RIVER ENERGY S.R.L. (Q2038087)
Jump to navigation
Jump to search
Project Q2038087 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | RIVER ENERGY S.R.L. |
Project Q2038087 in Italy |
Statements
9,915.0 Euro
0 references
19,830.0 Euro
0 references
50.0 percent
0 references
12 July 2016
0 references
29 August 2018
0 references
15 January 2017
0 references
RIVER ENERGY S.R.L.
0 references
L'INTERVENTO, SINTETICAMENTE, CONTA NELL'INSTALLAZIONE DI UN MISURATORE DI LIVELLO SUL CANALE, IN COMUNICAZIONE CON LA CENTRALE, TALE DA PERMETTERE ALL'OPERATORE DI SAPERE IN TEMPO REALE IL LIVELLO DEL CANALE. IN TEMPO REALE, QUINDI, L'OPERATORE PUO' DECIDERE, QUALORA LA PORTATA DEL CORSO D'ACQUA FOSSE ECCESSIVA, DI CHIUDERE (O REGOLARE) L'ACCESSO AL CANALE PER EVITARE L' INGHIAIAMENTO DEL CANALE, APRIRE (O REGOLARE) LA PARATOIA SULLA DESABBIATRICE, PRESERVANDO DALL'INGHIAIAMENTO IL CANALE, LA VASCA DI CARICO E LA SUCCESSIVA TURBINA. SI RIMANDA ALLA RELAZIONE ALLEGATA PER I DETTAGLI (Italian)
0 references
THE ACTION, IN SUMMARISED FORM, COUNTS IN THE INSTALLATION OF A LEVEL METER ON THE CHANNEL, IN COMMUNICATION WITH THE POWER STATION, ENABLING THE OPERATOR TO KNOW THE LEVEL OF THE CHANNEL IN REAL TIME. IN REAL TIME, THEREFORE, THE OPERATOR MAY DECIDE, IN THE EVENT THAT THE EXTENT OF THE COURSE OF WATER IS EXCESSIVE, TO CLOSE (OR ADJUST) ACCESS TO THE CHANNEL IN ORDER TO AVOID THE SWINGING-UP OF THE CANAL, TO OPEN (OR TO SETTLE) THE GATE ONTO THE DESABBIOATRICE, WHILE PRESERVING THE CHANNEL, THE LOAD TANK AND THE NEXT TURBINE. REFER TO ATTACHED REPORT FOR DETAILS (English)
0 references
L’INTERVENTION, CONCIS, COMPTE DANS L’INSTALLATION D’UN COMPTEUR DE NIVEAU SUR LE CANAL, EN COMMUNICATION AVEC LE PANNEAU DE COMMANDE, AFIN QUE L’OPÉRATEUR PUISSE CONNAÎTRE EN TEMPS RÉEL LE NIVEAU DU CANAL. EN TEMPS RÉEL, PAR CONSÉQUENT, L’OPÉRATEUR PEUT DÉCIDER, SI LE DÉBIT DU COURS D’EAU EST EXCESSIF, DE FERMER (OU AJUSTER) L’ACCÈS AU CHENAL POUR EMPÊCHER LE CHENAL D’ÊTRE PAVÉ, OUVRIR (OU RÉGLER) LA CLOISON SUR LE DESABBIATRICE, EN PRÉSERVANT DU CHENAL, DU RÉSERVOIR DE CHARGEMENT ET DE LA TURBINE SUIVANTE. VEUILLEZ CONSULTER LE RAPPORT CI-JOINT POUR PLUS DE DÉTAILS. (French)
16 December 2021
0 references
Identifiers
G21F18000100007
0 references