISENZA.L)? INTENDED TO DO SO? RECEPTIVE, AND? IN VIEW OF THE COMPLETE REFURBISHMENT OF THE AIR-CONDITIONING SYSTEM IN SUMMER, AND INVERNALE.GLI INSTALLATIONS WILL BE INCLUDED IN AN EXISTING BUILDING ENVIRONMENT. IN THIS BUILDING CONTEXT, THE NEW INSTALLATIONS COVERED BY THIS PROJECT WILL BE INCLUDED, NAMELY: (A) DIRECT EXPANSION HEATING AND COOLING SYSTEM AND VARIABLE COOLING FLOW WITH UNIT? INTERNALLY, TO S (English)
    0 references
    L’INTERVENTION ANALYSÉE DANS L’AUDIT ÉNERGÉTIQUE? UNE INTERVENTION COMBINÉE DE L’EFFICACITÉ ÉNERGÉTIQUE ET DE LA CONSOMMATION D’ÉNERGIE RINNOVABILESI? A DÉCIDÉ DE REMPLACER LE SYSTÈME DE CLIMATISATION EXISTANT, SUR LES PREMIÈRE, DEUXIÈME ET QUATRIÈME RAS? REMPLACÉ LE SYSTÈME VRF ACTUEL PAR UN NOUVEAU SYSTÈME DE HAUTE EFFICACITÉ ET DE GAZ FROID ÉCOLOGIQUE, AU REZ-DE-CHAUSSÉE SERONT REMPLACÉS DEUX ABSORBEURS DE GAZ MÉTHANE POUR LA CLIMATISATION ESTIVALE, TRÈS ÉNERGIQUE, PAR UNE MACHINE ÉLECTRIQUE AIR/EAU HAUTE EFFICIENCE.L’IMMEUBLE EN QUESTION? DESTINÉ À DES ACTIVITÉS? RÉCEPTIF, ET? EN PRÉVISION DE LA RÉNOVATION COMPLÈTE DU SYSTÈME DE CLIMATISATION D’ÉTÉ ET INVERNALE.THE SYSTÈMES SERONT INSÉRÉS DANS UN CONTEXTE DE BÂTIMENT EXISTANT. DANS CE CONTEXTE, LES NOUVELLES INSTALLATIONS COUVERTES PAR CE PROJET SERONT INCLUSES, À SAVOIR: A) SYSTÈME DE CHAUFFAGE ET DE REFROIDISSEMENT AVEC DILATATION DIRECTE ET DÉBIT DE RÉFRIGÉRANT VARIABLE, AVEC UNITÉ? EN INTERNE PRINCIPALEMENT DANS L’AVIS, EN (French)
    16 December 2021
    0 references

    Identifiers