    Statements

    0 references
    197,794.0 Euro
    0 references
    439,542.2 Euro
    0 references
    45.0 percent
    0 references
    3 April 2018
    0 references
    3 April 2020
    0 references
    16 November 2020
    0 references
    COMUNE DI CASTELNUOVO BERARDENGA
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    INTERVENTO N.1: ISOLAMENTO TERMICO DELLE PARETI ESTERNE. L?OBBIETTIVO ? QUELLO DI RIDURRE LE DISPERSIONI PORTANDO LA TRASMITTANZA A 0,212 W/M2K, E LE RIENTRATE TERMICHE ESTIVE PORTANDO LA TRASMITTANZA TERMICA PERIODICA A 0.02 W/M2K. L?INTERVENTO PREVEDE LA REALIZZAZIONE SU TUTTI I PROSPETTI DEL FABBRICATO DI UN SISTEMA DI ISOLAMENTO TERMICO A CAPPOTTO REALIZZATO TRAMITE PANNELLI DI POLISTIRENE ESPANSO SINTERIZZATO DI SPESSORE MM120 CON FINITURA AD INTONACO ARMATO CON RETE IN FIBRA DI VETRO. LAVORAZIONI ESSENZIALI: MONTAGGIO PONTEGGIO, POSA STRATO DI ISOLANTE, SMONTAGGIO PONTEGGIO.INTERVENTO N.2: SOSTITUZIONE DI SERRAMENTI E INFISSI - INSTALLAZIONE SISTEMA DI OMBREGGIATURA.L?OBBIETTIVO ? QUELLO DI RIDURRE LE DISPERSIONI PORTANDO LA TRASMITTANZA DELL?INFISSO UW A 1,6W/M2K.L?INTERVENTO PREVEDE LA SOSTITUZIONE DI TUTTI I SERRAMENTI CON INFISSI IN ALLUMINIO A TAGLIO TERMICO E VETRO CAMERA DOPPIO ANTIRUMORE 66.2A/15/44.2, CON TRASMITTANZA TERMICA DELL? INTERO INFISSO COMPRESO TELAIO UW 1,6 (Italian)
    0 references
    INTERVENTION N.1: THERMAL INSULATION OF THE OUTER WALLS. OBJECTIVE? THAT OF REDUCING LOSSES BY BRINGING THE TRANSMITTANCE AT 0,212 W/M2K, AND THE SUMMER THERMAL LOSSES, BRINGING THE PERIODIC THERMAL TRANSMITTANCE TO 0.02 W/M2K. THE INTERVENTION PROVIDES FOR THE COMPLETION OF ALL THE BUILDING BLOCKS OF AN EIGHT-COAT THERMAL INSULATION SYSTEM CARRIED OUT VIA SINTERED POLYSTYRENE FOAM PANEL OF THICKNESSES OF M120 WITH PLASTER MADE OF WIRED GLASS FIBRE. ESSENTIAL WORK: SCAFFOLDING, INSULATION LAYER, DISASSEMBLY/DISMANTLING, NO 2: WINDOW FRAMES AND WINDOWS — INSTALLATION OF OMBREGGATURA.L? OBJECTIVE? DOES IT PROVIDE FOR THE REPLACEMENT OF ALL WINDOW FRAMES WITH ALUMINIUM CUTTING FRAMES AND HEAT-CUT WINDOWS AND DOUBLE ANTI-NOISE CHAMBER GLASS 66.2A/15/44.2, WITH A THERMAL TRANSMITTANCE OF THERMAL TRANSMITTANCE, BY REDUCING THE LOSSES BY BRINGING THE TRANSMITTANCE OF THE FIXED UW TO 1,6W/M2K.L.? FIXED WHOLE CONTAINER, INCLUDING CHASSIS UW 1,6 (English)
    0 references
    INTERVENTION NO 1: ISOLATION THERMIQUE DES PAROIS EXTÉRIEURES. LA CIBLE? RÉDUCTION DES DISPERSIONS EN APPORTANT LA TRANSMITTANCE À 0,212 W/M2K, ET LES RENTRÉES THERMIQUES ESTIVALES APPORTANT LA TRANSMISSION THERMIQUE PÉRIODIQUE À 0,02 W/M2K. LE PROJET IMPLIQUE LA RÉALISATION D’UN SYSTÈME D’ISOLATION THERMIQUE AVEC UN SYSTÈME D’ISOLATION THERMIQUE CONSTITUÉ DE PANNEAUX EN POLYSTYRÈNE EXPANSÉ FRITTÉ D’ÉPAISSEUR MM120 ET DE PLÂTRE RENFORCÉ AVEC MAILLE DE FIBRE DE VERRE SUR TOUTES LES FAÇADES DU BÂTIMENT. RÉALISATION ESSENTIELLE: ASSEMBLAGE D’ÉCHAFAUDAGE, POSE DE COUCHE ISOLANTE, DÉMONTAGE PONTEGGIO.INTERVENTO N.2: REMPLACEMENT DE WINDOWS ET WINDOWS — INSTALLATION DE OMBREGGIATURA SYSTEM.L?OBJECTIF? POUR RÉDUIRE LES DISPERSIONS EN PORTANT LA TRANSMITTANCE DE L’APPAREIL UW À 1,6 W/M2K.L. INTERVENTION PRÉVOIT LE REMPLACEMENT DE TOUTES LES FENÊTRES PAR COUPE THERMIQUE EN ALUMINIUM FENÊTRES ET CHAMBRE DOUBLE EN VERRE ANTI-BRUIT 66.2A/15/44.2, PAR TRANSMISSION THERMIQUE DE LA? CADRE ENTIER, Y COMPRIS UW 1.6 (French)