Works at the Water Treatment Station of S João do Peso (Q2982579)

From EU Knowledge Graph
Revision as of 06:11, 16 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q2982579 in Portugal
Language Label Description Also known as
English
Works at the Water Treatment Station of S João do Peso
Project Q2982579 in Portugal

    Statements

    0 references
    212,998.0 Euro
    0 references
    250,585.0 Euro
    0 references
    85.0 percent
    0 references
    1 March 2018
    0 references
    29 May 2020
    0 references
    MUNICÍPIO DE VILA DE REI
    0 references
    Q2991038 (Deleted Item)
    0 references
    0 references

    39°42'59.22"N, 8°4'10.70"W
    0 references
    Esta operação surge no sentido de dar resposta à necessidade detetada de reformulação dos equipamentos existentes, consistindo na substituição de duas unidades existentes por apenas uma ETAR, visando reduzir os custos que lhes estão associados, maximizar os recursos disponibilizados e cumprir os parâmetros de descarga, a fim de concorrer para a diminuição da poluição das massas de água. (Portuguese)
    0 references
    This operation is designed to meet the detected need for recasting of existing equipment, consisting of the replacement of two existing plants with only one sewage plant, with a view to reducing the associated costs, maximising the resources available and complying with the discharge parameters in order to contribute to the reduction of pollution of water bodies. (English)
    9 July 2021
    0 references
    Cette opération est conçue pour répondre au besoin identifié de refonte des équipements existants, consistant en le remplacement de deux unités existantes par une seule station d’épuration, dans le but de réduire les coûts associés, d’optimiser les ressources mises à disposition et de respecter les paramètres de rejet, afin de contribuer à la réduction de la pollution des masses d’eau. (French)
    7 December 2021
    0 references
    Mit diesem Vorhaben soll der festgestellten Notwendigkeit Rechnung getragen werden, bestehende Anlagen neu zu formulieren, die darin bestehen, zwei bestehende Einheiten durch nur eine WWTP zu ersetzen, um die damit verbundenen Kosten zu senken, die zur Verfügung gestellten Ressourcen zu maximieren und die Ableitungsparameter einzuhalten, um zur Verringerung der Verschmutzung von Wasserkörpern beizutragen. (German)
    16 December 2021
    0 references
    Vila de Rei, São João do Peso
    0 references

    Identifiers

    POSEUR-03-2012-FC-000829
    0 references