Closure of Waste Water Sanitation Systems – Connection to Vaíde Valley Water Treatment Plant (Q2982798)

From EU Knowledge Graph
Revision as of 06:12, 16 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q2982798 in Portugal
Language Label Description Also known as
English
Closure of Waste Water Sanitation Systems – Connection to Vaíde Valley Water Treatment Plant
Project Q2982798 in Portugal

    Statements

    0 references
    206,262.0 Euro
    0 references
    242,661.0 Euro
    0 references
    85.0 percent
    0 references
    6 January 2020
    0 references
    30 June 2022
    0 references
    APIN - EMPRESA INTERMUNICIPAL DE AMBIENTE DO PINHAL INTERIOR, E.I.M., S.A.
    0 references
    Q3054883 (Deleted Item)
    0 references
    0 references

    40°12'54.22"N, 8°15'49.82"W
    0 references
    A operação “Fecho de Sistemas de Saneamento de Águas Residuais – Ligação à ETAR de Vale de Vaide”, pretende executar 1,92 Km de coletores gravíticos, 46 ramais de ligação, com ligação ao Subsistema de Saneamento da ETAR de Vale de Vaide e tratamento final na ETAR de Vale de Vaide, com descarga do efluente na linha de água localizada na proximidade da ETAR. (Portuguese)
    0 references
    The operation Closure of Waste Water Sanitation Systems Connection to the Water Treatment Plant of Vaide Valley, intends to execute 1.92 Km of gravitic collectors, 46 connecting branches, with connection to the Subsystem of Sanitation of the Water Treatment Plant of Vale de Vaide and final treatment in the treatment plant of Vale de Vaide, with discharge of the effluent in the water line located in the vicinity of the treatment plant. (English)
    9 July 2021
    0 references
    L’opération Fermeture des systèmes d’assainissement des eaux usées Lien à la station d’épuration de Vale de Vaide, prévoit d’exécuter 1,92 km de collecteurs gravitiques, 46 branches de raccordement, avec raccordement au sous-système d’assainissement de Vale de Vaide WWTP et traitement final à la station d’épuration de Vale de Vaide, avec rejet de l’effluent dans la conduite d’eau située à proximité de la station d’épuration. (French)
    7 December 2021
    0 references
    Der Betrieb Closure of Wastewater Sanitation Systems Link zum Vale de Vaide WWTP, beabsichtigt, 1,92 Km gravitische Kollektoren, 46 Verbindungszweige, mit Anschluss an das Sanitation Subsystem von Vale de Vaide WWTP und Endbehandlung im Vale de Vaide WWTP durchzuführen, mit Ableitung des Abwassers in die Wasserleitung in der Nähe des WWTP. (German)
    16 December 2021
    0 references
    Vila Nova de Poiares, Poiares (Santo André)
    0 references

    Identifiers

    POSEUR-03-2012-FC-001218
    0 references