Extension of São Teotónio water supply system – Casa Nova da Cruz (Q2982502)

From EU Knowledge Graph
Revision as of 20:07, 15 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q2982502 in Portugal
Language Label Description Also known as
English
Extension of São Teotónio water supply system – Casa Nova da Cruz
Project Q2982502 in Portugal

    Statements

    0 references
    174,088.0 Euro
    0 references
    204,809.0 Euro
    0 references
    85.0 percent
    0 references
    26 June 2018
    0 references
    6 January 2020
    0 references
    MUNICÍPIO DE ODEMIRA
    0 references
    0 references
    0 references

    37°30'10.48"N, 8°41'5.39"W
    0 references
    A operação consta da ligação da rede existente na povoação de Casa Nova da Cruz, cujo abastecimento é feito a partir de uma origem não controlada, à rede de distribuição de S. Teotónio. Para o efeito, prevê-se que a conduta a instalar seja ligada na zona do Sobreirinho à conduta existente com origem no depósito do Derrouca onde será executado o nó de abastecimento geral para a nova conduta que terá uma extensão de 4933 m até à Casa Nova da Cruz. (Portuguese)
    0 references
    The operation is part of the connection of the existing network in the village of Casa Nova da Cruz, whose supply is made from an uncontrolled origin to the distribution network of S. Teotónio. For this purpose, it is expected that the pipeline to be installed will be connected in the area of the Sobreirinho to the existing pipeline originating in the deposit of the Derrouca where the general supply node will be executed for the new pipeline that will have an extension of 4933 m until the Casa Nova da Cruz. (English)
    9 July 2021
    0 references
    L’opération consiste en la connexion du réseau existant dans le village de Casa Nova da Cruz, dont l’approvisionnement est effectué d’origine non contrôlée, au réseau de distribution de S. Teotónio. À cette fin, il est prévu que le gazoduc à installer sera raccordé dans la zone de Sobreirinho au gazoduc existant en provenance du dépôt de Derrouca où le nœud général d’approvisionnement sera exécuté pour le nouveau gazoduc qui s’étendra de 4 933 m à Casa Nova da Cruz. (French)
    7 December 2021
    0 references
    Der Betrieb besteht aus der Anbindung des bestehenden Netzes im Dorf Casa Nova da Cruz, dessen Versorgung aus unkontrollierter Herkunft erfolgt, an das Vertriebsnetz von S. Teotónio. Zu diesem Zweck ist vorgesehen, dass die zu installierende Pipeline im Gebiet von Sobreirinho an die bestehende Pipeline mit Ursprung im Depot Derrouca angeschlossen wird, wo der allgemeine Versorgungsknoten für die neue Pipeline ausgeführt wird, die sich von 4 933 m nach Casa Nova da Cruz erstreckt. (German)
    15 December 2021
    0 references
    Odemira, São Teotónio
    0 references

    Identifiers

    POSEUR-03-2012-FC-000717
    0 references